<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://reports-public.ieso.ca/docrefs/stylesheet/PredispTotals_HTML_t1-1.xsl" ?>
<Document docID="PredispTotals" xmlns="http://www.ieso.ca/schema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.ieso.ca/schema https://reports-public.ieso.ca/docrefs/schema/PredispTotals_r1.xsd">
<DocHeader>
<DocTitle>Predispatch Totals Report</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-10-15T03:17:59</CreatedAt>
</DocHeader>
<DocBody>
<DeliveryDate>2026-10-15</DeliveryDate>
<Energies>
<HourlyConstrainedEnergy>
<DeliveryHour>1</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16762.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>316.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16445.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>557.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>1034.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>147.7</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>2</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16885.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>324.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16560.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>347.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>1034.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>147.2</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>3</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16558.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>313.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16245.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>301.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>1034.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>147.2</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>4</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16629.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>309.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16319.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>293.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>1035.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>146.7</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>5</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17476</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>318.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17157.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>807.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>954.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>228.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>6</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18470.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>361.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18108.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>495.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>240.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>857.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>7</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18795</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>358.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18436.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>195.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>422.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>675.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>8</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18912</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>370.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18541.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>194.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>551.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>546.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.5</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>9</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18791.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>391.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18400.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>194.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>467.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>614.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>336.1</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>10</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18032.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>372.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17660.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>522.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>303.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>794.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>11</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17660.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>359.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17301.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>641.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>279.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>818.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>12</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17816.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>357.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17459.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>647.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>278.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>819.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>13</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17852.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>351.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17500.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>647.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>284.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>813.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>14</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18195.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>372.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17823.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>142.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>316.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>782.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>15</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18294.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>369.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17924.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>142.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>284.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>813.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>16</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18880.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>384.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18495.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>142.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>402.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>695.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>17</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>19512.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>375.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>19137.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>142.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>455.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>511.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>451.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>18</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>19756.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>375.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>19380.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>143.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>491.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>453.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>19</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>19683.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>379.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>19304.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>143.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>442.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>502.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>20</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>19322.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>379.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18942.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>143.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>435.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>509.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>21</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18675.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>373.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>18302.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>143.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>474.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>480.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>463.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>22</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17677.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>353.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17324.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>142.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>240.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>857.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>320.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>23</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16563.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>354.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16209.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>229.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>941.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>240.4</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>24</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15579.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>334.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15244.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>481.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>236.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>991.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>190.7</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
</Energies>
</DocBody>
</Document>