<DocHeader>
<DocTitle>Planned Transmission Outages Occurring Next 30 Days</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-09-14T06:22:12</CreatedAt>
</DocHeader>
<DocBody>
<OutageRangeStart>2026-09-14T00:00:00</OutageRangeStart>
<OutageRangeEnd>2026-10-13T23:59:59</OutageRangeEnd>
<OutageRequest>
<OutageID>1-00213469</OutageID>
<PlannedStart>2026-10-06T06:30:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS QZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00229837</OutageID>
<PlannedStart>2026-09-24T09:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELGIN TS 28T6-HL3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6E2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6J2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6Q2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26HL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26HL3-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS D1B12BL</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS D1B13BL</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00238542</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00248696</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00249339</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAVELOCK TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00249610</OutageID>
<PlannedStart>2024-03-15T08:00:00</PlannedStart>
<PlannedEnd>2027-12-31T23:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00252399</OutageID>
<PlannedStart>2026-07-27T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T05:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS EL502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDA_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDEL569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDE_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDHT4L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00254385</OutageID>
<PlannedStart>2026-09-28T08:15:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-R1LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-R2LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-R1LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-R2LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINE PORTAGE SS 26-R1LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINE PORTAGE SS 26-R2LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R1LB.BIXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R1LB.LAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2LB.BIXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2LB.LAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00254916</OutageID>
<PlannedStart>2026-09-17T09:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEWTON TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259300</OutageID>
<PlannedStart>2026-09-13T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259671</OutageID>
<PlannedStart>2026-09-27T06:00:00</PlannedStart>
<PlannedEnd>2026-09-27T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2L76</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259672</OutageID>
<PlannedStart>2026-09-28T06:00:00</PlannedStart>
<PlannedEnd>2026-10-02T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D2L30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D2L301</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2-BO4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266040</OutageID>
<PlannedStart>2026-10-09T08:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KEITH TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEITH TS T11-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEITH TS T11-HT11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266170</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-26T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00267760</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268147</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 245</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 246</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 247</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 248</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 265</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 271</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268176</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-13T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS 44-L16D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268216</OutageID>
<PlannedStart>2026-03-17T10:30:00</PlannedStart>
<PlannedEnd>2026-11-11T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268449</OutageID>
<PlannedStart>2026-10-02T15:00:00</PlannedStart>
<PlannedEnd>2026-10-18T05:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2-BO4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K2L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00275116</OutageID>
<PlannedStart>2026-09-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L33P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00275117</OutageID>
<PlannedStart>2026-09-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L34P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00275118</OutageID>
<PlannedStart>2026-09-28T06:00:00</PlannedStart>
<PlannedEnd>2026-10-09T18:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L33P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L33P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS PSR33-L33</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00277371</OutageID>
<PlannedStart>2026-09-22T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00278936</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LINDSAY TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINDSAY TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00283208</OutageID>
<PlannedStart>2025-12-17T14:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BASIN RVSC 52</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285554</OutageID>
<PlannedStart>2026-09-05T16:00:00</PlannedStart>
<PlannedEnd>2027-03-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285558</OutageID>
<PlannedStart>2026-03-31T08:00:00</PlannedStart>
<PlannedEnd>2026-10-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285801</OutageID>
<PlannedStart>2026-09-05T15:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K1L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K2-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K2L65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC21K1-K1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D2-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286168</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDHURST TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDHURST TS T4-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDHURST TS T4Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286541</OutageID>
<PlannedStart>2026-09-16T04:00:00</PlannedStart>
<PlannedEnd>2026-11-06T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2002</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2102</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2202</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2322</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287114</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L20L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287153</OutageID>
<PlannedStart>2026-10-03T07:00:00</PlannedStart>
<PlannedEnd>2026-10-04T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C2P.CLXCR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2P.INXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2P.JJXJC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2P.JJXVJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT COLBORNE TS 43T1-C2P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287382</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-14T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287779</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-11-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS L2L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288370</OutageID>
<PlannedStart>2026-10-04T08:30:00</PlannedStart>
<PlannedEnd>2026-10-04T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38T6-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS 232T2-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.CAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.IJXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.INXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.INXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288469</OutageID>
<PlannedStart>2025-07-03T14:00:00</PlannedStart>
<PlannedEnd>2030-12-31T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS L33_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS L34_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288806</OutageID>
<PlannedStart>2026-09-15T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY FDR MOSES CTS 2002</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288960</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-21T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00289214</OutageID>
<PlannedStart>2026-10-01T08:15:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q28A-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-Q28A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q28A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q28A.ALXAB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>60 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00289788</OutageID>
<PlannedStart>2026-09-28T09:30:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T6-N21W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290050</OutageID>
<PlannedStart>2026-09-30T03:30:00</PlannedStart>
<PlannedEnd>2026-10-23T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T2-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L30L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS PL30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290287</OutageID>
<PlannedStart>2026-10-04T06:00:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKE TS 29T3-B20H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290459</OutageID>
<PlannedStart>2026-10-13T08:30:00</PlannedStart>
<PlannedEnd>2026-10-15T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-W7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38W7-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS L7_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W7.BUXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290612</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS 20-P4S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T5-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290614</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-12-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T7-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290615</OutageID>
<PlannedStart>2026-09-30T06:30:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DALE JCT 65P4S-52</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS 20-P4S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS P4S-2001</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P4S.DOXDA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290734</OutageID>
<PlannedStart>2026-09-15T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L34P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L34P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290756</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3-WT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS WT3L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291015</OutageID>
<PlannedStart>2026-10-03T09:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DWT1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS L25L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291857</OutageID>
<PlannedStart>2026-05-23T09:00:00</PlannedStart>
<PlannedEnd>2026-09-19T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-OLDT4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS OLDT4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292180</OutageID>
<PlannedStart>2026-03-27T16:00:00</PlannedStart>
<PlannedEnd>2026-09-17T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T11Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292309</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-12-13T23:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1T3-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS H1T2-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS 10-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.DEXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.HIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.WEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292312</OutageID>
<PlannedStart>2026-10-09T08:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C36P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-C36P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292313</OutageID>
<PlannedStart>2026-09-26T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C20R.AGXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C20R.AGXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C20R.FAXAG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C20R.FIXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C20R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C20R.FIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS T2-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS T4-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T1-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ISLINGTON TS 590T2-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ISLINGTON TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ISLINGTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ISLINGTON TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292322</OutageID>
<PlannedStart>2026-08-10T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292505</OutageID>
<PlannedStart>2026-09-29T06:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS DL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS OLD28T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS OLDT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X22.GRXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X22.GRXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X22.GRXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292533</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-K24G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS L25L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292537</OutageID>
<PlannedStart>2026-10-08T09:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AWT3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS K24G-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS L25L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292868</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N6M.CAXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N6M.CAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N6M.NAXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293452</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293456</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293516</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-H53Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T5-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T8-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293517</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-07T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K2L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 SS5.6-K2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293595</OutageID>
<PlannedStart>2026-09-18T06:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N582L.LOXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS 59-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS AWT13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS DL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT13_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT8L582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT8_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS L582WT13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS T13-WT13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>16 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293611</OutageID>
<PlannedStart>2026-10-05T09:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293913</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H1L82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS L76L82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294322</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294323</OutageID>
<PlannedStart>2026-09-01T06:00:00</PlannedStart>
<PlannedEnd>2026-11-05T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294324</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS K6FT1-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS L1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294328</OutageID>
<PlannedStart>2026-09-13T06:00:00</PlannedStart>
<PlannedEnd>2026-12-11T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS OLD_T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294329</OutageID>
<PlannedStart>2026-09-09T18:00:00</PlannedStart>
<PlannedEnd>2026-10-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS A1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS B2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS H1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294331</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-20T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294340</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H24S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS 6-H24S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS H24S-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294347</OutageID>
<PlannedStart>2026-08-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS 34-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294547</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1L51</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T1-K1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295071</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-P7B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P7B.BIXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 2P7B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295094</OutageID>
<PlannedStart>2026-10-13T06:15:00</PlannedStart>
<PlannedEnd>2026-11-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D1M.MIXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS 5-D1M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-D1M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295098</OutageID>
<PlannedStart>2026-08-26T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295112</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS R11</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS SC29</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-T11R11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS TSS11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295113</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS R11</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS SC29</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-T11R11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS TSS11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295115</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295116</OutageID>
<PlannedStart>2026-08-03T06:15:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D4M.OTXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D4M.OTXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS 5-D4M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-D4M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTER CREEK JCT B9D4M-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295118</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295123</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-HT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295132</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-09-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.GJXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.GJXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.LAXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295133</OutageID>
<PlannedStart>2026-09-20T06:00:00</PlannedStart>
<PlannedEnd>2026-09-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M1S.MIXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1S.MIXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1S.MOXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS 3-M1S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295134</OutageID>
<PlannedStart>2026-09-15T03:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX JCT 319E34M-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295144</OutageID>
<PlannedStart>2026-10-05T09:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7E: CECIL TS x ESPLANADE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295205</OutageID>
<PlannedStart>2025-09-29T12:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKESHORE TS 530-H76</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295208</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MOHAWK TS 20T1-B4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295228</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295286</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-R2LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-R2LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINE PORTAGE SS 26-R2LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2LB.BIXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2LB.LAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295379</OutageID>
<PlannedStart>2025-10-30T15:00:00</PlannedStart>
<PlannedEnd>2026-11-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS MTU05-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS SC2-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS SC2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295505</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1-E2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL527</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL542</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295506</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1-E2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL527</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL542</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295508</OutageID>
<PlannedStart>2026-07-19T12:15:00</PlannedStart>
<PlannedEnd>2026-10-02T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295512</OutageID>
<PlannedStart>2026-10-02T13:00:00</PlannedStart>
<PlannedEnd>2026-10-02T13:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H5P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H7P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS L561P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295517</OutageID>
<PlannedStart>2026-09-28T09:30:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-P9C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P9C.CHXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS 44-P9C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS L9Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS L9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS T4L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295554</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295560</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS HL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS KL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N582L.LOXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS 59-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295562</OutageID>
<PlannedStart>2026-09-22T09:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICKERING A SS L7Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS L9Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295577</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT16L72</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT16L75</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT16_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T16</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T16-HT16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T16-W4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295584</OutageID>
<PlannedStart>2026-10-11T06:15:00</PlannedStart>
<PlannedEnd>2026-10-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T2-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T4-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS 5T4-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7V.CAXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7V.DEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7V.GUXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7V.WAXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7V.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GUELPH NORTH JCT 2613D7V-2608</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295586</OutageID>
<PlannedStart>2026-09-20T06:15:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT JCT M20D-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295590</OutageID>
<PlannedStart>2026-09-08T06:15:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT NORTH JCT 399M21D-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295600</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295601</OutageID>
<PlannedStart>2026-09-08T06:45:00</PlannedStart>
<PlannedEnd>2026-09-19T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS 232T1-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWPORT JCT 44M32W-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295605</OutageID>
<PlannedStart>2026-09-22T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS DL33</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295606</OutageID>
<PlannedStart>2026-09-21T06:15:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS T3-M33W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M33W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.CAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.NEXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M33W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SALFORD JCT M33W-4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295608</OutageID>
<PlannedStart>2026-09-19T16:30:00</PlannedStart>
<PlannedEnd>2026-09-19T17:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS T4-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS 232T1-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWPORT JCT 44M32W-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>45 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295609</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T1-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T3-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.CAXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.FEXFE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.FEXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.GUXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.GUXFE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS T3-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GUELPH NORTH JCT 2613D6V-2602</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS TL4L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295623</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS R5</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T5-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T5-LT5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295671</OutageID>
<PlannedStart>2026-09-29T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS H2H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS H2L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS SC22H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS SC22H2-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS SC22SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T5-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T7-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295672</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS A2L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS A2L13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T6-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T9</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T9-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T9-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS 1SS2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295709</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-11-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T28C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K2L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L23L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L23L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L28_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L31_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P2L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAVELOCK TS 57-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T1-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEATON JCT 527T28C-MSO2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T31H.HAXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T31H.MJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T31H.MJXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILSON JCT 72T23C-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295733</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-L17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295747</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS T8-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295772</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295773</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L1K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L2K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SC12K-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T2K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T2K-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295774</OutageID>
<PlannedStart>2026-10-13T06:30:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS HL45</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295782</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295794</OutageID>
<PlannedStart>2026-10-13T06:00:00</PlannedStart>
<PlannedEnd>2026-11-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS EL502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS HT4L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS L560L569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDA_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDEL569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDE_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDHT4L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDL560_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295798</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T2-T22C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295800</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T1-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295804</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS OLDHL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295819</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS L47L64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295860</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS T1-HT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295862</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>J1B: KEITH TS x BRIGHTON BEACH CGS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295863</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KEITH TS HL5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295864</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-29T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KEITH TS AL5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295865</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KEITH TS L1P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295867</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KEITH TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295872</OutageID>
<PlannedStart>2026-10-08T06:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L32L42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295873</OutageID>
<PlannedStart>2026-09-16T06:30:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS HL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295874</OutageID>
<PlannedStart>2026-09-21T06:30:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS PL33</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295875</OutageID>
<PlannedStart>2026-10-05T06:30:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS DL32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295884</OutageID>
<PlannedStart>2026-09-15T06:30:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS T4P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295885</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS T4L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295886</OutageID>
<PlannedStart>2026-09-17T06:30:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L5K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295888</OutageID>
<PlannedStart>2026-09-18T06:30:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L14P1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295890</OutageID>
<PlannedStart>2026-09-24T06:30:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L14K1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295891</OutageID>
<PlannedStart>2026-09-23T06:30:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L8K1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295931</OutageID>
<PlannedStart>2026-10-07T07:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295977</OutageID>
<PlannedStart>2026-10-01T08:30:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COPELAND SS P2L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T12-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.DOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.ESXLS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.HEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.LSXCP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H1L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L10L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295991</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSEX TS T6-L9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSEX TS T6J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296046</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX GS TSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>21 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296061</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NAPANEE TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296072</OutageID>
<PlannedStart>2026-09-23T08:30:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN JCT 321L18W-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS 9-L18W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T3-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K11W.MAXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K11W.RUXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS 38-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T1-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T6-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T6Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K11W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K12W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L13W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L14W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L18W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296078</OutageID>
<PlannedStart>2026-09-24T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GODERICH TS 31T4-61M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GODERICH TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GODERICH TS T4Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GODERICH TS T4Z-Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296092</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS T3-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS T3-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS T3-SS1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296108</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MODELAND TS T4-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.BOXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.BOXWO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.LUXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.LUXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.LUXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.PLXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.WJXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.WJXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS 40-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WANSTEAD TS 41T2-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T5-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296127</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.BLXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.CEXGE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.DOXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.GEXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.GEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H6LC-L6-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296163</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FRONTENAC TS 3T3-Q3K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FRONTENAC TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296172</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296178</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T4-C14L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296180</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T4-C14L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296182</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T1-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T3-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.BEXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.BEXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.SCXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.SCXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS DL17</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS L17L32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WARDEN TS T4-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296187</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296195</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BROWN HILL TS 132T1-B88H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BROWN HILL TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296196</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BROWN HILL TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296200</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BROWN HILL TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296240</OutageID>
<PlannedStart>2026-09-29T06:00:00</PlannedStart>
<PlannedEnd>2026-10-09T20:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6Y.DUXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS D6Y-44</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P1-P3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P2-P3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T2-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296250</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS 54T2-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS 54T4-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS 54T7-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS T7E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.BJXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.CLXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXWH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXWY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS 40T3-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296253</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-H54Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS M10-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T11Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T6-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T7-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296278</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS EK</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-L17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296311</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT 61M18-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS TEMP_T7-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296312</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT 61M18-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>14 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296314</OutageID>
<PlannedStart>2026-09-29T07:00:00</PlannedStart>
<PlannedEnd>2026-10-13T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296326</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS SST16</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296348</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296670</OutageID>
<PlannedStart>2026-09-24T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V73R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H1L73</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT15L73</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-V73R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V73R.CLXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296671</OutageID>
<PlannedStart>2026-10-08T07:15:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS N27T1-S39M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-S39M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S39M.CAXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S39M.CAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S39M.SUXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SUMMERHAVEN SS 262-S39M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296672</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS 153-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS L82L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2-L82</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296674</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>AINSWORTH JCT 1203-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AINSWORTH JCT K6F-13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AINSWORTH JCT K6F-14</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARWICK TS 263T1-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARWICK TS 263T2-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.A4XBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXB2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.FJXVO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.FOXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.FOXVO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.M1XM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.M2XM2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.MAXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.MAXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXSJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXVO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.SIXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.SJXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS K6FT1-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS DS 24T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS JCT K6F-11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS JCT K6F-12</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS DS 27A-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296675</OutageID>
<PlannedStart>2026-09-26T13:00:00</PlannedStart>
<PlannedEnd>2026-10-30T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B12BL-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B13BL-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26-B12BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296683</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENORCHY JCT 7402T37B-MSO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296798</OutageID>
<PlannedStart>2025-11-27T08:00:00</PlannedStart>
<PlannedEnd>2027-04-04T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS 36T1-A6R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS A6R-TEMPNEWT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296803</OutageID>
<PlannedStart>2025-11-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS 36T2-A5RK</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS A5RK-TEMPNEWT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296914</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T5-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>16 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297059</OutageID>
<PlannedStart>2025-10-16T16:00:00</PlannedStart>
<PlannedEnd>2027-02-01T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-S7M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D2L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D2LT21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297259</OutageID>
<PlannedStart>2026-10-04T15:15:00</PlannedStart>
<PlannedEnd>2027-03-19T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SALFORD JCT M31W-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>90 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297260</OutageID>
<PlannedStart>2026-10-03T09:30:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>J1B.KEXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEITH TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEITH TS L1P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297862</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS KL41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297864</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS HT5L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297865</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS H2L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297866</OutageID>
<PlannedStart>2026-09-23T07:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS A2L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297867</OutageID>
<PlannedStart>2026-09-24T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS LT1L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297868</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS H2L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297869</OutageID>
<PlannedStart>2026-09-30T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS L1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297870</OutageID>
<PlannedStart>2026-10-06T06:15:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS SC23</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS SC23K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS SC23K-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS SC23SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297871</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS DLT1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297872</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS SS1-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297886</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS 14-B5QK</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS A2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS L3L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS L5_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298551</OutageID>
<PlannedStart>2026-10-05T09:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298558</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OAKVILLE TS 2 SS6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298635</OutageID>
<PlannedStart>2026-09-27T06:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PLEASANT TS 42T5-H29</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PLEASANT TS 42T7-H29</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PLEASANT TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PLEASANT TS T7V</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298704</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GLENDALE TS D9HSTEMP-4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS Q12SD9HS</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T4-D9HS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298743</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS 7000T1-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS J_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9: CALEDONIA TS x NORFOLK TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298746</OutageID>
<PlannedStart>2026-09-29T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS 117T6-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS M12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS M14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS M16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298755</OutageID>
<PlannedStart>2026-09-15T09:30:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HOGG1.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298776</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H1L39</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298818</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS 157T2-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298837</OutageID>
<PlannedStart>2026-09-09T08:30:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STIRTON TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STIRTON TS T4-L3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>36 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298840</OutageID>
<PlannedStart>2026-09-29T08:30:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WOODBRIDGE TS D6T3-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODBRIDGE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298848</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298849</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4.GLXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.MOXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B4-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS 20T1-B4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298850</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H2L40</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298851</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS 45T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298852</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298853</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L1L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298854</OutageID>
<PlannedStart>2026-09-14T12:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L1TL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298855</OutageID>
<PlannedStart>2026-09-15T12:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298856</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L9TL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298857</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L9WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298858</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298859</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L3WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298860</OutageID>
<PlannedStart>2026-09-17T12:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298861</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298862</OutageID>
<PlannedStart>2026-09-18T12:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298863</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L23L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298864</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T1-Q11S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298865</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298866</OutageID>
<PlannedStart>2026-09-22T12:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298867</OutageID>
<PlannedStart>2026-09-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS TL18L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298868</OutageID>
<PlannedStart>2026-09-23T09:30:00</PlannedStart>
<PlannedEnd>2026-09-23T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MURRAY TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MURRAY TS T12-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298869</OutageID>
<PlannedStart>2026-09-23T12:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS TL18L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298870</OutageID>
<PlannedStart>2026-09-24T07:00:00</PlannedStart>
<PlannedEnd>2026-09-24T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MURRAY TS T13</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MURRAY TS T13-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298871</OutageID>
<PlannedStart>2026-09-24T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS L20L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298872</OutageID>
<PlannedStart>2026-09-25T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T5-A6C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298873</OutageID>
<PlannedStart>2026-09-25T12:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T6-A7C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298874</OutageID>
<PlannedStart>2026-09-26T01:00:00</PlannedStart>
<PlannedEnd>2026-09-27T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5C.AJXAR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.AJXPU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.BUXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.CEXCG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.CEXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.CGXDA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.HAXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.HAXPU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.HJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.I2XW2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.IPXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.PUXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.PUXPU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.WEXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5C.WEXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-B5C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS 5-B5C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS DB5C</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS DB5C-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANLON TS 127T1-B5C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HARPERS JCT 92B5C-2601</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HARPERS JCT 92B5C-39</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PUSLINCH DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298878</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L25L40</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298882</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L26L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298884</OutageID>
<PlannedStart>2026-10-06T10:00:00</PlannedStart>
<PlannedEnd>2026-10-06T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3-Q12S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298885</OutageID>
<PlannedStart>2026-10-06T12:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L6L21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298887</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L20HT3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298888</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T3-D10S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298891</OutageID>
<PlannedStart>2026-10-08T12:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L29HT3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298892</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRMINGHAM TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRMINGHAM TS T1-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298893</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1TL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298894</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GAGE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GAGE TS T8-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298902</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-H36D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298947</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K2M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299057</OutageID>
<PlannedStart>2026-10-05T09:30:00</PlannedStart>
<PlannedEnd>2026-10-05T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS DL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299058</OutageID>
<PlannedStart>2026-10-05T12:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS DL24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299059</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299060</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1334</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299061</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CRYSTAL FALLS TS 7T5-H23S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.PEXCR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.PEXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.PEXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS 9-H23S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS H23S-9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299062</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299063</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299064</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1334</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299065</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299067</OutageID>
<PlannedStart>2026-10-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T7-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H1L501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H1L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T5-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299069</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299070</OutageID>
<PlannedStart>2026-10-09T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299072</OutageID>
<PlannedStart>2026-10-09T08:00:00</PlannedStart>
<PlannedEnd>2026-10-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DRYDEN TS 25-D5D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS HL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS PL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS PL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS R22</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS T22</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS T22-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS T22-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS T22-T22R22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS T22R22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS TSS22</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS TSS22-T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299075</OutageID>
<PlannedStart>2026-10-13T04:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299079</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299080</OutageID>
<PlannedStart>2026-10-13T10:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PINARD TS L2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299136</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEPEAN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEPEAN TS T3-M32S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299138</OutageID>
<PlannedStart>2026-09-27T07:00:00</PlannedStart>
<PlannedEnd>2026-09-27T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B6M.CAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MOXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS 3-B6M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MURILLO JCT P49-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SAPAWE JCT SPWE-5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299152</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-09-28T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS AL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299153</OutageID>
<PlannedStart>2026-01-26T08:00:00</PlannedStart>
<PlannedEnd>2026-12-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H24S.GRXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H24S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299160</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS PL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299161</OutageID>
<PlannedStart>2026-09-27T07:00:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M2W.MAXMW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MDXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.PIXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.PIXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOUWADGE DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOUWADGE TS 13T1-M2W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS M2W-13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299167</OutageID>
<PlannedStart>2026-09-27T07:00:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEMLO MINE JCT M2W-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.BLXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXMW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MDXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.PIXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.PIXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.WHXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.WIXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOUWADGE DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOUWADGE TS 13T1-M2W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS M2W-13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS M2W-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIC DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIC DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>UMBATA FALLS CGS 7028M2W-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITE RIVER DS 36T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITE RIVER DS 36T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299169</OutageID>
<PlannedStart>2026-09-28T12:00:00</PlannedStart>
<PlannedEnd>2026-09-30T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANITOULIN TS M25-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOULIN TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOULIN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOULIN TS T3-S2B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANITOULIN TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299195</OutageID>
<PlannedStart>2026-09-14T10:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D3D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T1-D11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299213</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SVC1Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299230</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KNOB JCT 3353L21S-298</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LITTLE LONG SS L20L21S</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299243</OutageID>
<PlannedStart>2026-09-14T13:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESPANOLA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPANOLA TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299262</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS 33T9-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS 33T9-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS AL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS AL27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS AL74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS SC21A-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS SS9</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T9</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299442</OutageID>
<PlannedStart>2026-09-16T07:00:00</PlannedStart>
<PlannedEnd>2026-09-17T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FINCH TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T1-C20R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300160</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300271</OutageID>
<PlannedStart>2026-10-02T06:15:00</PlannedStart>
<PlannedEnd>2026-10-09T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M7E.BRXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M7E.COXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M7E.COXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M7E.MIXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M7E.MIXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M7E.ORXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDHURST TS T2-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDHURST TS T4-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MUSKOKA TS T1-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300377</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T1M: MARATHON TS x TERRACE BAY SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300380</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>T1M: MARATHON TS x TERRACE BAY SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300384</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T1M: MARATHON TS x TERRACE BAY SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300419</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELMIRA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELMIRA TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300584</OutageID>
<PlannedStart>2026-10-11T07:00:00</PlannedStart>
<PlannedEnd>2026-11-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS HT4L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300889</OutageID>
<PlannedStart>2025-11-30T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-L22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300896</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-16T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS 27M1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300917</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS BSC1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS T1-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300948</OutageID>
<PlannedStart>2025-11-19T17:00:00</PlannedStart>
<PlannedEnd>2035-12-31T18:01:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA301: BECK 2 TS x NY NIAGARA 345 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300950</OutageID>
<PlannedStart>2025-11-19T17:00:00</PlannedStart>
<PlannedEnd>2035-12-31T18:01:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA302: BECK 2 TS x NY NIAGARA 345 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300960</OutageID>
<PlannedStart>2026-09-15T04:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS 240T2-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T6-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS L19L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS L19L29-L19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.CHXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.ERXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.ERXER</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.ERXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.HAXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.TOXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.TOXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T3-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HL38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HT14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301461</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301468</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301559</OutageID>
<PlannedStart>2026-10-05T04:00:00</PlannedStart>
<PlannedEnd>2026-10-05T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301695</OutageID>
<PlannedStart>2025-11-30T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 115_TMP7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 230_TMP7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301875</OutageID>
<PlannedStart>2026-01-27T09:00:00</PlannedStart>
<PlannedEnd>2026-11-23T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302002</OutageID>
<PlannedStart>2026-10-08T06:00:00</PlannedStart>
<PlannedEnd>2026-10-08T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K4.EXXEL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K4.MAXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS 16-K4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4D9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ROYAL OAK MATACHEWAN CTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302145</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A4L: ALEXANDER SS x Longlac TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302154</OutageID>
<PlannedStart>2026-09-16T09:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS KL9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302155</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MAGPIE TS 1212</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302156</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K2M.NOXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEEWATIN JCT 299SK1-15</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K2M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-SK1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302158</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-T6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6R-SS6CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302163</OutageID>
<PlannedStart>2026-10-05T16:00:00</PlannedStart>
<PlannedEnd>2026-11-09T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-L20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302164</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-15T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302166</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A.P. KAPUSKASING JCT L21SK38S-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L21L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.HJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.LIXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.LIXLI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.LIXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21S.KNXLI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21S.KNXTC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-L20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302168</OutageID>
<PlannedStart>2026-09-29T04:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS W6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302313</OutageID>
<PlannedStart>2025-12-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T17:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS YZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302997</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-05T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A.P. KAPUSKASING JCT L21SK38S-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L21L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.HJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.LIXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.LIXLI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20D.LIXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21S.KNXLI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21S.KNXTC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LITTLE LONG SS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS L20L21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS PL20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303784</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M2W.MAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304017</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304036</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS K6FT1-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304043</OutageID>
<PlannedStart>2026-10-05T16:00:00</PlannedStart>
<PlannedEnd>2026-11-09T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-L20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS L20L21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS PL20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304044</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICKLE LAKE SS 520E1C-106</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKLE LAKE SS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304068</OutageID>
<PlannedStart>2026-10-10T08:00:00</PlannedStart>
<PlannedEnd>2026-10-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-F25A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L25L30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304269</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSEX TS T6-L9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSEX TS T6J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304973</OutageID>
<PlannedStart>2026-03-06T15:30:00</PlannedStart>
<PlannedEnd>2026-11-11T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS OLD28T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS OLDT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305017</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>VINELAND DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VINELAND DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305041</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>VINELAND DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VINELAND DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305047</OutageID>
<PlannedStart>2026-09-28T06:15:00</PlannedStart>
<PlannedEnd>2026-10-05T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T1-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T4-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WATERLOO MTS 3 T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WATERLOO MTS 3 T1L6-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305777</OutageID>
<PlannedStart>2026-01-20T03:00:00</PlannedStart>
<PlannedEnd>2026-10-30T23:59:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NAPANEE GENERATING STATION 8433-N535N (D2T3-T3)</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305822</OutageID>
<PlannedStart>2026-06-01T17:45:00</PlannedStart>
<PlannedEnd>2026-09-21T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8-HT8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS TEMPH2-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>46 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305846</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21-HL16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Y1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305847</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19-HL2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19B1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305848</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20-HL3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20A1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306785</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRATHROY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306788</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRATHROY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306793</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRATHROY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306799</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRATHROY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306865</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B12BL: BURLINGTON TS x POWERLINE MTS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306898</OutageID>
<PlannedStart>2026-09-01T04:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306916</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS 31T1-A6R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306928</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307109</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307114</OutageID>
<PlannedStart>2026-10-01T12:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307579</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS 31T14-L14W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS HLA2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T14</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307624</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS 593M1-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS B_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS SS1-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T2B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307633</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS 593T1-H54Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T1Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307648</OutageID>
<PlannedStart>2026-09-25T12:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C5E.ESXMH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.DOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.ESXLS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.HEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.LSXCP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.D2XB2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.DOXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.DOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.H1XB2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.HEXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.JOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.JOXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.MAXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.STXRJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307649</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>P15C.CHXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307962</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GREELY DS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GREELY DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GREELY DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308080</OutageID>
<PlannedStart>2026-03-27T16:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS M9-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308088</OutageID>
<PlannedStart>2026-02-11T12:30:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B562E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B569B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T28-HT28</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308109</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CUMBERLAND TS 76T4-B40C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CUMBERLAND TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308122</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>Q29HM.HAXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HAXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HNXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HNXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308139</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS DL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308140</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS HT9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308162</OutageID>
<PlannedStart>2026-06-15T08:00:00</PlannedStart>
<PlannedEnd>2026-12-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SS3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308210</OutageID>
<PlannedStart>2026-10-05T09:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CROWLAND TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308211</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308213</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308224</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS EZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS E_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS SS2-E1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308233</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLTON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308330</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-11-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28R27-PA27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PA27.NIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308682</OutageID>
<PlannedStart>2026-02-18T11:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308748</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K12W.RUXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K12W.RUXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS 38-K12W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T2-K12W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T5-K12W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T5E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K11W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K12W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L13W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L14W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L18W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308831</OutageID>
<PlannedStart>2026-04-15T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 668</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS PL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308845</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T2-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T4-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R14T.ERXER</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R14T.ERXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R14T.ERXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R14T.TOXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1L14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS L5L14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T2-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308864</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N582L: NANTICOKE TS x LONGWOOD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308886</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A.P. KAPUSKASING JCT L21SK38S-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L21L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21S.KNXLI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21S.KNXTC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LITTLE LONG SS L20L21S</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LITTLE LONG SS L21-SS1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309134</OutageID>
<PlannedStart>2026-03-12T16:30:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BFN JCT 653W4H-9989</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309262</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT8L582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309285</OutageID>
<PlannedStart>2026-09-23T06:00:00</PlannedStart>
<PlannedEnd>2026-09-23T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H5P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H7P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS L561P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309328</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS OLDAL15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309329</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS OLDAL27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309332</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T4-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309333</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309336</OutageID>
<PlannedStart>2026-10-09T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309642</OutageID>
<PlannedStart>2026-09-26T07:00:00</PlannedStart>
<PlannedEnd>2026-09-27T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ENBRIDGE KEYSER CTS S2N-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310268</OutageID>
<PlannedStart>2026-03-12T11:30:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310277</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-05T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HINCHEY TS T4Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310278</OutageID>
<PlannedStart>2026-10-05T12:30:00</PlannedStart>
<PlannedEnd>2026-10-05T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HINCHEY TS T4Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310279</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HINCHEY TS T3B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310281</OutageID>
<PlannedStart>2026-10-07T07:00:00</PlannedStart>
<PlannedEnd>2026-10-07T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HINCHEY TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310303</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310513</OutageID>
<PlannedStart>2026-10-12T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ISLAND FALLS CGS IS G4</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310531</OutageID>
<PlannedStart>2026-09-29T09:30:00</PlannedStart>
<PlannedEnd>2026-09-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 682</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310726</OutageID>
<PlannedStart>2026-09-28T04:00:00</PlannedStart>
<PlannedEnd>2026-10-01T17:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCARBORO TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCARBORO TS T23-C15L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCARBORO TS T24</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCARBORO TS T24-C3L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310787</OutageID>
<PlannedStart>2026-10-09T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS HT9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310793</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T37B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310816</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENORCHY JCT 7402T37B-MSO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310846</OutageID>
<PlannedStart>2026-05-23T09:00:00</PlannedStart>
<PlannedEnd>2026-10-17T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS JBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311026</OutageID>
<PlannedStart>2026-09-28T06:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D2BUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D2L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDR27</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT27</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS SS17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311027</OutageID>
<PlannedStart>2026-10-01T16:00:00</PlannedStart>
<PlannedEnd>2026-11-23T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D2BUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDR27</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT27</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R27</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS SS17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311084</OutageID>
<PlannedStart>2026-09-15T06:30:00</PlannedStart>
<PlannedEnd>2026-09-15T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311085</OutageID>
<PlannedStart>2026-09-15T16:30:00</PlannedStart>
<PlannedEnd>2026-09-15T17:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311104</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-05T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS L14L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311107</OutageID>
<PlannedStart>2026-10-09T15:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R14T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS L14L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311154</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS JL541</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS JL543</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS JL550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS JL552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS J_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311160</OutageID>
<PlannedStart>2026-09-14T06:00:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M33W.NEXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311360</OutageID>
<PlannedStart>2026-10-05T04:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311490</OutageID>
<PlannedStart>2026-09-15T05:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS 3103T1-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS AB</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311865</OutageID>
<PlannedStart>2026-09-15T00:00:00</PlannedStart>
<PlannedEnd>2026-12-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312007</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-04T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T6-K4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312122</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M32W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312181</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KENORA TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312183</OutageID>
<PlannedStart>2026-09-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-18T14:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS DS 27AL-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS DS B1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312393</OutageID>
<PlannedStart>2026-08-05T04:00:00</PlannedStart>
<PlannedEnd>2026-12-11T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>28 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312403</OutageID>
<PlannedStart>2026-04-27T07:00:00</PlannedStart>
<PlannedEnd>2027-12-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T1-D1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312410</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS 31T13-L18W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS SS13</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T13</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312464</OutageID>
<PlannedStart>2026-08-10T06:00:00</PlannedStart>
<PlannedEnd>2026-10-14T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312485</OutageID>
<PlannedStart>2026-10-06T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312486</OutageID>
<PlannedStart>2026-09-24T07:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312510</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS H1H4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312630</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-04T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES MTS 2201F1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES MTS 2201F1B-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312648</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-04T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>F1B.FOXFF</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-FFMS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312652</OutageID>
<PlannedStart>2026-09-23T06:00:00</PlannedStart>
<PlannedEnd>2026-09-24T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>AGINCOURT TS 63T5-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AGINCOURT TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.AGXAG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.AGXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.FIXAG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.FIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.MAXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T4-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312653</OutageID>
<PlannedStart>2026-09-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>AGINCOURT TS 63T5-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AGINCOURT TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.AGXAG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.AGXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.FIXAG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.FIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C4R.MAXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T4-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS L4L74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312877</OutageID>
<PlannedStart>2026-04-20T15:00:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312921</OutageID>
<PlannedStart>2026-09-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SC2.4B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SS2-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS T5B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312938</OutageID>
<PlannedStart>2026-09-14T06:15:00</PlannedStart>
<PlannedEnd>2026-10-02T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MEAFORD TS A1-OS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS C2-S2S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2S.MEXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313014</OutageID>
<PlannedStart>2026-09-28T04:00:00</PlannedStart>
<PlannedEnd>2026-09-29T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313032</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS W6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313034</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS W1L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313035</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS W2L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313063</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M1-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M3-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23T3-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23T4-B4E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T4Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313107</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS PL503</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R6</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-T6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS W6L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS W6L504</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS W6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313114</OutageID>
<PlannedStart>2026-09-25T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS T25</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS T25-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313117</OutageID>
<PlannedStart>2026-09-28T11:30:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 864</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 865</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 874</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313118</OutageID>
<PlannedStart>2026-08-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313126</OutageID>
<PlannedStart>2026-09-08T06:00:00</PlannedStart>
<PlannedEnd>2026-09-17T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS23-T23R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS24-T24R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24-HT24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313129</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STAYNER TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313131</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WOODROFFE TS 24-C7BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODROFFE TS A1A2-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODROFFE TS C7BM-71</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODROFFE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODROFFE TS T3-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODROFFE TS T3Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313173</OutageID>
<PlannedStart>2026-09-30T03:30:00</PlannedStart>
<PlannedEnd>2026-09-30T04:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L30L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS PL30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313177</OutageID>
<PlannedStart>2026-09-30T03:30:00</PlannedStart>
<PlannedEnd>2026-10-23T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T2-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313319</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-HT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313328</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28R27-PA27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L27_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27</EquipmentName>
<EquipmentType>VoltageRegulator</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-L27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL26L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PA27.NIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313350</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITBY TS 40T2-T26C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313374</OutageID>
<PlannedStart>2026-08-09T17:00:00</PlannedStart>
<PlannedEnd>2026-12-05T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2-T4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2BUS-TEMP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313396</OutageID>
<PlannedStart>2026-06-23T14:00:00</PlannedStart>
<PlannedEnd>2026-10-31T21:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELL CREEK CTS TT_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS ENERCORP_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS LINDE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS ASHGROVE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS NORAMPTRENT_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS SANOFI_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS STEM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS UOFT_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COTE GOLD CTS LOAD-LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS 1X7DRA_SW</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS 1Y7DRA_SW</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO KENILWORTH CTS 7Y6DRA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO KENILWORTH CTS 8X6DRA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS GCPOWER_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FLAKEBOARD TS TT_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS PLACERDOMECA_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JBL CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS ENPOWINC_DRASW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX GS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MCMASTER CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS HCE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS HHSC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS OPG_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS STELCO_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS STEM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS UOG_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PANABRASIVES CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS T6_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS ESSROC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RAINY RIVER GOLD CTS LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WEYERHAEUSER DRYDEN CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313417</OutageID>
<PlannedStart>2026-09-29T04:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANT TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313454</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS 593M2-Y</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS SS2-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T1Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEXTSTAR TS Y_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313515</OutageID>
<PlannedStart>2026-05-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-MSO6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-MSO7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313528</OutageID>
<PlannedStart>2026-09-28T08:30:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LORNE PARK TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LORNE PARK TS T2-B15C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313529</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T6-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313533</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEAMSVILLE TS 18Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.HAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.SAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.WI2XWI2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS 115Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313550</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31SC21L-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS L21L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313594</OutageID>
<PlannedStart>2026-09-29T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS 37K13J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K13J.JOXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K13J.MAXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K13J.STXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS 38-K13J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313614</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31SC21L-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313619</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEAMSVILLE TS 18Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.HAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.SAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.WI2XWI2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS 115Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313623</OutageID>
<PlannedStart>2026-09-23T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PALERMO TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313758</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313766</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-H8LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H8LC-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H8LC-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H8LC.CEXGE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-H8LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS L8L18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313771</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313775</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-HT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1SC1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313909</OutageID>
<PlannedStart>2026-10-12T16:00:00</PlannedStart>
<PlannedEnd>2026-10-24T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T1-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T2-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313921</OutageID>
<PlannedStart>2026-09-10T20:30:00</PlannedStart>
<PlannedEnd>2026-09-14T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313927</OutageID>
<PlannedStart>2026-09-06T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313928</OutageID>
<PlannedStart>2026-09-06T08:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313932</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-13T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313933</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H53Z: LAKESHORE TS x WINDSOR LAUZON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313935</OutageID>
<PlannedStart>2026-09-12T06:00:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L20-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-T3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS OLDL20-T4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313939</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313940</OutageID>
<PlannedStart>2026-09-22T11:30:00</PlannedStart>
<PlannedEnd>2026-09-22T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313946</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>V41N: NOVA SS x SCOTT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313950</OutageID>
<PlannedStart>2026-09-20T00:15:00</PlannedStart>
<PlannedEnd>2026-09-20T06:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D10H.DEXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D10H.ELXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D10H.WAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D10H.WAXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D10H.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-D10H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELMIRA TS 33T1-D10H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELMIRA TS 33T2-D10H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALMERSTON TS 28D10H-83</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WALLENSTEIN JCT 83D10H-26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WALLENSTEIN JCT 83D10H-28</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313951</OutageID>
<PlannedStart>2026-10-04T07:15:00</PlannedStart>
<PlannedEnd>2026-10-04T15:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38T6-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS 232T2-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T2L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.CAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.IJXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.INXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31W.INXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M31W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313954</OutageID>
<PlannedStart>2026-09-21T09:30:00</PlannedStart>
<PlannedEnd>2026-09-21T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313956</OutageID>
<PlannedStart>2026-09-25T07:15:00</PlannedStart>
<PlannedEnd>2026-09-28T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CEDAR TS 5-B5C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS DB5C</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANLON TS 127T1-B5C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANLON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANLON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PUSLINCH DS 265B5CB6C-LLO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PUSLINCH DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PUSLINCH DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313959</OutageID>
<PlannedStart>2026-09-28T06:00:00</PlannedStart>
<PlannedEnd>2026-09-28T17:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-F11C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-F12C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS KBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L20-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS T2K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313961</OutageID>
<PlannedStart>2026-09-28T06:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313963</OutageID>
<PlannedStart>2026-10-04T08:30:00</PlannedStart>
<PlannedEnd>2026-10-18T07:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS 278K12-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS L7L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T2L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313964</OutageID>
<PlannedStart>2026-09-28T17:45:00</PlannedStart>
<PlannedEnd>2026-09-29T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-F11C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS KBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313965</OutageID>
<PlannedStart>2026-09-29T06:00:00</PlannedStart>
<PlannedEnd>2026-09-29T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CEDAR TS AF11C</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>F11C.CEXCG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>F11C.FRXSP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>F11C.PRXSP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FREEPORT SS 60F11C-67</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FREEPORT SS 60F11C-K5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FREEPORT SS 60L9L11-11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-F11C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS F11C-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS KBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313966</OutageID>
<PlannedStart>2026-09-29T07:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T1-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T3-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.CAXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.CJXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.DEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.FEXFE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.FEXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.GUXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.GUXFE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.SCXGU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.WAXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS T3-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GUELPH NORTH JCT 2613D6V-2602</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WATERLOO NORTH 3 JCT 1917D6V-LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313967</OutageID>
<PlannedStart>2026-09-29T08:45:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FERGUS TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313968</OutageID>
<PlannedStart>2026-09-29T17:45:00</PlannedStart>
<PlannedEnd>2026-11-09T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-F11C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS F11C-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS KBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314058</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11CA-SS1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314105</OutageID>
<PlannedStart>2026-09-30T11:30:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A1B.AGXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AGUASABON SS T1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRACE BAY SS 77T1M</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314120</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314123</OutageID>
<PlannedStart>2026-10-02T06:15:00</PlannedStart>
<PlannedEnd>2026-11-06T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS 37-K6J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6J.JOXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6J.MAXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6J.RIXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS 38-K6J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS 3K6J-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS 3K6J-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS 3K6J-37</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS K6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T13</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T13-K6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14-K6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314140</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS K2K3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K3K4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS SC11K3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314218</OutageID>
<PlannedStart>2026-09-14T16:30:00</PlannedStart>
<PlannedEnd>2026-09-15T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT 61M18-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314227</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS 46-K23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K23C.APXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K23C.APXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS 38-K23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314272</OutageID>
<PlannedStart>2026-07-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLE RIVER JCT 53K6Z-K2Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TILBURY JCT 2316K2Z-53</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314809</OutageID>
<PlannedStart>2026-05-15T11:30:00</PlannedStart>
<PlannedEnd>2026-12-31T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ANDREWS TS TMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314944</OutageID>
<PlannedStart>2026-09-17T06:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANOVER TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MEAFORD TS A1-OS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS C2-S2S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS T5L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS T5L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S1H.HAXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2S.MEXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314945</OutageID>
<PlannedStart>2026-09-18T08:30:00</PlannedStart>
<PlannedEnd>2026-09-18T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANOVER TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS T5L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S1H.HAXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315398</OutageID>
<PlannedStart>2026-09-12T06:00:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS E8V-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS HL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS TL7L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315445</OutageID>
<PlannedStart>2026-09-26T05:30:00</PlannedStart>
<PlannedEnd>2026-09-27T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>ENBRIDGE KEYSER CTS BUS-1-IS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ENBRIDGE KEYSER CTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315623</OutageID>
<PlannedStart>2026-09-22T06:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T12-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315626</OutageID>
<PlannedStart>2026-09-16T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T11-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315736</OutageID>
<PlannedStart>2026-05-27T08:00:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B502M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315906</OutageID>
<PlannedStart>2026-09-10T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L7L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C7E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316062</OutageID>
<PlannedStart>2026-10-04T09:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C550VP.CHXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C550VP.CLXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C550VP.PJXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS AL550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS W2L550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS HT4L550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316080</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C16L.SHXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C16L.SHXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316083</OutageID>
<PlannedStart>2026-09-26T06:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C36P.M2XM2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C36P.M3XM3</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C36P.PKXM3</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316102</OutageID>
<PlannedStart>2026-10-09T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C20R.AGXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C20R.FIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316111</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICKERING B SS AT5_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316221</OutageID>
<PlannedStart>2026-09-25T12:00:00</PlannedStart>
<PlannedEnd>2026-09-26T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316393</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>P15C.CHXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316409</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.BLXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.CEXGE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.DOXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.GEXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.GEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H6LC-L6-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L6L13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316544</OutageID>
<PlannedStart>2026-06-05T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANTOINE TS 583L5A-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316545</OutageID>
<PlannedStart>2026-06-10T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANTOINE TS 583A4Z-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316709</OutageID>
<PlannedStart>2026-09-23T07:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HORNER TS 30M21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS 30M21-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS 30M23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS 30M23-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS 30M25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS 30M25-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS E-E1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS E1VT-E1-G2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS EJ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS EJ-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS E_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS SC1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS SC1E-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS SS1-E1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1E-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316828</OutageID>
<PlannedStart>2026-10-10T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R17T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS SC21</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS T15L17</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316874</OutageID>
<PlannedStart>2026-08-31T06:00:00</PlannedStart>
<PlannedEnd>2026-11-05T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS 92M7E-MTU05</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317299</OutageID>
<PlannedStart>2026-06-18T15:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ANDREWS TS TMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317388</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS HT6-T6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS SS6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS T6-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317665</OutageID>
<PlannedStart>2026-09-29T12:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>EVERETT TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS B_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS M5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS M7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317666</OutageID>
<PlannedStart>2026-09-30T09:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>EVERETT TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS B_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS M6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS M8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS Y_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317697</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LESLIE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LESLIE TS T2-C5R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317711</OutageID>
<PlannedStart>2026-09-24T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICKERING A SS AT4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS T4H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS T4L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317801</OutageID>
<PlannedStart>2026-06-24T12:00:00</PlannedStart>
<PlannedEnd>2026-10-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS L25L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317840</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2027-02-23T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X526B: LENNOX TS x BOWMANVILLE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317841</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X526B: LENNOX TS x BOWMANVILLE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317843</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2027-02-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317881</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS L15L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317893</OutageID>
<PlannedStart>2026-09-28T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORD OAKVILLE CTS 803-B16C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORD OAKVILLE CTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORD OAKVILLE CTS T1H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317920</OutageID>
<PlannedStart>2026-06-26T04:00:00</PlannedStart>
<PlannedEnd>2026-09-30T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-M32S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-WT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24-HT24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24-WT24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT21-WT21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317960</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>W21M.MAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W22M.MAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317973</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318065</OutageID>
<PlannedStart>2026-09-15T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T14:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L33P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318073</OutageID>
<PlannedStart>2026-09-14T06:15:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLISTON JCT 1807E8V-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS 9T3-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXEV</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.EVXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138E8V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318078</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS HT23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318087</OutageID>
<PlannedStart>2026-09-22T16:30:00</PlannedStart>
<PlannedEnd>2026-11-16T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS23-T23R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318102</OutageID>
<PlannedStart>2026-09-15T04:00:00</PlannedStart>
<PlannedEnd>2026-11-17T23:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2114</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318104</OutageID>
<PlannedStart>2026-09-15T04:00:00</PlannedStart>
<PlannedEnd>2026-11-17T23:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2122</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318107</OutageID>
<PlannedStart>2026-09-25T16:30:00</PlannedStart>
<PlannedEnd>2026-11-16T14:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS24-T24R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318108</OutageID>
<PlannedStart>2026-09-17T04:00:00</PlannedStart>
<PlannedEnd>2026-09-18T22:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2022</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2222</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2322</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2342</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>72 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318402</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318403</OutageID>
<PlannedStart>2026-09-26T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS 20-Q3N</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A1-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A1-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSNORTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSSOUTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A2-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A2Q3N</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A2Q3N-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS AQ11S-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MURRAY TS L3L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NIAGARA STANLEY TS 12T2-Q3N</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q3N.BEXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q3N.DJXNJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q3N.NJXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q3N.PJXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318407</OutageID>
<PlannedStart>2026-10-03T07:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-M571V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M571V.MIXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-M571V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318434</OutageID>
<PlannedStart>2026-10-12T06:30:00</PlannedStart>
<PlannedEnd>2026-10-16T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PALERMO TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318438</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS 45T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SS4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318775</OutageID>
<PlannedStart>2026-09-14T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>W44LC.CHXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.COXED</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.COXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.DJXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.DJXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.COXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.DJXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.DJXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.SPXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318842</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS 4-C2A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2A.AGXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2A.ALXAS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2A.ALXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318843</OutageID>
<PlannedStart>2026-10-01T12:00:00</PlannedStart>
<PlannedEnd>2026-10-01T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS 4-C2A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2A.AGXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2A.ALXAS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C2A.ALXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318844</OutageID>
<PlannedStart>2026-09-21T11:30:00</PlannedStart>
<PlannedEnd>2026-10-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER JCT 4C2A-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318955</OutageID>
<PlannedStart>2026-10-09T08:15:00</PlannedStart>
<PlannedEnd>2026-10-09T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITBY TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318961</OutageID>
<PlannedStart>2026-09-29T12:00:00</PlannedStart>
<PlannedEnd>2026-09-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITBY TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319264</OutageID>
<PlannedStart>2026-10-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319483</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319507</OutageID>
<PlannedStart>2026-09-19T08:00:00</PlannedStart>
<PlannedEnd>2026-09-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 3 T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 3 T3-C35P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319525</OutageID>
<PlannedStart>2026-09-21T09:00:00</PlannedStart>
<PlannedEnd>2026-09-24T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319617</OutageID>
<PlannedStart>2026-10-03T04:00:00</PlannedStart>
<PlannedEnd>2027-10-02T04:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTER CREEK JCT B9D2M-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTER CREEK JCT B9D4M-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319618</OutageID>
<PlannedStart>2026-10-03T04:00:00</PlannedStart>
<PlannedEnd>2026-10-03T04:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D2M.OTXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2M.OTXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D4M.OTXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D4M.OTXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS AL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS AL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS HL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS AL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS AL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS L2L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS L4L81</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTER CREEK JCT B9D2M-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319635</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>X4H.HIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X4H.WEXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319732</OutageID>
<PlannedStart>2026-09-17T16:00:00</PlannedStart>
<PlannedEnd>2026-09-18T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319843</OutageID>
<PlannedStart>2026-10-03T07:00:00</PlannedStart>
<PlannedEnd>2026-10-04T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A7C.ADXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7C.AJXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7C.AJXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7C.CRXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7C.GOXCY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7C.GOXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7C.HEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG DESN TS T8-A7C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-A7C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T6-A7C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319881</OutageID>
<PlannedStart>2026-09-20T07:00:00</PlannedStart>
<PlannedEnd>2026-09-20T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT SOUTH JCT 429M20D-41</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT TS 65-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GAXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GSXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.PRXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.PRXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.TRXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319882</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>POWERLINE JCT 144B12BL-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319914</OutageID>
<PlannedStart>2026-10-08T06:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B4V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319922</OutageID>
<PlannedStart>2026-09-21T04:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC13</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC13-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC13E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC13SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319966</OutageID>
<PlannedStart>2026-10-12T06:00:00</PlannedStart>
<PlannedEnd>2026-10-12T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS 15-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T3-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.ESXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.JEXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.JEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319967</OutageID>
<PlannedStart>2026-10-12T11:30:00</PlannedStart>
<PlannedEnd>2026-10-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS 15-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS 55Z7E-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T4-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.JEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.LAXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXTA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319976</OutageID>
<PlannedStart>2026-07-27T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T05:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R25S</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319995</OutageID>
<PlannedStart>2026-10-13T04:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SC24D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SC24SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320045</OutageID>
<PlannedStart>2026-09-16T06:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L22L44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L4L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS T3-T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320100</OutageID>
<PlannedStart>2026-10-03T06:15:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT SOUTH JCT 429M20D-41</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT TS 65-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GAXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GSXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.PRXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.PRXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.TRXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320101</OutageID>
<PlannedStart>2026-09-20T06:15:00</PlannedStart>
<PlannedEnd>2026-09-20T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT SOUTH JCT 429M20D-41</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT TS 65-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.DEXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GAXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.GSXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.PRXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.PRXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M20D.TRXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320102</OutageID>
<PlannedStart>2026-10-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>H83V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H83V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H83V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H83V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H83V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320106</OutageID>
<PlannedStart>2026-09-15T04:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q35M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L30TL35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L76TL35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL35_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320155</OutageID>
<PlannedStart>2026-10-12T06:00:00</PlannedStart>
<PlannedEnd>2026-10-12T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H7T.HUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H7T.WAXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H7T.WAXTI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-H7T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TIMMINS TS 19-H7T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TIMMINS TS P1H7T</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WARKUS JCT 62H7T-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WARKUS JCT 62H7T-50</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320159</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320181</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>S6F.FAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320208</OutageID>
<PlannedStart>2026-10-12T05:00:00</PlannedStart>
<PlannedEnd>2026-10-12T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FALCONBRIDGE KIDD MINESITE CTS 1202-H7T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320246</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>A3RM: HAWTHORNE TS x MERIVALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320262</OutageID>
<PlannedStart>2026-09-26T19:00:00</PlannedStart>
<PlannedEnd>2026-09-27T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BILBERRY CREEK TS A1-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BILBERRY CREEK TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BILBERRY CREEK TS T2-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CUMBERLAND DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CUMBERLAND DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GAMBLE H9A JCT 79H9A-66</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.CUXCU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.CUXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.GAXCU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORLEANS JCT 42H9A-77</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320280</OutageID>
<PlannedStart>2026-09-30T03:30:00</PlannedStart>
<PlannedEnd>2026-10-23T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M30A: MERIVALE TS x HAWTHORNE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320282</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T11Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320289</OutageID>
<PlannedStart>2026-09-16T07:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS AL41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS L7L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320291</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NOVA SS L25L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320292</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS HL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS L7L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320325</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 1 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 1 T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320391</OutageID>
<PlannedStart>2026-09-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T8-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T8-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T8-SS1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320392</OutageID>
<PlannedStart>2026-09-24T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS T7-SS2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320395</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M24L.GJXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M24L.LAXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320399</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC2J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS T6-Q5B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320404</OutageID>
<PlannedStart>2026-09-20T06:00:00</PlannedStart>
<PlannedEnd>2026-09-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M1S.MIXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1S.MIXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1S.MOXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS 3-M1S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320405</OutageID>
<PlannedStart>2026-09-20T06:00:00</PlannedStart>
<PlannedEnd>2026-09-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>29M1.IGXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2D.DRXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2D.MOXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320414</OutageID>
<PlannedStart>2026-09-21T04:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A4L: ALEXANDER SS x Longlac TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320417</OutageID>
<PlannedStart>2026-09-24T12:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARWICK TS 263T1-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BARWICK TS 263T2-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320422</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-29T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320423</OutageID>
<PlannedStart>2026-09-29T12:30:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320426</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-P3B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-R1LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-R1LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P3B.BIXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINE PORTAGE SS 26-R1LB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 2P3B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 P3B-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R1LB.BIXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R1LB.LAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320427</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-M3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M3E.EAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320428</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>AINSWORTH JCT 1203-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320429</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M3E: MANITOU FALLS GS x EAR FALLS TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>16 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320433</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320434</OutageID>
<PlannedStart>2026-10-09T06:00:00</PlannedStart>
<PlannedEnd>2026-10-09T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DRYDEN TS 25-K23D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K23D.KEXVE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K23D.VEXDR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K23D.VEXVE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K23D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TCPL VERMILLION BAY JCT 3411-25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TCPL VERMILLION BAY JCT 3411-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320435</OutageID>
<PlannedStart>2026-10-09T06:00:00</PlannedStart>
<PlannedEnd>2026-10-18T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K23D.KEXVE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K23D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TCPL VERMILLION BAY JCT 3411-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320436</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320539</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS A1HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS HT23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS KWT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L7HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS PWT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS23-T23R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-WT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT23-WT23GIS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT23GIS_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320552</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>T22C.CHXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.MJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.MJXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320555</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>C27P.GAXCF</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C27P.GAXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320573</OutageID>
<PlannedStart>2026-10-02T22:00:00</PlannedStart>
<PlannedEnd>2026-10-03T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS A15_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS A16_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320575</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PARRY SOUND TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARRY SOUND TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320588</OutageID>
<PlannedStart>2026-10-05T09:30:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L33P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS PSR33-L33</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320604</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>X1H.CAXHI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1H.DEXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1H.LAXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1H.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320651</OutageID>
<PlannedStart>2026-10-03T07:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 3 T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 3 T4-C36P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320652</OutageID>
<PlannedStart>2026-10-09T07:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 3 T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 3 T4-C36P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320658</OutageID>
<PlannedStart>2026-09-07T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320659</OutageID>
<PlannedStart>2026-09-17T14:00:00</PlannedStart>
<PlannedEnd>2026-10-13T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3-WT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320660</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS R6</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320663</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8-HT8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS TEMPH2-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320664</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS R9</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320666</OutageID>
<PlannedStart>2026-09-22T06:30:00</PlannedStart>
<PlannedEnd>2026-09-24T13:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 834</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320672</OutageID>
<PlannedStart>2026-09-23T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H1L501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2L501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320674</OutageID>
<PlannedStart>2026-09-29T07:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D3D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T1-D11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320678</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D3D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T1-D11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320681</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-X504E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS 33-X504E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS PL504</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R2L504</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R2L504-L504</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS W6L504</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X504E.ESXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320682</OutageID>
<PlannedStart>2026-09-26T13:00:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H11L-L11-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H7L-L7-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAIN TS H11L-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAIN TS H7L-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320683</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CRYSTAL FALLS SS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320684</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D2H.HUXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2H.HUXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2H.ISXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2H.P2XH2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2H.PIXP2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2H.TWXIS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-D2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-D2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320685</OutageID>
<PlannedStart>2026-09-26T13:00:00</PlannedStart>
<PlannedEnd>2026-09-26T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H11L-L11-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H7L-L7-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H2L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS K2L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS LT2L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320686</OutageID>
<PlannedStart>2026-09-28T15:00:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H11L-L11-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H7L-L7-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H2L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS K2L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS LT2L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320692</OutageID>
<PlannedStart>2026-09-28T06:15:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V.DEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.SCXGU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.WAXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GUELPH NORTH JCT 2613D6V-2602</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320693</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN DESN TS T14-W42L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-W42L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-W42L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W42L.BUXBD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W42L.BUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W42L.BUXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320729</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CEDAR TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS T2-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS T2E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320737</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATS FALLS TS 2-T22C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T22C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T2-T22C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.CHXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.MJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.MJXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320739</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS L47L64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320745</OutageID>
<PlannedStart>2026-10-12T09:00:00</PlannedStart>
<PlannedEnd>2026-10-12T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320747</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-10-28T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS PX3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS X3L520</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS X3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320748</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-10-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS X3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320752</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-T28C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T28C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS 54T2-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS 54T4-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA WILSON TS 54T7-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.BJXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.CLXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXWH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T23C.WJXWY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T28C.CLXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS 40T3-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320780</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELGIN TS 28HL3-26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS 28HL3-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS 28HL4-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS 28T6-HL3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6E2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6J2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELGIN TS T6Q2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320783</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K7: KARN TS x COMMERCE WAY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320788</OutageID>
<PlannedStart>2026-10-04T12:00:00</PlannedStart>
<PlannedEnd>2026-10-24T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS M31-M32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS M33</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS M33-M34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS SSQ</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320789</OutageID>
<PlannedStart>2026-10-05T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>S2N.KEXAD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2N.KEXEN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2N.SYXAD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2N.SYXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320797</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS Q7-Q8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R7</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R7-R7CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS R8</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS SS8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS SS8-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T8-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T8-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320806</OutageID>
<PlannedStart>2026-10-13T09:30:00</PlannedStart>
<PlannedEnd>2026-10-13T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320840</OutageID>
<PlannedStart>2026-10-05T08:30:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V: ORANGEVILLE TS x DETWEILER TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320905</OutageID>
<PlannedStart>2026-09-01T10:00:00</PlannedStart>
<PlannedEnd>2026-12-15T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1T3-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS H1T2-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS T3Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WESTBROOK JCT STRG27X2H-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320930</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T11:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320933</OutageID>
<PlannedStart>2026-10-01T06:30:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H2L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L20L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS T14L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320964</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN DESN TS T13-W43L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-W43L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS DL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS SC22D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS SC26D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T3D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T6L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T7D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-W43L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W43L.BUXBD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W43L.BUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W43L.BUXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320972</OutageID>
<PlannedStart>2026-10-08T15:00:00</PlannedStart>
<PlannedEnd>2026-10-09T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T11Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321109</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS 58-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T2-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T2X</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3T</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321121</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H54Z: LAKESHORE TS x WINDSOR LAUZON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321127</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-26T07:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321129</OutageID>
<PlannedStart>2026-10-06T06:00:00</PlannedStart>
<PlannedEnd>2026-11-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T2-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCHEIFELE MTS T3-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WATERLOO MTS 3 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WATERLOO MTS 3 T2L7-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321137</OutageID>
<PlannedStart>2026-09-14T09:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>P26W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P26W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321235</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>K11W.MAXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K11W.RUXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K1W.MAXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K1W.STXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321314</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINONA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321315</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS 52SS4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS SS4_SS5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321319</OutageID>
<PlannedStart>2026-09-26T16:00:00</PlannedStart>
<PlannedEnd>2026-12-01T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OXFORD JCT 639K7-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321333</OutageID>
<PlannedStart>2026-09-25T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRMINGHAM TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321354</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS KL14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321357</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-07T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K2L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 SS5.6-K2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321360</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS A15_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS A16_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321365</OutageID>
<PlannedStart>2026-10-03T16:00:00</PlannedStart>
<PlannedEnd>2026-10-04T22:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>J1B.KEXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEITH TS 23-J1B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321374</OutageID>
<PlannedStart>2026-10-05T12:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H10DE: HEARN SS x COPELAND SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321415</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>S7M.15X34</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.73XME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.BRX73</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.MAXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.SSXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321440</OutageID>
<PlannedStart>2026-10-13T04:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H2JK: HEARN SS x MANBY WEST TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321444</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S6F.FAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321448</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L1MB: ST. LAWRENCE TS x BROCKVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321449</OutageID>
<PlannedStart>2026-09-16T04:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L2M: ST. LAWRENCE TS x MERIVALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321510</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>D3M.MIXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321513</OutageID>
<PlannedStart>2026-09-24T12:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M1-M2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M3-M4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS J_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS SS3-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321514</OutageID>
<PlannedStart>2026-09-25T08:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M1-M2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M3-M4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87M4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS SS4-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS T4Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321579</OutageID>
<PlannedStart>2026-09-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321610</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS KL30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS W67L30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321611</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-07T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SLATER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SLATER TS T2-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321612</OutageID>
<PlannedStart>2026-10-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321614</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-X504E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS JL504</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS L04L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS 33-X504E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X504E.ESXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321671</OutageID>
<PlannedStart>2026-08-27T16:00:00</PlannedStart>
<PlannedEnd>2026-09-17T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1BUS-TEMP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L2BUS-TEMP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321707</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNB1B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNQ2-L2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNQ2T2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNT1B1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNT2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNT2B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321708</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS T2-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS T2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321724</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ1-L1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ1T1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ2-L1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ2T2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLT2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321741</OutageID>
<PlannedStart>2026-08-31T06:00:00</PlannedStart>
<PlannedEnd>2026-09-20T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1404</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOGG1.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321754</OutageID>
<PlannedStart>2026-09-18T13:30:00</PlannedStart>
<PlannedEnd>2026-09-18T14:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 144</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 145</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 148</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 149</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 151</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 152</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 154</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 157</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321756</OutageID>
<PlannedStart>2026-09-17T06:15:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-W14</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CRANBERRY JCT 70W14-WT1T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CRANBERRY JCT 70W8T-WT1T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LYONS JCT 84W14-WT1A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.BUXW1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.KCXS1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.KCXS2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.LYXCR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.STXLY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.W1XKC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W14.W2XKC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321769</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L3WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L9WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS WT2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321780</OutageID>
<PlannedStart>2026-09-17T04:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321863</OutageID>
<PlannedStart>2026-09-22T04:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>R2K: RICHVIEW TS x MANBY EAST TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321864</OutageID>
<PlannedStart>2026-09-23T04:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>R2K: RICHVIEW TS x MANBY EAST TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321870</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>S39M: SUMMERHAVEN SS x MIDDLEPORT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321907</OutageID>
<PlannedStart>2026-09-27T08:00:00</PlannedStart>
<PlannedEnd>2026-09-27T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITESHELL TS R25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322000</OutageID>
<PlannedStart>2026-09-28T04:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SC22D1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SC22SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322017</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>C3S.CFXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXAR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CEXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CHXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CJXNQ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.FIXNQ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.LIXWO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.MAXMD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.NQXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.NQXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.WOXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322019</OutageID>
<PlannedStart>2026-08-20T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS TMP4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322020</OutageID>
<PlannedStart>2026-09-19T02:00:00</PlannedStart>
<PlannedEnd>2026-09-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS AL41-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS AL41-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322022</OutageID>
<PlannedStart>2026-09-21T02:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS DL43-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS DL43-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322024</OutageID>
<PlannedStart>2026-09-24T02:00:00</PlannedStart>
<PlannedEnd>2026-09-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS AL41-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS AL41-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322025</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOUGLAS POINT TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOUGLAS POINT TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOUGLAS POINT TS T3-B24P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322026</OutageID>
<PlannedStart>2026-09-17T11:30:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELMIRA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELMIRA TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322033</OutageID>
<PlannedStart>2026-10-05T06:30:00</PlannedStart>
<PlannedEnd>2026-10-14T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322154</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUTTONVILLE TS 12T4-P45</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P45.PKXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-P45</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322157</OutageID>
<PlannedStart>2026-09-20T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BATHURST TS 85T1-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BATHURST TS 85T3-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS 55T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IBM MARKHAM CTS T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.BAXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.BAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.FIXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.IBXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.LEXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.PKXM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322163</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V71P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GRAINGER SOUTH JCT 492V71P-8803</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322173</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>R2LB.BIXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2LB.LAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322174</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>P7B.BIXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322180</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B6M.BIXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.CAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.KAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.KAXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MOXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MUXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MUXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SHXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SQXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.STXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322182</OutageID>
<PlannedStart>2026-10-13T12:00:00</PlannedStart>
<PlannedEnd>2026-10-13T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S30L.SAXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-S30L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS AL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS AL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS AL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS S30L-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322188</OutageID>
<PlannedStart>2026-09-01T10:00:00</PlannedStart>
<PlannedEnd>2026-12-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322189</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322212</OutageID>
<PlannedStart>2026-09-15T12:00:00</PlannedStart>
<PlannedEnd>2026-09-15T14:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L3WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L9WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS WT2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322215</OutageID>
<PlannedStart>2026-09-15T14:00:00</PlannedStart>
<PlannedEnd>2026-10-16T14:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS WT2-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322228</OutageID>
<PlannedStart>2026-09-01T00:00:00</PlannedStart>
<PlannedEnd>2027-04-30T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELORA JCT 656D6V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322233</OutageID>
<PlannedStart>2026-09-01T00:00:00</PlannedStart>
<PlannedEnd>2027-04-30T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEDLEY JCT S39M-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322241</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS T2-D7V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322291</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 5125T1-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 T1A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 TIE AB</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 TIE BA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 VAUGHAN MTS #4-T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322303</OutageID>
<PlannedStart>2026-08-20T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T10-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T11-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T12-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T7-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T8-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T9-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322308</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N93A.MKXAT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322336</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 4 T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 4 T1-P45</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322337</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA27: BECK 2 TS x NY NIAGARA 230 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322338</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA27: BECK 2 TS x NY NIAGARA 230 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322366</OutageID>
<PlannedStart>2026-09-24T11:00:00</PlannedStart>
<PlannedEnd>2026-09-24T14:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H22D.HJXKJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.HJXSJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.LIXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.LJXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.SJXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-H22D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322381</OutageID>
<PlannedStart>2026-09-17T12:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322382</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T11:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T5-A6C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322384</OutageID>
<PlannedStart>2026-09-17T12:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CROWLAND TS T6-A7C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322407</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS 50-P4S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T1-A4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T3-A4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322413</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TOMKEN TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322426</OutageID>
<PlannedStart>2026-08-26T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322428</OutageID>
<PlannedStart>2026-09-20T00:15:00</PlannedStart>
<PlannedEnd>2026-09-20T06:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSH MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSH MTS T1-D10</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322433</OutageID>
<PlannedStart>2026-10-06T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322435</OutageID>
<PlannedStart>2026-10-09T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T2-T22C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322438</OutageID>
<PlannedStart>2026-10-13T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>D2M.OTXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D2M.OTXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322440</OutageID>
<PlannedStart>2026-09-27T14:30:00</PlannedStart>
<PlannedEnd>2026-12-06T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS H8-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322447</OutageID>
<PlannedStart>2026-09-29T16:00:00</PlannedStart>
<PlannedEnd>2026-09-30T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS TEMPD11-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322448</OutageID>
<PlannedStart>2026-09-30T07:00:00</PlannedStart>
<PlannedEnd>2026-09-30T17:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K2.GUXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K2.GUXGU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K2.GUXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS 16-K2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D2D3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D2D8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T4Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS TEMPD11-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322449</OutageID>
<PlannedStart>2026-09-30T17:45:00</PlannedStart>
<PlannedEnd>2026-10-01T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS TEMPD11-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322450</OutageID>
<PlannedStart>2026-09-30T17:45:00</PlannedStart>
<PlannedEnd>2026-10-15T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS 16-K2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS CP20</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS CP21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS TEMPD2-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS TEMPK2-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322485</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H10DE: HEARN SS x COPELAND SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322492</OutageID>
<PlannedStart>2026-10-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H8J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322493</OutageID>
<PlannedStart>2026-10-08T12:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H8L569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322505</OutageID>
<PlannedStart>2026-09-11T13:50:00</PlannedStart>
<PlannedEnd>2026-09-14T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322545</OutageID>
<PlannedStart>2026-10-08T15:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:01:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H1L82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS L76L82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322554</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H10DE: HEARN SS x COPELAND SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322558</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-12-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322583</OutageID>
<PlannedStart>2026-09-17T05:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS 20-Q11S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS AQ11S</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WARNER ROAD JCT 2004Q11S-20</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322595</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS 153-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS L82L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2-L82</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN 4 JCT 426H82V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322598</OutageID>
<PlannedStart>2026-09-23T16:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BATHURST TS 85T1-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BATHURST TS 85T3-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS 55T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IBM MARKHAM CTS T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.BAXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.BAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.FIXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.IBXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.LEXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.PKXM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322604</OutageID>
<PlannedStart>2026-09-08T08:30:00</PlannedStart>
<PlannedEnd>2026-10-02T10:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RED ROCK CGS JCT 38T1B-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RED ROCK CGS JCT 38T1B-69</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322616</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-09-27T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322651</OutageID>
<PlannedStart>2026-09-14T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M32W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.NEXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322659</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 6 K6T11-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 8 K8T15-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322665</OutageID>
<PlannedStart>2026-10-02T08:30:00</PlannedStart>
<PlannedEnd>2026-10-02T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T1B.ALXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.NOXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.RAXWH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.REXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.REXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.SOXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.SOXWH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.STXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322672</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>S2S: STAYNER TS x OWEN SOUND TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322687</OutageID>
<PlannedStart>2026-08-27T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T07:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STAYNER TS T1D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322696</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322698</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T3-TL34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322724</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CRYSTAL FALLS TS 7T6-H24S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CRYSTAL FALLS TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322729</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-30T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MAIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAIN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAIN TS T4K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322732</OutageID>
<PlannedStart>2026-09-17T14:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3-WT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322742</OutageID>
<PlannedStart>2026-09-27T11:30:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLISTON JCT 1807E8V-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS 9T3-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXEV</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.EVXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138E8V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS HL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS TL7L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322743</OutageID>
<PlannedStart>2026-10-04T04:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X1P.MAXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MOXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322744</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SS3-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322745</OutageID>
<PlannedStart>2026-10-04T04:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MAZINAW DS AF2T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322767</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>D5A.CUXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.CUXIS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.CUXO2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.HAXO2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.O2XOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.GAXCU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.HAXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.O2XBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.O2XOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322834</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M1R.GLXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1R.GLXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1R.GRXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322841</OutageID>
<PlannedStart>2026-10-08T17:00:00</PlannedStart>
<PlannedEnd>2026-10-08T20:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS 34-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322842</OutageID>
<PlannedStart>2026-10-08T20:00:00</PlannedStart>
<PlannedEnd>2026-10-08T23:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS 34-P26W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P26W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P26W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-P26W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322843</OutageID>
<PlannedStart>2026-10-08T23:00:00</PlannedStart>
<PlannedEnd>2026-10-22T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>AUBREY FALLS JCT 20P25W-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322850</OutageID>
<PlannedStart>2026-10-13T06:00:00</PlannedStart>
<PlannedEnd>2026-10-23T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATS FALLS TS 2C7BM</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATS FALLS TS 2W6CS</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATS FALLS TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322851</OutageID>
<PlannedStart>2026-10-13T06:00:00</PlannedStart>
<PlannedEnd>2026-11-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATS FALLS TS 2C7BM</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATS FALLS TS 2C7BM-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FITZROY JCT 53C7BM-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322894</OutageID>
<PlannedStart>2026-09-25T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 27T9-L4D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PS4</EquipmentName>
<EquipmentType>PhaseShifter</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PS4-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PS4-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PS4-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322917</OutageID>
<PlannedStart>2026-09-26T13:00:00</PlannedStart>
<PlannedEnd>2026-10-31T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B13BL-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322920</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T20:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R25</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R25-T25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS SS25-T25R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-HT25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-WT25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322944</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322949</OutageID>
<PlannedStart>2026-10-05T06:00:00</PlannedStart>
<PlannedEnd>2026-10-05T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS V_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322956</OutageID>
<PlannedStart>2026-10-09T06:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5V.BRXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS 21-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B5V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36T3-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322958</OutageID>
<PlannedStart>2026-10-07T06:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4V.BRXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.UNXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS 21-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B4V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36T4-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322966</OutageID>
<PlannedStart>2026-09-25T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R25</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322967</OutageID>
<PlannedStart>2026-09-25T11:30:00</PlannedStart>
<PlannedEnd>2026-09-25T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R28</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322976</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323022</OutageID>
<PlannedStart>2026-09-28T06:30:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L4L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323023</OutageID>
<PlannedStart>2026-10-05T16:00:00</PlannedStart>
<PlannedEnd>2026-11-09T05:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELORA JCT 656D6V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323061</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323084</OutageID>
<PlannedStart>2026-09-25T13:00:00</PlannedStart>
<PlannedEnd>2026-10-30T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B12BL-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26-B12BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323094</OutageID>
<PlannedStart>2026-10-03T08:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JBL JCT 7782-C2P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323102</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A30L: LAKEHEAD TS x MACKENZIE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323105</OutageID>
<PlannedStart>2026-10-09T06:15:00</PlannedStart>
<PlannedEnd>2026-10-09T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS 157T2-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS T4-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HAXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HAXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HAXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HNXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HNXHN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q29HM.HNXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323106</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>29M1.IGXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D26A.DIXDI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D26A.DNXMK</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D26A.DRXDN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2D.DRXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2D.MOXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323160</OutageID>
<PlannedStart>2026-09-26T09:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2-T2T5CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323169</OutageID>
<PlannedStart>2026-09-14T16:30:00</PlannedStart>
<PlannedEnd>2026-09-15T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SUDBURY JCT 95L1S-LC4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323170</OutageID>
<PlannedStart>2026-09-14T16:30:00</PlannedStart>
<PlannedEnd>2026-09-14T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L1S.MAXSU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323171</OutageID>
<PlannedStart>2026-09-15T05:00:00</PlannedStart>
<PlannedEnd>2026-09-15T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L1S.MAXSU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323208</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KENT TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323233</OutageID>
<PlannedStart>2026-09-05T15:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DR_D1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DR_K1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323241</OutageID>
<PlannedStart>2026-10-07T06:00:00</PlannedStart>
<PlannedEnd>2026-10-07T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4V.AMXAM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.AMXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.BRXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.GJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.GJXGG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.HAXAGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.HAXASJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.SJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.UNXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.UNXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS 21-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B4V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36T4-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323243</OutageID>
<PlannedStart>2026-10-07T16:00:00</PlannedStart>
<PlannedEnd>2026-10-08T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B4V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323244</OutageID>
<PlannedStart>2026-10-08T16:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4V.AMXAM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.AMXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.BRXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.GJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.GJXGG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.HAXAGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.HAXASJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.SJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.UNXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4V.UNXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS 21-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B4V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36T4-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-B4V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323246</OutageID>
<PlannedStart>2026-10-09T06:00:00</PlannedStart>
<PlannedEnd>2026-10-09T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5V.BRXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5V.HAXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS 21-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B5V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36T3-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323248</OutageID>
<PlannedStart>2026-10-09T16:00:00</PlannedStart>
<PlannedEnd>2026-10-09T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5V.BRXUN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B5V.HAXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS 21-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36B5V-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS 36T3-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-B5V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323255</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 4 72B82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 4 T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323328</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15M1-L1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15M1-L6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323352</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>X523A.HAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323356</OutageID>
<PlannedStart>2026-10-13T04:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L12C: LEASIDE TS x CECIL TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323360</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A3M.MAXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323361</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M1S.MIXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1S.MOXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323367</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS 240T2-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323369</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T4-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323377</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTER RAPIDS GS T1-R21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323383</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323385</OutageID>
<PlannedStart>2026-09-14T11:30:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323392</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323458</OutageID>
<PlannedStart>2026-10-13T04:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS A1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323477</OutageID>
<PlannedStart>2026-09-09T17:45:00</PlannedStart>
<PlannedEnd>2026-11-05T17:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323545</OutageID>
<PlannedStart>2026-09-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-18T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS DS 27A-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIOUX NARROWS JCT 27AL-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323551</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T08:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 698</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323552</OutageID>
<PlannedStart>2026-09-18T15:45:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 698</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323553</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T08:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 698</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323554</OutageID>
<PlannedStart>2026-09-25T15:45:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 698</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323555</OutageID>
<PlannedStart>2026-09-16T06:00:00</PlannedStart>
<PlannedEnd>2026-09-22T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q10P-LLO26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q26M-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.MIXAW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.QUXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.QUXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323557</OutageID>
<PlannedStart>2026-09-15T03:00:00</PlannedStart>
<PlannedEnd>2026-09-15T04:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS K1L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L30L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323620</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-09-28T19:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>W3C.CAXWH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITEDOG FALLS SS 33-W3C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323621</OutageID>
<PlannedStart>2026-09-23T17:45:00</PlannedStart>
<PlannedEnd>2026-09-25T10:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323665</OutageID>
<PlannedStart>2026-09-14T00:00:00</PlannedStart>
<PlannedEnd>2026-09-14T00:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2114</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323667</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS HT2L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323672</OutageID>
<PlannedStart>2026-09-30T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H23B: HINCHINBROOKE SS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323673</OutageID>
<PlannedStart>2026-09-29T08:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T25B: CLARINGTON TS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323674</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T08:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLEARWATER BAY DS 40T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-SK1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.CLXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.FOXIP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.KJXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.KJXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323675</OutageID>
<PlannedStart>2026-09-16T16:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLEARWATER BAY DS 40T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-SK1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.CLXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.FOXIP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.KJXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.KJXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323683</OutageID>
<PlannedStart>2026-09-21T05:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A8-A9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A9-A10</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323684</OutageID>
<PlannedStart>2026-10-13T07:00:00</PlannedStart>
<PlannedEnd>2026-11-17T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE HW PLANT B TS 8T7A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE HW PLANT B TS 8T8A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE HW PLANT B TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323685</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITEDOG FALLS SS 33-W3C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323687</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A3M.MAXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.BIXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.CAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.KAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.KAXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MOXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MUXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MUXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SHXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SQXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.STXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323688</OutageID>
<PlannedStart>2026-09-24T16:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323689</OutageID>
<PlannedStart>2026-09-16T12:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS HT2L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323699</OutageID>
<PlannedStart>2026-10-04T08:00:00</PlannedStart>
<PlannedEnd>2026-10-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K6F.NEXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS DS 24T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS DS T1L-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS JCT K6F-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS JCT K6F-11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS JCT K6F-12</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NESTOR FALLS JCT K6F-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323703</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN JCT 321L13W-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN JCT 321L18W-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L13W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L18W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323732</OutageID>
<PlannedStart>2026-09-19T06:00:00</PlannedStart>
<PlannedEnd>2026-09-27T18:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L33P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323733</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>H23S.PEXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.PEXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323734</OutageID>
<PlannedStart>2026-09-19T06:00:00</PlannedStart>
<PlannedEnd>2026-10-09T19:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L34P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323747</OutageID>
<PlannedStart>2026-10-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323751</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NOVA CORUNNA CTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NOVA CORUNNA CTS T1-V41N</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323759</OutageID>
<PlannedStart>2026-10-01T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31SC21L-T36B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS T14L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323761</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T3-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323771</OutageID>
<PlannedStart>2026-09-20T00:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 JZ1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 ZJ2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323772</OutageID>
<PlannedStart>2026-10-03T06:15:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323774</OutageID>
<PlannedStart>2026-10-01T01:00:00</PlannedStart>
<PlannedEnd>2026-10-01T03:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D1L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D1L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1TL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL26L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS K1L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L26L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.QUXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.QUXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323775</OutageID>
<PlannedStart>2026-10-01T02:00:00</PlannedStart>
<PlannedEnd>2026-10-01T03:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q26M-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q28A-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323776</OutageID>
<PlannedStart>2026-10-08T16:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS 153-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS L82L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2-L82</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323777</OutageID>
<PlannedStart>2026-10-01T03:00:00</PlannedStart>
<PlannedEnd>2026-10-31T02:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q26M-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q28A-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG WEST JCT 64Q26M-25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323779</OutageID>
<PlannedStart>2026-10-05T07:00:00</PlannedStart>
<PlannedEnd>2026-10-09T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS SC1-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS SC1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS T1-B12</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323792</OutageID>
<PlannedStart>2026-09-15T06:00:00</PlannedStart>
<PlannedEnd>2026-09-15T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>P33C.CFXPA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323800</OutageID>
<PlannedStart>2026-09-25T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS T1-B12</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323801</OutageID>
<PlannedStart>2026-09-26T06:00:00</PlannedStart>
<PlannedEnd>2026-09-26T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>POWERLINE MTS T2-B13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323802</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5C: BURLINGTON TS x CEDAR TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323817</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323826</OutageID>
<PlannedStart>2026-09-21T11:30:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323829</OutageID>
<PlannedStart>2026-09-16T13:00:00</PlannedStart>
<PlannedEnd>2026-09-16T13:05:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ROMNEY WIND ENERGY CENTRE ROMNEYWF-LT.AG_T1</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323831</OutageID>
<PlannedStart>2026-09-11T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ1-L1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ1T1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323849</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANORDALE MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANORDALE MTS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323859</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARCHWOOD MTS MWD-CST2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARCHWOOD MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323862</OutageID>
<PlannedStart>2026-09-29T06:00:00</PlannedStart>
<PlannedEnd>2026-10-01T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS H1-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS H4-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323867</OutageID>
<PlannedStart>2026-10-02T06:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS D4-T1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323873</OutageID>
<PlannedStart>2026-09-23T11:30:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1L33</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323874</OutageID>
<PlannedStart>2026-09-28T09:30:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L24L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323875</OutageID>
<PlannedStart>2026-09-28T11:30:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L24L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323876</OutageID>
<PlannedStart>2026-09-30T11:30:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L25L33</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323877</OutageID>
<PlannedStart>2026-10-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P1L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323878</OutageID>
<PlannedStart>2026-10-05T11:30:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P1L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323882</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKE TS 29T3-B20H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKE TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323884</OutageID>
<PlannedStart>2026-09-28T09:00:00</PlannedStart>
<PlannedEnd>2026-10-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE GS T4-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>14 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323887</OutageID>
<PlannedStart>2026-10-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P1L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323888</OutageID>
<PlannedStart>2026-10-07T11:30:00</PlannedStart>
<PlannedEnd>2026-10-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P1L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323890</OutageID>
<PlannedStart>2026-10-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P1P2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323891</OutageID>
<PlannedStart>2026-10-13T11:30:00</PlannedStart>
<PlannedEnd>2026-10-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P1P2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323911</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS EZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS M32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS M34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS M36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS Z_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323923</OutageID>
<PlannedStart>2026-09-23T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS A16_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323926</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2027-05-31T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K1L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P1L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323927</OutageID>
<PlannedStart>2026-10-01T08:00:00</PlannedStart>
<PlannedEnd>2027-05-31T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 K2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323933</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C88H: CHATHAM SS x LAKESHORE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323936</OutageID>
<PlannedStart>2026-09-29T06:00:00</PlannedStart>
<PlannedEnd>2026-09-29T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>F3M.FOXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-F3M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323941</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ISLAND FALLS CGS IS G4</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323945</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3-Q12S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324045</OutageID>
<PlannedStart>2026-09-28T08:00:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L24L.LOXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L24L.LOXLD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L24L.LOXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 27-L24L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD DESN T14-L24L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-L24L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324049</OutageID>
<PlannedStart>2026-10-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>K6F.A4XBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXB2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.BJXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.FJXVO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.FOXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.FOXVO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.M1XM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.M2XM2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.MAXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.MAXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXSJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.NEXVO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.SIXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6F.SJXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324055</OutageID>
<PlannedStart>2026-09-28T04:00:00</PlannedStart>
<PlannedEnd>2026-09-28T18:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2022</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324063</OutageID>
<PlannedStart>2026-09-22T07:00:00</PlannedStart>
<PlannedEnd>2026-09-24T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS 3H2JK-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS 3H2JK-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS 3H2JK-37</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS H2-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T15-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324066</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS A1HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L7HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324067</OutageID>
<PlannedStart>2026-09-23T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D1HT24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS LS7HT24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324084</OutageID>
<PlannedStart>2026-09-30T03:30:00</PlannedStart>
<PlannedEnd>2026-10-23T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLWOOD MTS 7139-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLWOOD MTS ELWJQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLWOOD MTS ELWT2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLWOOD MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLWOOD MTS T2L30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324099</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-11-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C3S.CFXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>