<DocHeader>
<DocTitle>Planned Transmission Outages Occurring Next 2 to 3 Months</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-06-21T06:22:15</CreatedAt>
</DocHeader>
<DocBody>
<OutageRangeStart>2026-07-21T00:00:00</OutageRangeStart>
<OutageRangeEnd>2026-09-18T23:59:59</OutageRangeEnd>
<OutageRequest>
<OutageID>1-00238542</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00238578</OutageID>
<PlannedStart>2026-09-03T09:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B13BL.BRXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.BRXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.BUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.DUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.HOXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.HOXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.NEXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.POXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.POXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS DTL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS HT4L13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS K2L13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS D1B13BL</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00239128</OutageID>
<PlannedStart>2026-08-10T08:45:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BASIN TS 4-H3L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BASIN TS 4H3LR1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BASIN TS H3L-CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BASIN TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BASIN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BASIN TS T3-P1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BASIN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS 87-H3L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS BA14A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS H3L-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS H3L-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS H3L-87</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS T1-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS YA1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS YA2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.BAXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.BAXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.BAXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.BLXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.CAXGE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.GEXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H3L.MIXGE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H3L-L3-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H2L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS LT2L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS LT2L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-H3L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS D14L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS JL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00244910</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-10T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARDIFF TS BQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS T2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00249339</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAVELOCK TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00249610</OutageID>
<PlannedStart>2024-03-15T08:00:00</PlannedStart>
<PlannedEnd>2027-12-31T23:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00252395</OutageID>
<PlannedStart>2026-05-12T06:00:00</PlannedStart>
<PlannedEnd>2026-07-27T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS EL502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS HT28L562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS HT4-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS L560L569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B502M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B562E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDA_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDEL569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDE_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDHT4L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3T28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00252399</OutageID>
<PlannedStart>2026-07-27T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T05:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS EL502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDA_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDEL569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDE_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDHT4L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00254916</OutageID>
<PlannedStart>2026-09-17T09:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEWTON TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00257490</OutageID>
<PlannedStart>2026-09-11T07:15:00</PlannedStart>
<PlannedEnd>2026-09-11T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D8S.DEXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D8S.LEXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-D8S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS PL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS T4L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS 9-D8S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS A1-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259298</OutageID>
<PlannedStart>2026-08-31T06:00:00</PlannedStart>
<PlannedEnd>2026-09-04T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1TL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL26L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL26_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259300</OutageID>
<PlannedStart>2026-09-13T05:30:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259309</OutageID>
<PlannedStart>2026-07-19T06:00:00</PlannedStart>
<PlannedEnd>2026-07-31T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1L302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259321</OutageID>
<PlannedStart>2026-08-09T06:00:00</PlannedStart>
<PlannedEnd>2026-08-21T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL21L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259341</OutageID>
<PlannedStart>2026-08-23T05:30:00</PlannedStart>
<PlannedEnd>2026-09-04T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259344</OutageID>
<PlannedStart>2026-07-12T06:00:00</PlannedStart>
<PlannedEnd>2026-07-24T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1TL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266039</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T1-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266170</OutageID>
<PlannedStart>2026-09-02T07:30:00</PlannedStart>
<PlannedEnd>2026-09-14T19:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266296</OutageID>
<PlannedStart>2026-08-21T07:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS L5L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS PL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD JCT 80H6LC-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.BLXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.CEXGE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.DOXHE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.GEXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H6LC.GEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS 22-H6LC-L6-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L6L13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-H6LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266753</OutageID>
<PlannedStart>2025-12-04T07:00:00</PlannedStart>
<PlannedEnd>2026-08-31T17:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BORALEX TILBURY JCT 647K2Z-54</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENT TS 5-N5K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENT TS L2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N5K.KEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268147</OutageID>
<PlannedStart>2026-09-16T07:30:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 245</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 246</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 247</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 248</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 265</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 271</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268216</OutageID>
<PlannedStart>2026-03-17T10:30:00</PlannedStart>
<PlannedEnd>2026-11-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00269003</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00269009</OutageID>
<PlannedStart>2026-08-04T07:00:00</PlannedStart>
<PlannedEnd>2026-08-06T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00269010</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00269041</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3-A5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4-A5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T4A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00271417</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T17:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BILLINGS JCT 86-A3RM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BILLINGS JCT 86-A8M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00275165</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS 7000T1-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9.BJXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9.BJXNO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9.CAXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS 27-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS 27-N6M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS T3L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS 22T1-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VANESSA JCT 72C9-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00276886</OutageID>
<PlannedStart>2026-08-10T08:30:00</PlannedStart>
<PlannedEnd>2026-08-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q1Q2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q1Q2-Q1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00276932</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M585M.MIXMD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M585M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L81L85</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-M585M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00276947</OutageID>
<PlannedStart>2026-09-02T09:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARDIFF TS BQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00276957</OutageID>
<PlannedStart>2026-08-06T08:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GAGE TS T9</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00277053</OutageID>
<PlannedStart>2026-08-24T07:30:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H2L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00277371</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T1A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00278946</OutageID>
<PlannedStart>2026-08-05T04:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FINCH TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00280782</OutageID>
<PlannedStart>2026-08-25T10:30:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 632</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00282501</OutageID>
<PlannedStart>2025-12-29T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T07:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STAYNER TS T1D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00282667</OutageID>
<PlannedStart>2026-09-08T07:30:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA2.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 211</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 214</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 217</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 218</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 232</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 233</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 241</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 242</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS SSVT-1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1653</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1654</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00283208</OutageID>
<PlannedStart>2025-12-17T14:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BASIN RVSC 52</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285025</OutageID>
<PlannedStart>2026-08-25T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 225</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 226</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 227</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 228</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 270</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285119</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A22L.MKXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-A22L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-A22L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L22L93</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285159</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T14:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 214</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285439</OutageID>
<PlannedStart>2026-07-07T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS 20-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A1-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSNORTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSSOUTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A4Q2AH</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A4Q2AH-A4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS AQ11S-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285554</OutageID>
<PlannedStart>2026-09-04T08:00:00</PlannedStart>
<PlannedEnd>2027-03-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285555</OutageID>
<PlannedStart>2026-07-19T06:00:00</PlannedStart>
<PlannedEnd>2026-08-28T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS L21L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS PL521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS X4L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X521B.BOXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285556</OutageID>
<PlannedStart>2026-09-05T08:00:00</PlannedStart>
<PlannedEnd>2026-09-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS R56-X526B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X526B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS L523L526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X526B.LEXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285557</OutageID>
<PlannedStart>2026-09-04T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS KBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL520</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL522</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KX4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS T51-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X538N.LXXNS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285558</OutageID>
<PlannedStart>2026-03-31T08:00:00</PlannedStart>
<PlannedEnd>2026-10-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285801</OutageID>
<PlannedStart>2026-09-06T08:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K2-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286362</OutageID>
<PlannedStart>2026-09-08T06:15:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS 15-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T4-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.JEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.LAXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXTA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286363</OutageID>
<PlannedStart>2026-09-14T06:15:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS 15-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T3-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.ESXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.JEXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.JEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z7E.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286535</OutageID>
<PlannedStart>2026-08-14T17:30:00</PlannedStart>
<PlannedEnd>2026-08-14T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2508</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2522</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286541</OutageID>
<PlannedStart>2026-09-16T04:00:00</PlannedStart>
<PlannedEnd>2026-11-06T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2002</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2102</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2202</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2322</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286775</OutageID>
<PlannedStart>2026-09-02T17:30:00</PlannedStart>
<PlannedEnd>2026-09-02T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2614</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2622</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286778</OutageID>
<PlannedStart>2026-09-01T04:00:00</PlannedStart>
<PlannedEnd>2026-09-01T04:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2614</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2622</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286790</OutageID>
<PlannedStart>2026-09-01T04:00:00</PlannedStart>
<PlannedEnd>2026-09-02T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 345 KV AT5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286796</OutageID>
<PlannedStart>2026-09-11T17:30:00</PlannedStart>
<PlannedEnd>2026-09-11T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2208</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2214</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2322</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286797</OutageID>
<PlannedStart>2026-08-31T00:00:00</PlannedStart>
<PlannedEnd>2026-08-31T00:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2208</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2214</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2322</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287122</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H2L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT14L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GOREWAY TS 136T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GOREWAY TS 136T4-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GOREWAY TS 136T6-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS 45T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.CLXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.CLXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.GJXGO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.GOXGO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.KLXV3</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.V3XWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V43.WJXWO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODBRIDGE TS D6T3-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287126</OutageID>
<PlannedStart>2026-07-03T14:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANNON JCT 61M34H-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M34H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287149</OutageID>
<PlannedStart>2026-06-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-N580M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L80L86</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N580M.MDXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS 59-N580M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS DL580</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS L580WT11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V586M.MDXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>7 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287611</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A22L.MKXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-A22L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-A22L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287615</OutageID>
<PlannedStart>2026-06-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L21L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287748</OutageID>
<PlannedStart>2026-07-21T09:00:00</PlannedStart>
<PlannedEnd>2026-07-23T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 682</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00287889</OutageID>
<PlannedStart>2026-08-23T06:30:00</PlannedStart>
<PlannedEnd>2026-08-23T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FAUQUIER DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L2L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L3L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS 27H9K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SMOOTH ROCK FALLS DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SMOOTH ROCK FALLS DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288469</OutageID>
<PlannedStart>2025-07-03T14:00:00</PlannedStart>
<PlannedEnd>2030-12-31T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS L33_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS L34_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288711</OutageID>
<PlannedStart>2026-06-19T14:30:00</PlannedStart>
<PlannedEnd>2026-07-22T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS T6-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS T7-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288959</OutageID>
<PlannedStart>2026-09-13T07:00:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL93</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288965</OutageID>
<PlannedStart>2026-07-12T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>F25A.FOXMK</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-F25A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-F25A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L21L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288966</OutageID>
<PlannedStart>2026-07-24T16:00:00</PlannedStart>
<PlannedEnd>2026-07-24T17:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>F25A.FOXMK</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS AK1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS AK2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS EH</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS EL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS E_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS T2R2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L21L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288967</OutageID>
<PlannedStart>2026-07-25T07:00:00</PlannedStart>
<PlannedEnd>2026-07-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-M37L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS HL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS HL38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SVC1Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS T7-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS T7-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-M37L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288968</OutageID>
<PlannedStart>2026-07-26T07:00:00</PlannedStart>
<PlannedEnd>2026-07-26T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS T8-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288969</OutageID>
<PlannedStart>2026-08-08T16:00:00</PlannedStart>
<PlannedEnd>2026-08-08T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A22L.MKXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L22L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L22_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L22L93</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288970</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-09-01T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00289102</OutageID>
<PlannedStart>2026-07-17T06:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L23L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L31_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P2L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAVELOCK TS 57-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T1-T31H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T31H.HAXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T31H.MJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T31H.MJXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>34 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00289213</OutageID>
<PlannedStart>2026-07-20T06:15:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON DESN TS T15-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BEXNI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BUXBD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.MIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.NEXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00289944</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-10T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K24G.HJXHD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.HJXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.MJXMH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.PKXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.THXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 680</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 400</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290612</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS 20-P4S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T5-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290616</OutageID>
<PlannedStart>2026-08-31T07:30:00</PlannedStart>
<PlannedEnd>2026-09-11T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290618</OutageID>
<PlannedStart>2026-09-11T11:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS AL15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS AL27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T4-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290726</OutageID>
<PlannedStart>2026-08-10T13:00:00</PlannedStart>
<PlannedEnd>2026-08-17T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 678</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 680</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 682</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS L24_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILE HILL JCT 539K24G-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290734</OutageID>
<PlannedStart>2026-09-14T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L34P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L34P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291016</OutageID>
<PlannedStart>2026-09-13T12:00:00</PlannedStart>
<PlannedEnd>2026-09-25T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G25</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 1709-G26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 408</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS L25L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291054</OutageID>
<PlannedStart>2026-08-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLE RIVER JCT 53K6Z-K2Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELLE RIVER TS 143T2-K6Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.BEXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.BJXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.PJXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.TIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS 3T6-K6Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-K6Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291228</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS L3L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291822</OutageID>
<PlannedStart>2026-08-17T06:00:00</PlannedStart>
<PlannedEnd>2026-08-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B541C.CHXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS AL541</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS L21L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS R56-B541C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-B541C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291857</OutageID>
<PlannedStart>2026-05-23T09:00:00</PlannedStart>
<PlannedEnd>2026-09-19T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-OLDT4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS OLDT4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00291878</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LANXESS INC JCT 103N7S-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292180</OutageID>
<PlannedStart>2026-03-27T16:00:00</PlannedStart>
<PlannedEnd>2026-09-17T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T11Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292309</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-12-13T23:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1T3-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS H1T2-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS 10-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.DEXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.HIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.WEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292310</OutageID>
<PlannedStart>2026-08-28T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T17:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS L21L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS PL521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS X4L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X521B.BOXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292315</OutageID>
<PlannedStart>2026-08-17T11:30:00</PlannedStart>
<PlannedEnd>2026-08-28T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X21.GRXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X21.GRXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X21.GRXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292316</OutageID>
<PlannedStart>2026-08-19T12:00:00</PlannedStart>
<PlannedEnd>2026-08-19T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L24L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L25L33</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T25B.BVXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T25B.PJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292317</OutageID>
<PlannedStart>2026-08-21T12:00:00</PlannedStart>
<PlannedEnd>2026-08-21T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23B.BEXHI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS AL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS L3L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292322</OutageID>
<PlannedStart>2026-08-10T05:30:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292535</OutageID>
<PlannedStart>2026-08-17T13:00:00</PlannedStart>
<PlannedEnd>2026-08-17T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K24G.HJXHD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.HJXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.MJXMH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.PKXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24G.THXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 680</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS 400</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292576</OutageID>
<PlannedStart>2026-07-27T09:30:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H2L520</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292984</OutageID>
<PlannedStart>2026-08-21T09:00:00</PlannedStart>
<PlannedEnd>2026-08-21T21:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS AL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS AL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.LOXDY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.WIXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.WIXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L71L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L71L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293516</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-H54Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T5-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T8-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293589</OutageID>
<PlannedStart>2026-07-20T06:15:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B561M.BBXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B561M.BRXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B561M.WIXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B561M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS L501L563</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B561M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293591</OutageID>
<PlannedStart>2026-08-25T15:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B561M.BBXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B561M.BRXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B561M.WIXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B561M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS H6L561</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS L561P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B561M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS KL561</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS L61L71</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293592</OutageID>
<PlannedStart>2026-08-30T08:00:00</PlannedStart>
<PlannedEnd>2026-08-30T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B501M.BBXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.BJXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.WJXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS JL501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS L501L563</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293593</OutageID>
<PlannedStart>2026-08-30T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B501M.BBXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.BJXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.WJXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293594</OutageID>
<PlannedStart>2026-09-11T15:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B501M.BBXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.BJXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.WJXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS JL501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS L501L563</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293595</OutageID>
<PlannedStart>2026-09-13T06:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N582L.LOXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS 59-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS AWT13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS DL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT13_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT8L582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT8_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS L582WT13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS T13-WT13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>16 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293702</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-27T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P1P2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PL24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T2-P1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293913</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H1L82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS L76L82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294322</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294323</OutageID>
<PlannedStart>2026-09-01T05:45:00</PlannedStart>
<PlannedEnd>2026-11-05T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294324</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS K6FT1-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS L1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294325</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-15M1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K5W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 35T1-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294326</OutageID>
<PlannedStart>2026-09-13T07:00:00</PlannedStart>
<PlannedEnd>2026-09-13T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DRYDEN TS 25-E4D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E1C.EAXSE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E2R.BAXRJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E2R.BJXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E2R.BJXPA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E2R.EAXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E2R.RJXRL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E4D.DRXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E4D.EAXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E4D.SCXPE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-E1C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-E2R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-E4D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-M3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M3E.EAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PERRAULT FALLS DS 36T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RED LAKE JCT 583E2R-9471</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RED LAKE TS E2R-3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOUT LAKE JCT E4D-5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOUT LAKE JCT E4D-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SELCO JCT 77-70</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294327</OutageID>
<PlannedStart>2026-09-13T07:00:00</PlannedStart>
<PlannedEnd>2026-09-13T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-E1C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-E2R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-E4D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-M3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS L3L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS W1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS W1L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294328</OutageID>
<PlannedStart>2026-09-13T06:00:00</PlannedStart>
<PlannedEnd>2026-11-20T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS H2AR-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294329</OutageID>
<PlannedStart>2026-09-09T18:00:00</PlannedStart>
<PlannedEnd>2026-10-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS A1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS B2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS H1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294331</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-20T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294332</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-08T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.GJXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.GJXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.LAXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294333</OutageID>
<PlannedStart>2026-09-08T17:00:00</PlannedStart>
<PlannedEnd>2026-09-09T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B3E.BLXEL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3E.ELXEL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLIND RIVER TS 19-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS H1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294337</OutageID>
<PlannedStart>2026-08-31T23:30:00</PlannedStart>
<PlannedEnd>2026-09-01T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T1-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294338</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-09-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4E.ELXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLIND RIVER TS 19-B4E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23-B4E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS H1-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T1-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294340</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H24S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS 6-H24S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS H24S-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294345</OutageID>
<PlannedStart>2026-08-24T23:30:00</PlannedStart>
<PlannedEnd>2026-08-25T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T2-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294347</OutageID>
<PlannedStart>2026-08-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS 34-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294348</OutageID>
<PlannedStart>2026-08-23T08:00:00</PlannedStart>
<PlannedEnd>2026-08-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARMICHAEL FALLS JCT 3021-27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAUQUIER DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K STR 127A JCT 361H9K-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.CAXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.CAXOB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.FAXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.H9XMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.H9XSM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.HUXH9</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.HUXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.HUXSM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.MAXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.OBXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.SMXSM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-H9K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L1L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L1L9-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SMOOTH ROCK FALLS DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SMOOTH ROCK FALLS DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294349</OutageID>
<PlannedStart>2026-08-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON DS 2735T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-T1M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1M.PIXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1M.PIXMD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRACE BAY SS 77T1M</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294350</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H22D.HJXKJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.HJXSJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.LIXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.LJXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H22D.SJXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-H22D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295050</OutageID>
<PlannedStart>2026-08-16T07:00:00</PlannedStart>
<PlannedEnd>2026-08-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6T.C2XOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6T.P2XC2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6T.PIXP2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M9K.MJXM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M9K.MJXM2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M9K.MJXM3</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M9K.MSXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSONEE DS 15M9K-T1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSONEE DS 15M9K-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSONEE DS 15M9K-T3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSONEE SS 111M9K-15</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTER RAPIDS SS D6T-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-D6T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295071</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-P7B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P7B.BIXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 2P7B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295095</OutageID>
<PlannedStart>2026-08-25T07:00:00</PlannedStart>
<PlannedEnd>2026-08-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC2J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC2J-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295098</OutageID>
<PlannedStart>2026-08-26T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295099</OutageID>
<PlannedStart>2026-08-26T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295102</OutageID>
<PlannedStart>2026-07-09T08:00:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295104</OutageID>
<PlannedStart>2026-07-12T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>F25A.FOXMK</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-F25A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-F25A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295108</OutageID>
<PlannedStart>2026-08-25T07:00:00</PlannedStart>
<PlannedEnd>2026-08-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B3E.BLXEL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3E.ELXEL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BLIND RIVER TS 19-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M1-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M3-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23T3-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS A1-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS2-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T4Q-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295111</OutageID>
<PlannedStart>2026-07-27T09:30:00</PlannedStart>
<PlannedEnd>2026-08-14T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A22L.MKXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-A22L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-A22L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295114</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-15M1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K5W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 35T1-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295115</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-09-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS HL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295116</OutageID>
<PlannedStart>2026-08-03T06:15:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D4M.OTXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D4M.OTXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS 5-D4M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-D4M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTER CREEK JCT B9D4M-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295120</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-R21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21D.PIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21D.PIXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21D.PIXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295122</OutageID>
<PlannedStart>2026-08-09T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS 33-X26S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS 9-X26S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X26S.MAXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295126</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T19:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A22L.MKXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L22L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L22_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L22L93</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295134</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX JCT 319E34M-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295205</OutageID>
<PlannedStart>2025-09-29T12:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKESHORE TS 530-H76</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295379</OutageID>
<PlannedStart>2025-10-30T15:00:00</PlannedStart>
<PlannedEnd>2026-11-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS MTU05-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS SC2-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS SC2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295386</OutageID>
<PlannedStart>2026-07-13T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS T3-W71D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.WIXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS 38-W71D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L71L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L71L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L71_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295505</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1-E2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL527</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL542</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295506</OutageID>
<PlannedStart>2026-09-14T16:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1-E2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL527</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL542</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295507</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1-E2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL527</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL542</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295508</OutageID>
<PlannedStart>2026-07-19T12:15:00</PlannedStart>
<PlannedEnd>2026-10-02T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295560</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS HL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS KL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N582L.LOXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS 59-N582L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295572</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B561M.BBXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B561M.BRXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B561M.WIXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B561M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B561M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS KL561</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS L61L71</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295573</OutageID>
<PlannedStart>2026-08-30T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B501M.BBXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.BJXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B501M.WJXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE B SS 29-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS 40-B501M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS HL501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MILTON SS L501L570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295576</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C553VP.CHXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C553VP.PJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C553VP.PJXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C553VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-C553VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS A2L553</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS L553L560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-C553VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295590</OutageID>
<PlannedStart>2026-09-08T06:15:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT NORTH JCT 399M21D-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295591</OutageID>
<PlannedStart>2026-09-01T09:30:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295600</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295601</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-19T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS 232T1-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWPORT JCT 44M32W-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295604</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-08T08:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS T4-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS T5-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS 232T1-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXIN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M32W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWPORT JCT 44M32W-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>45 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295619</OutageID>
<PlannedStart>2026-09-14T05:15:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS 278K7-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS L7L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295624</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS R7</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS SS7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T7-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T7-LT7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T7A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T7D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295637</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HORNER TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1E-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T1Q-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T4-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T4-R2K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T4B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNER TS T4Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS A1HL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS HL2L21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2K.MJXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2K.MJXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1L14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1L17</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1L74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1L77</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2L72</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS SC22A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295654</OutageID>
<PlannedStart>2026-08-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COWAL JCT 53L45-251</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUART TS 247T1-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUART TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SPENCE SS 251-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295664</OutageID>
<PlannedStart>2026-07-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS 86-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COWAL JCT 53L44-86</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUART TS 247T2-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295667</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-22T15:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C88H.CHXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS 86-C88H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKESHORE TS 530-C88H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295715</OutageID>
<PlannedStart>2026-08-04T06:15:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D7F.DEXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7F.DEXK6</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7F.FRXK7</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D7F.SIXK6</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER JCT 59D7F-D1W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER JCT 59D9F-D1W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-D7F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FREEPORT SS 60L7L12-7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295732</OutageID>
<PlannedStart>2026-08-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T15:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL47</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL87</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC21</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC21K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC21K-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SS1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295733</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-L17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295749</OutageID>
<PlannedStart>2026-08-29T07:00:00</PlannedStart>
<PlannedEnd>2026-08-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS 15-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L1K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER TS T4-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.JEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.LAXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXTA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.TAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Z1E.WAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295754</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12T51-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS R51</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS T51</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS T51-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295771</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS 46-R24C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS L15L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS L16L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS L24_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R24C.APXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R24C.APXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R24C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS L24L72</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295772</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295782</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295804</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS HL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295860</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS T1-HT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295873</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS HL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295882</OutageID>
<PlannedStart>2026-09-10T06:30:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L6L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295883</OutageID>
<PlannedStart>2026-09-11T06:30:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L6K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38W12-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38W7-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295884</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS T4P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295885</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS T4L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295886</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L5K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295888</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L14P1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295922</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS X4L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295936</OutageID>
<PlannedStart>2026-09-16T07:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS AL41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS L7L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295937</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NOVA SS L25L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295940</OutageID>
<PlannedStart>2026-08-16T07:00:00</PlannedStart>
<PlannedEnd>2026-08-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>AYLMER TS 34T1-WT1A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AYLMER TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>AYLMER TS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295941</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L6L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295942</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295950</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LINDSAY TS 4T1-M81B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINDSAY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295969</OutageID>
<PlannedStart>2026-09-01T08:30:00</PlannedStart>
<PlannedEnd>2026-09-01T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6Y.DUXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T1A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L5D.DUXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS JL5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS L2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295973</OutageID>
<PlannedStart>2026-09-10T07:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 L27L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P2L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295974</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 L26L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295976</OutageID>
<PlannedStart>2026-08-07T09:30:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L7L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T13</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9DE.DOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9DE.ESXLS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9DE.HEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9DE.LSXCP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS K1L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L9L13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295977</OutageID>
<PlannedStart>2026-09-09T09:30:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COPELAND SS P2L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.DOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.ESXLS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.HEXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H10DE.LSXCP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS H1L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS L10L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295979</OutageID>
<PlannedStart>2026-08-04T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS 1SS2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS T3-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295993</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ISIDORE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. ISIDORE TS T2-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. ISIDORE TS T2J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296042</OutageID>
<PlannedStart>2026-07-06T09:00:00</PlannedStart>
<PlannedEnd>2026-08-14T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX GS TSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>21 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296046</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX GS TSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>21 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296050</OutageID>
<PlannedStart>2026-09-03T07:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 L23L51</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296056</OutageID>
<PlannedStart>2026-08-11T08:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARKE TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARKE TS SC2B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARKE TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296061</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NAPANEE TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296069</OutageID>
<PlannedStart>2026-09-04T07:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS HL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS L6L23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296098</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSEX TS 15-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSEX TS L1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSEX TS L1L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296153</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS L5L14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296161</OutageID>
<PlannedStart>2026-07-06T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUPLEX TS 44-L5D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS D6Y-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T2A3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUPLEX TS T3A5A6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296166</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-09-08T20:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T11-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296175</OutageID>
<PlannedStart>2026-07-28T10:01:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS T2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296176</OutageID>
<PlannedStart>2026-08-05T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS T1L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296182</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T1-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T3-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.BEXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.BEXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.SCXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C17L.SCXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS DL17</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS L17L32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WARDEN TS T4-C17L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296191</OutageID>
<PlannedStart>2026-08-31T04:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WARDEN TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296202</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MINDEN TS HL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS HL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS HL80</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS HL81</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS T4-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS T4Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296278</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS EK</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-L17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296307</OutageID>
<PlannedStart>2026-08-23T07:30:00</PlannedStart>
<PlannedEnd>2026-08-23T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296308</OutageID>
<PlannedStart>2026-08-30T12:30:00</PlannedStart>
<PlannedEnd>2026-09-10T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-61M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS TL18_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296309</OutageID>
<PlannedStart>2026-09-10T16:30:00</PlannedStart>
<PlannedEnd>2026-09-10T20:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296311</OutageID>
<PlannedStart>2026-09-14T07:30:00</PlannedStart>
<PlannedEnd>2026-09-14T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296312</OutageID>
<PlannedStart>2026-09-15T07:30:00</PlannedStart>
<PlannedEnd>2026-09-21T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296324</OutageID>
<PlannedStart>2026-08-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS SST15</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296339</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS HL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296340</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L5L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296342</OutageID>
<PlannedStart>2026-07-24T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS L2P1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296349</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS AL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS AL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS AL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS ASC21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS HT1A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS SC21</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS SC21AT</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DETWEILER TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296356</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L1K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296357</OutageID>
<PlannedStart>2026-07-21T12:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296358</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-22T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L2K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296359</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS L2L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296360</OutageID>
<PlannedStart>2026-07-23T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296361</OutageID>
<PlannedStart>2026-07-23T12:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296526</OutageID>
<PlannedStart>2026-08-13T07:00:00</PlannedStart>
<PlannedEnd>2026-08-14T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS T1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296658</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28R27-PA27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27</EquipmentName>
<EquipmentType>VoltageRegulator</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-L27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296668</OutageID>
<PlannedStart>2026-07-13T06:15:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-M27B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING TS 4T4-M27B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M27B.HOXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M27B.HOXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M27B.HOXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M27B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296669</OutageID>
<PlannedStart>2026-07-29T06:15:00</PlannedStart>
<PlannedEnd>2026-08-28T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-M28B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING TS 4T3-M28B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M28B.HOXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M28B.HOXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M28B.HOXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M28B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296670</OutageID>
<PlannedStart>2026-09-13T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V73R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H1L73</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT15L73</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-V73R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V73R.CLXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296672</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS 153-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296683</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31SC21L-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296798</OutageID>
<PlannedStart>2025-11-27T08:00:00</PlannedStart>
<PlannedEnd>2027-04-04T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS 36T1-A6R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS A6R-TEMPNEWT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296803</OutageID>
<PlannedStart>2025-11-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS 36T2-A5RK</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS A5RK-TEMPNEWT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296820</OutageID>
<PlannedStart>2026-07-26T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS T16</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS T16-HT16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS T16-WT16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296914</OutageID>
<PlannedStart>2026-07-14T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T5-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297059</OutageID>
<PlannedStart>2025-10-16T16:00:00</PlannedStart>
<PlannedEnd>2027-02-01T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-S7M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D2L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D2LT21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297613</OutageID>
<PlannedStart>2026-09-11T06:00:00</PlannedStart>
<PlannedEnd>2026-09-11T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS H1L91</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS H1L91-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P91G.KIXAN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P91G.KIXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P91G.REXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P91G.REXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30-P91G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T7-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS HT7D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS HT8D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T7-HT7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297859</OutageID>
<PlannedStart>2026-07-29T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS P3-P4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS T3-A4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS T3-P3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297860</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE TS DL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE TS T7-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE TS T7Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297862</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS KL41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297863</OutageID>
<PlannedStart>2026-09-16T06:30:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS LT1L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297864</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS HT5L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297887</OutageID>
<PlannedStart>2026-09-03T07:00:00</PlannedStart>
<PlannedEnd>2026-09-03T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS R3</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297888</OutageID>
<PlannedStart>2026-09-01T10:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1T3-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS H1T2-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS 10-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.DEXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.HIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.WEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297890</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>X2H: LENNOX TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297891</OutageID>
<PlannedStart>2026-08-31T11:30:00</PlannedStart>
<PlannedEnd>2026-09-10T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X22.GRXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X22.GRXNA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X22.GRXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298159</OutageID>
<PlannedStart>2026-07-13T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LOWER NOTCH JCT W71D-38</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.WIXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS 38-W71D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298219</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS WT15L551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298264</OutageID>
<PlannedStart>2026-08-10T06:15:00</PlannedStart>
<PlannedEnd>2026-08-21T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLISTON JCT 1807E9V-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS 9T4-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E9V.ALXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E9V.ALXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E9V.ALXEV</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E9V.EVXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138E9V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138T1-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-E9V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298519</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A2Q3N</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298551</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298558</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OAKVILLE TS 2 SS6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298621</OutageID>
<PlannedStart>2026-08-17T08:30:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LORNE PARK TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LORNE PARK TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LORNE PARK TS UFLS2</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298663</OutageID>
<PlannedStart>2026-07-24T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLTON TS 40T2-D9HS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298664</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS T2-L16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS T2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298666</OutageID>
<PlannedStart>2026-08-24T07:30:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS H1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS L2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEAMSVILLE TS 18Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298670</OutageID>
<PlannedStart>2026-07-20T09:30:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T5-TL34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298698</OutageID>
<PlannedStart>2026-07-21T04:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B3: BURLINGTON TS x NEWTON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298723</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B3: BURLINGTON TS x NEWTON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298746</OutageID>
<PlannedStart>2026-08-04T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS 117T6-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS M12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS M14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS M16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298755</OutageID>
<PlannedStart>2026-09-15T09:30:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HOGG1.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298757</OutageID>
<PlannedStart>2026-07-23T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D9HS: DECEW FALLS SS x GLENDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298762</OutageID>
<PlannedStart>2026-08-17T07:30:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L28L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298769</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L39WT4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298776</OutageID>
<PlannedStart>2026-09-02T07:30:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H1L39</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298778</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2-TL13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298780</OutageID>
<PlannedStart>2026-09-08T07:30:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H1L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298795</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS A1L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298810</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS K1L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L25L302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON DESN TS T15-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BEXNI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BUXBD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.MIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.NEXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298811</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MILTON SS L61L71</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298812</OutageID>
<PlannedStart>2026-07-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V79R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT14L79</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS K2L79</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-V79R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V79R.CLXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V79R.CLXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298813</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BLOOMSBURG MTS 7000T1-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9.BJXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9.BJXNO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C9.CAXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS 27-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS 27-N6M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS T3L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS 22T1-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VANESSA JCT 72C9-22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298814</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L34L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298817</OutageID>
<PlannedStart>2026-08-10T06:15:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND ROAD JCT 89Q2AH-45</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298818</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS 157T2-Q29HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298819</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS A8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS H2HT4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS H2L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298820</OutageID>
<PlannedStart>2026-08-11T08:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B40C: BURLINGTON TS x CUMBERLAND TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298821</OutageID>
<PlannedStart>2026-08-13T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B41C: BURLINGTON TS x CUMBERLAND TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298822</OutageID>
<PlannedStart>2026-08-16T06:15:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B8.BRXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B8.BRXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS 13T4-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T2-B7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T2-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298826</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B3.GLXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3.MOXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B3-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS 20T2-B3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298833</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A1L20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298835</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS K2L21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298836</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MURRAY TS L4L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298837</OutageID>
<PlannedStart>2026-09-09T08:30:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STIRTON TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STIRTON TS T4-L3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>36 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298838</OutageID>
<PlannedStart>2026-09-09T12:00:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A1L20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298839</OutageID>
<PlannedStart>2026-08-13T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D9HS: DECEW FALLS SS x GLENDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298840</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WOODBRIDGE TS D6T3-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODBRIDGE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298841</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-10T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A1L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298843</OutageID>
<PlannedStart>2026-09-10T12:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A1L36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298845</OutageID>
<PlannedStart>2026-09-11T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A1TL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298846</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D9HS: DECEW FALLS SS x GLENDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298847</OutageID>
<PlannedStart>2026-09-11T12:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A1TL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298848</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298849</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4.GLXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.MOXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B4-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS 20T1-B4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298850</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H2L40</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298851</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS 45T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298852</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298853</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L1L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298854</OutageID>
<PlannedStart>2026-09-15T12:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L1TL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298855</OutageID>
<PlannedStart>2026-09-15T12:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2L35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298856</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L9TL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298857</OutageID>
<PlannedStart>2026-09-16T12:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L9WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298858</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298859</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS L3WT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298860</OutageID>
<PlannedStart>2026-09-17T12:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS A2TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298861</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298862</OutageID>
<PlannedStart>2026-09-18T12:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298875</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>Q11S: BECK 1 SS x GLENDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298876</OutageID>
<PlannedStart>2026-08-26T08:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>Q11S: BECK 1 SS x GLENDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298879</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>Q11S: BECK 1 SS x GLENDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298947</OutageID>
<PlannedStart>2026-09-16T07:00:00</PlannedStart>
<PlannedEnd>2026-09-16T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K2M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298953</OutageID>
<PlannedStart>2026-08-12T05:45:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS SC22P2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS SC22SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299050</OutageID>
<PlannedStart>2026-08-20T08:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T22C: CHATS FALLS TS x CLARINGTON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299136</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NEPEAN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEPEAN TS T3-M32S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299150</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX JCT 319E34M-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299153</OutageID>
<PlannedStart>2026-01-26T08:00:00</PlannedStart>
<PlannedEnd>2026-12-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H24S.GRXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H24S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299157</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS KL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299159</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS DH</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299163</OutageID>
<PlannedStart>2026-08-26T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS PL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299164</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS KL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299165</OutageID>
<PlannedStart>2026-08-11T17:00:00</PlannedStart>
<PlannedEnd>2026-08-19T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS SC21T12-T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12-SS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299176</OutageID>
<PlannedStart>2026-09-07T03:30:00</PlannedStart>
<PlannedEnd>2026-09-10T18:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLMAN JCT L1C7BM-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FITZROY JCT 53C7BM-436</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299177</OutageID>
<PlannedStart>2026-08-16T07:00:00</PlannedStart>
<PlannedEnd>2026-08-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHAPLEAU DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299189</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORTH BAY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORTH BAY TS T2-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299190</OutageID>
<PlannedStart>2026-01-05T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L5A.NOXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L5H.HOXNO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299195</OutageID>
<PlannedStart>2026-09-14T10:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D3D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS D4D11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KIRKLAND LAKE TS T1-D11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299210</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS HL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299211</OutageID>
<PlannedStart>2026-08-06T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A8L.LAXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS HL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS L8L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS KL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS KL8_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L2L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299213</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SVC1Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299214</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L3L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299217</OutageID>
<PlannedStart>2026-08-20T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS KL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299218</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A7L.M1XAS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A7L.M1XLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS HL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS L2L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS AL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS AL7_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L3L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299221</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS KL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299222</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS L2L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299223</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299243</OutageID>
<PlannedStart>2026-09-14T13:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESPANOLA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPANOLA TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299245</OutageID>
<PlannedStart>2026-07-24T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-F25A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS AK1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS EH</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS EL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS E_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299246</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS AK2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299250</OutageID>
<PlannedStart>2026-07-24T10:00:00</PlannedStart>
<PlannedEnd>2026-07-24T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS AK1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299499</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TILLSONBURG TS M10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TILLSONBURG TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TILLSONBURG TS VC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299780</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>H9A.GAXCU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.HAXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.O2XBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.O2XOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299993</OutageID>
<PlannedStart>2026-07-28T07:00:00</PlannedStart>
<PlannedEnd>2026-07-28T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N21W: SCOTT TS x BUCHANAN TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300000</OutageID>
<PlannedStart>2026-07-30T07:00:00</PlannedStart>
<PlannedEnd>2026-07-30T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N22W: SCOTT TS x BUCHANAN TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300159</OutageID>
<PlannedStart>2026-08-31T07:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS 240T1-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T5-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS 162-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS L21L30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.CHXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.ERXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.ERXER</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.ERXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HAXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HAXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HUXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HUXJM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.TOXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.TOXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T4-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300277</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSA TS L03L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300288</OutageID>
<PlannedStart>2026-09-11T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALMONTE TS 20T4-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALMONTE TS L33L34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALMONTE TS L33L34-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALMONTE TS SC4Q-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALMONTE TS SS4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E34M.DJXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E34M.TJXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300303</OutageID>
<PlannedStart>2026-08-31T07:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS YSC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300324</OutageID>
<PlannedStart>2026-07-06T11:30:00</PlannedStart>
<PlannedEnd>2026-07-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEEWATIN JCT 299SK1-90</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300357</OutageID>
<PlannedStart>2026-07-27T19:00:00</PlannedStart>
<PlannedEnd>2026-07-27T20:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLEARWATER BAY DS 40T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORGIE JCT FORGIE-2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-SK1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.CLXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.FOXIP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.KJXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SK1.KJXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300359</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS 22-K24F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K24F.KEXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K24F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300360</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A8L: ALEXANDER SS x LAKEHEAD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300361</OutageID>
<PlannedStart>2026-08-13T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A8L: ALEXANDER SS x LAKEHEAD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300363</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A7L: ALEXANDER SS x LAKEHEAD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300364</OutageID>
<PlannedStart>2026-08-11T08:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A7L: ALEXANDER SS x LAKEHEAD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300365</OutageID>
<PlannedStart>2026-08-11T08:00:00</PlannedStart>
<PlannedEnd>2026-08-12T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 678</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 679</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 680</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 682</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS L24_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300366</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300367</OutageID>
<PlannedStart>2026-08-17T11:00:00</PlannedStart>
<PlannedEnd>2026-08-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300368</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300370</OutageID>
<PlannedStart>2026-08-18T09:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300371</OutageID>
<PlannedStart>2026-08-18T10:00:00</PlannedStart>
<PlannedEnd>2026-08-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 635</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300372</OutageID>
<PlannedStart>2026-08-19T09:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300373</OutageID>
<PlannedStart>2026-08-19T09:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300374</OutageID>
<PlannedStart>2026-08-20T09:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300375</OutageID>
<PlannedStart>2026-08-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON DS 2735T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-T1M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1M.PIXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1M.PIXMD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRACE BAY SS 77T1M</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300376</OutageID>
<PlannedStart>2026-08-22T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MATTAWA JCT 583L5A-387</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORTH BAY TS 15L5A-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300378</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS L24L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300379</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS 26-S2B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS HL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS L2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300381</OutageID>
<PlannedStart>2026-08-18T07:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DRYDEN TS 25-M2D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DRYDEN TS M2D-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300382</OutageID>
<PlannedStart>2026-08-24T12:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K7K.RAXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K7K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K7K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300383</OutageID>
<PlannedStart>2026-08-24T10:00:00</PlannedStart>
<PlannedEnd>2026-08-27T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TERRACE BAY SS 77T1M</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300385</OutageID>
<PlannedStart>2026-08-31T10:00:00</PlannedStart>
<PlannedEnd>2026-09-02T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS AL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300386</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D4Z.DYXNI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS L2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS L3L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS L4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300387</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARTSHO1.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHO1.2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHO1.3</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1406</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1407</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1408</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1409</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1410</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS LG1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS SSB</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 615</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 618</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 696</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300388</OutageID>
<PlannedStart>2026-09-02T09:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L24-SS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L24_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS L71L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300389</OutageID>
<PlannedStart>2026-09-02T09:00:00</PlannedStart>
<PlannedEnd>2026-09-03T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D4Z: DYMOND TS x RAPIDE DES ISLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300390</OutageID>
<PlannedStart>2026-09-03T12:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D4Z: DYMOND TS x RAPIDE DES ISLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300425</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D7F: DETWEILER TS x FREEPORT SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300889</OutageID>
<PlannedStart>2025-11-30T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-L22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300917</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS BSC1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS T1-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PEMBROKE TS T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300918</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D3H.HUXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.HUXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.ISXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.P2XH2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.PIXP2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.TWXIS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L3L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L3L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-D3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS L3L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS L3L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS L3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300948</OutageID>
<PlannedStart>2025-11-19T17:00:00</PlannedStart>
<PlannedEnd>2035-12-31T18:01:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA301: BECK 2 TS x NY NIAGARA 345 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300950</OutageID>
<PlannedStart>2025-11-19T17:00:00</PlannedStart>
<PlannedEnd>2035-12-31T18:01:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA302: BECK 2 TS x NY NIAGARA 345 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300960</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS 240T2-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T6-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS L19L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS L19L29-L19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.CHXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.ERXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.ERXER</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.ERXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.HAXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.TOXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R19TH.TOXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T3-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HL38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HT14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301559</OutageID>
<PlannedStart>2026-08-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301603</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS AL20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301605</OutageID>
<PlannedStart>2026-08-18T12:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1-K20</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS AL20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301695</OutageID>
<PlannedStart>2025-11-30T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 115_TMP7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 230_TMP7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301698</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X2H: LENNOX TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301875</OutageID>
<PlannedStart>2026-01-27T09:00:00</PlannedStart>
<PlannedEnd>2026-11-23T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302154</OutageID>
<PlannedStart>2026-09-16T09:00:00</PlannedStart>
<PlannedEnd>2026-09-17T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS KL9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302155</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MAGPIE TS 1212</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302156</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K2M.NOXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KEEWATIN JCT 299SK1-15</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K2M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-SK1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302158</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-T6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302159</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 844</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-GL1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302164</OutageID>
<PlannedStart>2026-09-14T09:00:00</PlannedStart>
<PlannedEnd>2026-09-15T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER SS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302169</OutageID>
<PlannedStart>2026-09-11T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302174</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 2P7B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302176</OutageID>
<PlannedStart>2026-09-08T10:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A9K.ANXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A9K.MOXRA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS 3015-A9K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS L4L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS L9LT2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS L9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MONTEITH DS JCT 3351A9K-3015</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MONTEITH DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RAMORE TS 120A9K-3351</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302177</OutageID>
<PlannedStart>2026-09-08T09:00:00</PlannedStart>
<PlannedEnd>2026-09-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS AL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS AL15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS AL5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS AL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS L15-R11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS SC11R11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BIRCH TS T3B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS T6-Q5B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P7B.BIXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 2P7B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302179</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1414</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1415</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1416</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1417</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1418</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS LG2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS SSA</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 632</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 635</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 697</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302182</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302183</OutageID>
<PlannedStart>2026-08-20T08:00:00</PlannedStart>
<PlannedEnd>2026-08-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARATHON TS AL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS AL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS AL36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS AL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS HL24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS HL35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS HL38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS SC21T12-T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T11-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS T12-SS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302305</OutageID>
<PlannedStart>2026-06-14T12:00:00</PlannedStart>
<PlannedEnd>2026-07-24T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS T2-X3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS 10-X3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSTON SOLAR JCT 371X3H-BO2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302306</OutageID>
<PlannedStart>2026-07-24T12:00:00</PlannedStart>
<PlannedEnd>2026-07-24T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS T2-X3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS 10-X3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X3H.CAXHI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X3H.KJXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X3H.KJXKS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X3H.LEXKJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302313</OutageID>
<PlannedStart>2025-12-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T17:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS YZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302693</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITBY TS 40T3-T23C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303490</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BROCKVILLE TS L2M-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L1MB.LUXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L1MB.LUXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L1MB.MOXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MORRISBURG JCT 68L1MB-4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MORRISBURG TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MORRISBURG TS T3-L1MB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MORRISBURG TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L1MB</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS PL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS T2L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303707</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T2-K12W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303784</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M2W.MAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303809</OutageID>
<PlannedStart>2026-09-11T07:00:00</PlannedStart>
<PlannedEnd>2026-09-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303917</OutageID>
<PlannedStart>2026-08-14T07:00:00</PlannedStart>
<PlannedEnd>2026-08-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FINCH TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303925</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>T1M.PIXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303926</OutageID>
<PlannedStart>2026-07-21T07:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICKERING A SS L7H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303931</OutageID>
<PlannedStart>2026-07-21T11:30:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303932</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304036</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-10-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARGACH DS 24T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARGACH DS K6FT1-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K6F</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304453</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-27T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS L3L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304454</OutageID>
<PlannedStart>2026-07-28T06:30:00</PlannedStart>
<PlannedEnd>2026-07-29T10:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CATARAQUI TS T2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304973</OutageID>
<PlannedStart>2026-03-17T15:30:00</PlannedStart>
<PlannedEnd>2026-11-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS OLD28T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS OLDT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305017</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>VINELAND DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VINELAND DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305041</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>VINELAND DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VINELAND DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305155</OutageID>
<PlannedStart>2026-09-18T07:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T6-L581</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305350</OutageID>
<PlannedStart>2026-01-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T17:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS 6E-7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A1-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSNORTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSSOUTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS AQ11S-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E3-E13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E3-E4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E4-E14</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E4-E5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E5-E15</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E5-E6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E5_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E6-E16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E7-E8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E7_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E8-E18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E8-E9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E8_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E9-E19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305777</OutageID>
<PlannedStart>2026-01-20T03:00:00</PlannedStart>
<PlannedEnd>2026-10-30T23:59:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NAPANEE GENERATING STATION 8433-N535N (D2T3-T3)</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305822</OutageID>
<PlannedStart>2026-06-01T17:45:00</PlannedStart>
<PlannedEnd>2026-09-21T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8-HT8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS TEMPH2-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>46 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305825</OutageID>
<PlannedStart>2026-06-10T19:00:00</PlannedStart>
<PlannedEnd>2026-08-27T17:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS 6-H4Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS DT3L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS DT4L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS H4Z-L5H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T3-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305846</OutageID>
<PlannedStart>2026-08-24T07:30:00</PlannedStart>
<PlannedEnd>2026-08-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21-HL16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Y1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305847</OutageID>
<PlannedStart>2026-08-31T07:30:00</PlannedStart>
<PlannedEnd>2026-09-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19-HL2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19B1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305848</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20-HL3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20A1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T20Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305876</OutageID>
<PlannedStart>2026-08-06T07:00:00</PlannedStart>
<PlannedEnd>2026-08-06T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305877</OutageID>
<PlannedStart>2026-08-06T11:30:00</PlannedStart>
<PlannedEnd>2026-08-06T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305946</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306139</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A4H.ANXFO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A4H.FOXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS 3015-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FOURNIER JCT 78-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FOURNIER JCT 78-A5H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306836</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HALTON TS M29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HALTON TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HALTON TS SC2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HALTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306861</OutageID>
<PlannedStart>2026-09-11T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORFOLK TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS VC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306898</OutageID>
<PlannedStart>2026-07-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306917</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TREMAINE TS 280T1-T38B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TREMAINE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307109</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-08T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307114</OutageID>
<PlannedStart>2026-09-08T12:00:00</PlannedStart>
<PlannedEnd>2026-09-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307250</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCOTT TS L5L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307268</OutageID>
<PlannedStart>2026-07-29T07:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKESHORE SPS (SPS238)</EquipmentName>
<EquipmentType>SpecialProtectionSystem</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307272</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS HL5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307274</OutageID>
<PlannedStart>2026-08-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307293</OutageID>
<PlannedStart>2026-06-08T09:30:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T7-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>135 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307491</OutageID>
<PlannedStart>2026-07-06T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEAVERTON TS T3-M80B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BROWN HILL TS L80L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINDSAY TS 4T2-M80B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M80B.BEXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M80B.BEXBV</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M80B.BSXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M80B.BVXLI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M80B.BVXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-M80B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307579</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS 31T14-L14W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS HLA2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T14</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307640</OutageID>
<PlannedStart>2026-06-22T06:15:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BORALEX TILBURY JCT 647K2Z-54</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K2Z.KEXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K2Z.TIXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENT TS 5-K2Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENT TS L2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307885</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORFOLK TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS VC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307924</OutageID>
<PlannedStart>2026-07-19T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X521B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS PL521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS R1W1-W1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS X4L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308080</OutageID>
<PlannedStart>2026-03-27T16:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS M9-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308088</OutageID>
<PlannedStart>2026-02-11T12:30:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B562E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B569B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T28-HT28</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308093</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T10:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS F_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308094</OutageID>
<PlannedStart>2026-08-31T07:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHURCHILL MEADOWS TS 240T1-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T5-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS 162-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HURONTARIO SS L21L30</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.CHXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.ERXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.ERXER</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.ERXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HAXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HAXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HUXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.HUXJM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.TOXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21TH.TOXTO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TOMKEN TS T4-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R21TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS L21L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308103</OutageID>
<PlannedStart>2026-08-31T07:15:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-E510V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E510V.CLXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-E510V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308109</OutageID>
<PlannedStart>2026-09-08T07:30:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CUMBERLAND TS 76T4-B40C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CUMBERLAND TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308118</OutageID>
<PlannedStart>2026-08-14T07:30:00</PlannedStart>
<PlannedEnd>2026-08-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS SC21</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS SC21A1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308124</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M28B.HOXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M28B.HOXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308125</OutageID>
<PlannedStart>2026-08-18T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>B7.BRXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B7.BRXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308128</OutageID>
<PlannedStart>2026-06-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V586M.MDXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308131</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-H35D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS DOFL35-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS DOFL35-24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS L35_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308136</OutageID>
<PlannedStart>2026-07-30T10:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS H2L74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT13L74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS F_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1L74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS L4L74</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.WEXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.WEXRE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308137</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308139</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS DL582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308142</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N37S: NANTICOKE TS x SUMMERHAVEN SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308143</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS P1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308144</OutageID>
<PlannedStart>2026-08-26T08:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T36B: TRAFALGAR TS x BURLINGTON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308146</OutageID>
<PlannedStart>2026-09-04T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS H1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308149</OutageID>
<PlannedStart>2026-08-19T12:30:00</PlannedStart>
<PlannedEnd>2026-08-19T16:31:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS T2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308152</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308162</OutageID>
<PlannedStart>2026-06-15T08:00:00</PlannedStart>
<PlannedEnd>2026-12-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SS3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308163</OutageID>
<PlannedStart>2026-07-21T08:30:00</PlannedStart>
<PlannedEnd>2026-07-21T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARDIFF TS BQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308169</OutageID>
<PlannedStart>2026-07-07T07:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS L552L586</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS PL586</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V586M.MDXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308188</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-N6M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308190</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S39M: SUMMERHAVEN SS x MIDDLEPORT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308193</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308194</OutageID>
<PlannedStart>2026-07-13T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S39M: SUMMERHAVEN SS x MIDDLEPORT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308196</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS WT4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308198</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>Q23BM: BECK 2 TS x MIDDLEPORT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308201</OutageID>
<PlannedStart>2026-07-27T06:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M27B.HOXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M27B.HOXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308202</OutageID>
<PlannedStart>2026-08-28T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308204</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N37S: NANTICOKE TS x SUMMERHAVEN SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308205</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>Q25BM: BECK 2 TS x MIDDLEPORT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308211</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308213</OutageID>
<PlannedStart>2026-08-07T08:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308215</OutageID>
<PlannedStart>2026-08-06T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS P1P2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308224</OutageID>
<PlannedStart>2026-08-28T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS EZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS E_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308229</OutageID>
<PlannedStart>2026-07-17T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T17:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS T5-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXRD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.WEXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.WEXRE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308236</OutageID>
<PlannedStart>2026-08-11T08:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS P2L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308238</OutageID>
<PlannedStart>2026-08-21T08:30:00</PlannedStart>
<PlannedEnd>2026-08-21T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS EZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308241</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS P1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308242</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS P1L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308243</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS L28L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308245</OutageID>
<PlannedStart>2026-08-20T08:30:00</PlannedStart>
<PlannedEnd>2026-08-20T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COOKSVILLE TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308248</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS P2L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308309</OutageID>
<PlannedStart>2026-06-01T09:30:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS F_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>16 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308330</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-11-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28R27-PA27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PA27.NIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308459</OutageID>
<PlannedStart>2026-08-22T07:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FINCH TS 55T3-P21R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IBM MARKHAM CTS T1-P21R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LESLIE TS 51T1-P21R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LESLIE TS 51T4-P21R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LESLIE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LESLIE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P21R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P21R.IBXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P21R.LEXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P21R.PKXM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-P21R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-P21R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308678</OutageID>
<PlannedStart>2026-07-03T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MAIN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAIN TS T3P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAIN TS T3P-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308682</OutageID>
<PlannedStart>2026-02-18T11:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308747</OutageID>
<PlannedStart>2026-08-09T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K11W.MAXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K11W.RUXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS 38-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T1-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T6-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T6Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K11W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K12W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L13W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L14W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L18W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308831</OutageID>
<PlannedStart>2026-04-15T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 668</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS PL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308864</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N582L: NANTICOKE TS x LONGWOOD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308996</OutageID>
<PlannedStart>2026-08-25T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SLATER TS SC1B1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SLATER TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SLATER TS T1-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309134</OutageID>
<PlannedStart>2026-03-12T16:30:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BFN JCT 653W4H-9989</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309191</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORFOLK TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS VC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309213</OutageID>
<PlannedStart>2026-08-07T07:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS H3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309214</OutageID>
<PlannedStart>2026-07-16T07:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS D1L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS D1L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS D1TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T7-D1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309233</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS AL15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309234</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS AL27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309235</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T4-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309249</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309251</OutageID>
<PlannedStart>2026-09-04T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309262</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS HT8L582</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309535</OutageID>
<PlannedStart>2026-09-13T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON DESN TS T15</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON DESN TS T15-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309648</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-15T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HILTON JCT A3P4S2002-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309920</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R13K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2L18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2L20</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2L72</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2L76</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS SC21H-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS T7-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309929</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESSA TS JL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310160</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-H6T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L5L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L6_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310268</OutageID>
<PlannedStart>2026-03-12T11:30:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310299</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T17:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS T5-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-V74R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXRD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.RIXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.WEXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>V74R.WEXRE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310302</OutageID>
<PlannedStart>2026-07-31T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS L21L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310303</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310304</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS T15L17</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310307</OutageID>
<PlannedStart>2026-09-17T08:30:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARDIFF TS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310308</OutageID>
<PlannedStart>2026-09-16T08:30:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARDIFF TS Q_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310513</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ISLAND FALLS CGS IS G4</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310518</OutageID>
<PlannedStart>2026-07-24T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CEDAR TS SC8</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CEDAR TS SS8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310597</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS SC2.4B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310608</OutageID>
<PlannedStart>2026-08-11T07:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARKE TS BR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARKE TS SC2B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARKE TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310794</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T36B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T36B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310795</OutageID>
<PlannedStart>2026-08-14T06:15:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-M34H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS A2TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS D1TL34</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T3-TL34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T5-TL34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS TL34_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M34H.MIXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M34H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310796</OutageID>
<PlannedStart>2026-08-04T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-M28B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS K1L28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L28L40</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L28_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310799</OutageID>
<PlannedStart>2026-09-08T06:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-Q24HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q24HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON DESN TS T15-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS 157T1-Q24HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAMILTON NEBO TS T3-Q24HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q24HM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q25BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q24HM.HAXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q24HM.HAXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q24HM.HAXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q24HM.HNXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q24HM.HNXHN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q24HM.HNXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BEXNI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BUXBD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.BUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.MIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q25BM.NEXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310801</OutageID>
<PlannedStart>2026-07-25T08:00:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-D3A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D1L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D3A-L3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS H1L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS L3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12L3-3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310802</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS N27T2-N5M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CALEDONIA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310814</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-S39M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L27L39</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L30L39</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L39_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310820</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-12T12:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JARVIS TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310826</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-S39M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L27L39</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L30L39</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS L39_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310846</OutageID>
<PlannedStart>2026-05-23T09:00:00</PlannedStart>
<PlannedEnd>2026-10-17T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS JBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310852</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>W71D.LOXDY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.WIXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310861</OutageID>
<PlannedStart>2026-05-29T13:00:00</PlannedStart>
<PlannedEnd>2026-08-18T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310879</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311084</OutageID>
<PlannedStart>2026-09-15T06:30:00</PlannedStart>
<PlannedEnd>2026-09-15T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311085</OutageID>
<PlannedStart>2026-09-15T17:00:00</PlannedStart>
<PlannedEnd>2026-09-15T18:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-A4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS L4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>RISK</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311160</OutageID>
<PlannedStart>2026-09-08T06:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M33W.NEXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311446</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T08:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>P4S.DOXDA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P4S.HIXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P4S.PHXDA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311447</OutageID>
<PlannedStart>2026-08-15T10:45:00</PlannedStart>
<PlannedEnd>2026-08-15T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>P4S.DOXDA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P4S.HIXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P4S.PHXDA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311452</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGUEUIL TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. ISIDORE TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. ISIDORE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311559</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS M24-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS M26-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS SS4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311584</OutageID>
<PlannedStart>2026-08-06T07:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FINCH TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311588</OutageID>
<PlannedStart>2026-08-17T12:00:00</PlannedStart>
<PlannedEnd>2026-08-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS M23-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS M25-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311863</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-08T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.GJXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.GJXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M23L.LAXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARATHON TS 15-M23L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311865</OutageID>
<PlannedStart>2026-09-15T00:00:00</PlannedStart>
<PlannedEnd>2026-12-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311874</OutageID>
<PlannedStart>2026-09-05T08:00:00</PlannedStart>
<PlannedEnd>2026-09-05T09:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS AL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS L26L40</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS R56-X526B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X526B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X526B.LEXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311875</OutageID>
<PlannedStart>2026-09-05T15:00:00</PlannedStart>
<PlannedEnd>2026-09-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS AL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS L26L40</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS R56-X526B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X526B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X526B.LEXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311909</OutageID>
<PlannedStart>2026-07-20T06:30:00</PlannedStart>
<PlannedEnd>2026-07-31T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLAW TS 87-H1L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS H1-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS H1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>9 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312124</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>T33E.ALXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312161</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-28T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 166</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLERGUE1.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 205</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 208</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312190</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS PL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312191</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS W1L38</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312227</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SPRUCE FALLS TS T7</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SPRUCE FALLS TS T7-K38S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SPRUCE FALLS TS T7L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312228</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS JL503</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312232</OutageID>
<PlannedStart>2026-07-25T07:00:00</PlannedStart>
<PlannedEnd>2026-07-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A6R.BLXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.HAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.OHXOH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.OHXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.RIXOH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.RUXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS L6L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS YL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS A1A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS A1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312233</OutageID>
<PlannedStart>2026-08-01T07:00:00</PlannedStart>
<PlannedEnd>2026-08-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A6R.BLXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.HAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.OHXOH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.OHXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.RIXOH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A6R.RUXRI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS L6L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS YL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS A1A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS A1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312237</OutageID>
<PlannedStart>2026-07-06T06:15:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D1M.MIXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS 5-D1M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-D1M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312238</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-09-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312240</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A4-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312251</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A6R: HAWTHORNE TS x RIVERDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312252</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A6R: HAWTHORNE TS x RIVERDALE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312300</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T5-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS 1SS2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312304</OutageID>
<PlannedStart>2026-07-22T09:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SS1-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312307</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAIRCHILD TS SS4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312339</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312341</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T08:15:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COPELAND SS 329-D11J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1-T1CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2-T2T5CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D11J.CPXLS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D11J.LSXJO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS 37-D11J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS 37K13J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K3K4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K4K5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T6-K4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312342</OutageID>
<PlannedStart>2026-08-06T15:45:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COPELAND SS 329-D11J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1-T1CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1L11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2-T2T5CA</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COPELAND SS K2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D11J.CPXLS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D11J.LSXJO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS 37-D11J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS 37K13J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K3K4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K4K5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS K4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T6-K4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312393</OutageID>
<PlannedStart>2026-08-05T04:00:00</PlannedStart>
<PlannedEnd>2026-12-11T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>28 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312403</OutageID>
<PlannedStart>2026-04-27T07:00:00</PlannedStart>
<PlannedEnd>2027-12-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T1-D1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312423</OutageID>
<PlannedStart>2026-08-06T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LESLIE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312425</OutageID>
<PlannedStart>2026-08-08T06:00:00</PlannedStart>
<PlannedEnd>2026-08-09T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2-T4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS L4C-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T1-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L4C.LEXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-L4C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS L4L18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS PL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312430</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>E34M.TFXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312433</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C3S.CFXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312435</OutageID>
<PlannedStart>2026-08-10T07:15:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS T6-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS 1SS2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312453</OutageID>
<PlannedStart>2026-08-13T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T19A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312464</OutageID>
<PlannedStart>2026-08-07T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312510</OutageID>
<PlannedStart>2026-08-25T07:30:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANBY WEST TS H1H4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312516</OutageID>
<PlannedStart>2026-08-11T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>MAIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312518</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>MAIN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312525</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS QZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312526</OutageID>
<PlannedStart>2026-08-26T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T17:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SCARBORO TS T24</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCARBORO TS T24-C3L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312528</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW DESN TS QZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312530</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N7S.SAXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N7S.SAXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS 40-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS L7L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS L7L41</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312548</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N7S.SAXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N7S.SAXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS 40-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312626</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FINCH TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312631</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LINDSAY TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINDSAY TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINDSAY TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312660</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-T26C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T26C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS HT2L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS 142-T26C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA THORNTON TS 52T3-T26C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.AJXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.AJXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.BJXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.CJXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.CJXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.CLXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.LJXAJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.LJXTJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.OJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.OJXOG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.TJXOJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.TJXTH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.WJXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.WJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.WJXWH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T26C.WJXWT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY JCT 8117T26C-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS 40T2-T26C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312746</OutageID>
<PlannedStart>2026-05-28T18:00:00</PlannedStart>
<PlannedEnd>2026-07-27T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS EL502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS HT28L562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS HT28_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS HT3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS L560L569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B562E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B569B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDA_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDEL569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDE_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDL560_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDL562_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDL569_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3T28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312836</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1L302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L25L302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L302_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS WT302-L302</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312877</OutageID>
<PlannedStart>2026-04-20T15:00:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312892</OutageID>
<PlannedStart>2026-07-31T17:30:00</PlannedStart>
<PlannedEnd>2026-07-31T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2508</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2522</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312938</OutageID>
<PlannedStart>2026-09-14T06:15:00</PlannedStart>
<PlannedEnd>2026-10-02T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MEAFORD TS A1-OS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS C2-S2S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2S.MEXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313014</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313036</OutageID>
<PlannedStart>2026-07-12T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>F25A: FORT FRANCES TS x MACKENZIE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313038</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A22L: MACKENZIE TS x LAKEHEAD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313040</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313041</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS P_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313043</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-09-01T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313044</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS 33-X74P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS 34-X74P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X74P.MIXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313045</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313047</OutageID>
<PlannedStart>2026-08-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A21L: MACKENZIE TS x LAKEHEAD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313049</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-08-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>EAR FALLS TS 1-M3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M3E.EAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313051</OutageID>
<PlannedStart>2026-08-24T09:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS R1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS R1W1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313052</OutageID>
<PlannedStart>2026-08-24T09:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS R1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313055</OutageID>
<PlannedStart>2026-08-24T12:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K7K.RAXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K7K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RABBIT LAKE SS 15-K7K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313056</OutageID>
<PlannedStart>2026-08-25T17:00:00</PlannedStart>
<PlannedEnd>2026-08-31T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M1-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M3-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS2-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T4Q-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313058</OutageID>
<PlannedStart>2026-08-26T09:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SC21</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SC21W2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313060</OutageID>
<PlannedStart>2026-08-31T09:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SC11A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313061</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313062</OutageID>
<PlannedStart>2026-09-10T00:00:00</PlannedStart>
<PlannedEnd>2026-09-10T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALGOMA TS AL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALGOMA TS L1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORTH SHORE DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SOWERBY DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRIKER DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRIKER DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T1B.ALXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHARNCLIFFE DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313063</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M1-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23M3-J</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23T3-B3E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS 23T4-B4E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T4Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313096</OutageID>
<PlannedStart>2026-07-28T15:00:00</PlannedStart>
<PlannedEnd>2026-07-30T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 166</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313097</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS DT4L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS SS4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313098</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 671</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 672</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 676</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS GT4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313099</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 618</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 638</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 660</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 668</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS 671</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS N1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS N2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313100</OutageID>
<PlannedStart>2026-08-23T08:00:00</PlannedStart>
<PlannedEnd>2026-08-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARMICHAEL FALLS JCT 3021-27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FAUQUIER DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K STR 127A JCT 361H9K-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.CAXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.CAXOB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.FAXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.H9XMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.H9XSM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.HUXH9</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.HUXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.HUXSM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.MAXFA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.OBXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9K.SMXSM</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-H9K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L1L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L1L9-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SMOOTH ROCK FALLS DS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SMOOTH ROCK FALLS DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313102</OutageID>
<PlannedStart>2026-08-23T21:00:00</PlannedStart>
<PlannedEnd>2026-08-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARMICHAEL FALLS JCT 3021-27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KAPUSKASING TS L1L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313104</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D3H.HUXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.HUXHU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.ISXGR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.P2XH2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.PIXP2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D3H.TWXIS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HUNTA SS 50-D3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-D3H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313105</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S22A: MARTINDALE TS x ALGOMA TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313106</OutageID>
<PlannedStart>2026-09-11T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TROUT LAKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313107</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS R6</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-T6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS T6-W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313109</OutageID>
<PlannedStart>2026-09-16T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PINARD TS 31T1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS T1-D501P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PINARD TS TSS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313118</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-10-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>20 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313119</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313120</OutageID>
<PlannedStart>2026-08-25T23:30:00</PlannedStart>
<PlannedEnd>2026-08-26T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T2-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313121</OutageID>
<PlannedStart>2026-08-26T23:30:00</PlannedStart>
<PlannedEnd>2026-08-27T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T2-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313122</OutageID>
<PlannedStart>2026-08-27T23:30:00</PlannedStart>
<PlannedEnd>2026-08-28T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T2-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313123</OutageID>
<PlannedStart>2026-09-01T23:30:00</PlannedStart>
<PlannedEnd>2026-09-02T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALBION TS 84T1-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313124</OutageID>
<PlannedStart>2026-08-31T07:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS 71-F10MV</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS A1-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS T1-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313126</OutageID>
<PlannedStart>2026-09-08T06:00:00</PlannedStart>
<PlannedEnd>2026-09-17T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS23-T23R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS24-T24R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24-HT24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313128</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS 71-C7BM</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS A1-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LINCOLN HEIGHTS TS T2-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313151</OutageID>
<PlannedStart>2026-08-15T16:00:00</PlannedStart>
<PlannedEnd>2026-08-16T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313161</OutageID>
<PlannedStart>2026-08-14T12:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL93</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313193</OutageID>
<PlannedStart>2026-08-15T07:00:00</PlannedStart>
<PlannedEnd>2026-08-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 844</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1304</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1306</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-GL1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS AL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS AL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS AL36</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1SC1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313195</OutageID>
<PlannedStart>2026-08-16T17:00:00</PlannedStart>
<PlannedEnd>2026-08-17T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313196</OutageID>
<PlannedStart>2026-08-17T06:00:00</PlannedStart>
<PlannedEnd>2026-08-17T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 834</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS 997</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-GL4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-W4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313197</OutageID>
<PlannedStart>2026-08-17T18:00:00</PlannedStart>
<PlannedEnd>2026-08-17T20:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 834</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS 997</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS 999</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-GL4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-W4H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313198</OutageID>
<PlannedStart>2026-08-17T20:00:00</PlannedStart>
<PlannedEnd>2026-08-21T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313201</OutageID>
<PlannedStart>2026-08-21T07:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 834</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS 996</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS 997</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS 999</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLINGSWORTH TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-GL4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HL35</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313211</OutageID>
<PlannedStart>2026-08-10T12:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS A-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS AL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS AL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1-L71</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T2-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T2-L71</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LOWER NOTCH JCT W71D-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.LOXDY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313264</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DYMOND TS T1-L71</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DYMOND TS T2-L71</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LOWER NOTCH JCT W71D-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W71D.LOXDY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313265</OutageID>
<PlannedStart>2026-08-04T10:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PINARD TS 31-R21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21D.PIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21D.PIXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R21D.PIXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313269</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23R</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC23SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313320</OutageID>
<PlannedStart>2026-08-16T15:00:00</PlannedStart>
<PlannedEnd>2026-08-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHAPLEAU DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLD14-W2C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313321</OutageID>
<PlannedStart>2026-08-16T06:00:00</PlannedStart>
<PlannedEnd>2026-08-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHAPLEAU DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLD14-W2C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313322</OutageID>
<PlannedStart>2026-08-16T06:00:00</PlannedStart>
<PlannedEnd>2026-08-16T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHAPLEAU DS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLD14-W2C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313328</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28R27-PA27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS L27_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27</EquipmentName>
<EquipmentType>VoltageRegulator</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-L27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS TL26L27</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PA27.NIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313368</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MORRISBURG TS T3J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313374</OutageID>
<PlannedStart>2026-08-09T17:00:00</PlannedStart>
<PlannedEnd>2026-12-05T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2-T4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2BUS-TEMP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313375</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MORRISBURG TS T4Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313396</OutageID>
<PlannedStart>2026-05-01T12:00:00</PlannedStart>
<PlannedEnd>2026-10-31T21:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS ENERCORP_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS LINDE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS ASHGROVE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS NORAMPTRENT_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS SANOFI_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS STEM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS UOFT_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COTE GOLD CTS LOAD-LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS 1X7DRA_SW</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS 1Y7DRA_SW</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO KENILWORTH CTS 7Y6DRA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO KENILWORTH CTS 8X6DRA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS GCPOWER_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FLAKEBOARD TS TT_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS PLACERDOMECA_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JBL CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS ENPOWINC_DRASW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX GS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MCMASTER CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS HCE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS HHSC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS OPG_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS STELCO_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS STEM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS UOG_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PANABRASIVES CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS T6_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS ESSROC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RAINY RIVER GOLD CTS LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WEYERHAEUSER DRYDEN CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313424</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS T1-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS T1D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313443</OutageID>
<PlannedStart>2026-09-04T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANT TS 12-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS DTL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2-TL13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS TL13_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313446</OutageID>
<PlannedStart>2026-08-19T17:00:00</PlannedStart>
<PlannedEnd>2026-08-20T17:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313459</OutageID>
<PlannedStart>2026-08-21T17:00:00</PlannedStart>
<PlannedEnd>2026-08-22T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313515</OutageID>
<PlannedStart>2026-05-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-16T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-MSO6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-MSO7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313523</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.GJXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PAXTR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T37B.PJXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31SC21L-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313529</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T6-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313593</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T16:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T2-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313600</OutageID>
<PlannedStart>2026-09-09T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313624</OutageID>
<PlannedStart>2026-09-01T06:30:00</PlannedStart>
<PlannedEnd>2026-09-09T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PALERMO TS SS4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313666</OutageID>
<PlannedStart>2026-09-10T09:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313682</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V: DETWEILER TS x ORANGEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313684</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V: DETWEILER TS x ORANGEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313691</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FERGUS TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS T3-D6V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS UFLS2</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313707</OutageID>
<PlannedStart>2026-08-16T08:00:00</PlannedStart>
<PlannedEnd>2026-08-16T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHAPLEAU DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W2C.CHXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLD14-W2C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLDL2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313708</OutageID>
<PlannedStart>2026-08-16T17:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS KL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLD14-W2C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS OLDL2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313715</OutageID>
<PlannedStart>2026-08-03T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V: DETWEILER TS x ORANGEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313728</OutageID>
<PlannedStart>2026-08-10T07:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V: DETWEILER TS x ORANGEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313742</OutageID>
<PlannedStart>2026-08-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SS1-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313743</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-09-04T15:45:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313758</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T05:15:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313771</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313774</OutageID>
<PlannedStart>2026-08-09T12:00:00</PlannedStart>
<PlannedEnd>2026-08-15T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANJIGAMI TS 844</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1304</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1305</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DA WATSON TS 1306</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-GL1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS D-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS DL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT2L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-HT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1SC1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313775</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-03T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS HT1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS R1</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1-HT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T1SC1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313909</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T1-Z7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR WALKER MTS 2 T2-Z1E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313921</OutageID>
<PlannedStart>2026-09-10T20:30:00</PlannedStart>
<PlannedEnd>2026-09-14T07:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313922</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 KL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313924</OutageID>
<PlannedStart>2026-08-19T06:15:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H38.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKESHORE TS 530-H38</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEAMINGTON TS 393T2-H38</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEAMINGTON TS 393T3-H38</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313926</OutageID>
<PlannedStart>2026-09-04T15:00:00</PlannedStart>
<PlannedEnd>2026-09-06T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K2-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313927</OutageID>
<PlannedStart>2026-09-06T07:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313928</OutageID>
<PlannedStart>2026-09-06T08:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313931</OutageID>
<PlannedStart>2026-09-09T07:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COWAL JCT 53L45-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COWAL JCT 53L45-52</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUART TS 247T1-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EDGEWARE TS T1-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS AL45</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS T5L45</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS W52-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SPENCE SS 251-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.COXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.DJXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.DJXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.SPXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313933</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H53Z: LAKESHORE TS x WINDSOR LAUZON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313935</OutageID>
<PlannedStart>2026-09-12T06:00:00</PlannedStart>
<PlannedEnd>2026-09-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS 21-M21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L20-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21-T3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS L21_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS OLDL20-T4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PRESTON TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313936</OutageID>
<PlannedStart>2026-09-13T09:00:00</PlannedStart>
<PlannedEnd>2026-09-27T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P1L49</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P1P2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PL23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 PL24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313937</OutageID>
<PlannedStart>2026-09-13T09:00:00</PlannedStart>
<PlannedEnd>2026-09-27T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAMBTON TS 2 P1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAMBTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313946</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>V41N: NOVA SS x SCOTT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314058</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11CA-SS1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314130</OutageID>
<PlannedStart>2026-07-22T12:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L9C: LEASIDE TS x CECIL TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314131</OutageID>
<PlannedStart>2026-07-24T04:00:00</PlannedStart>
<PlannedEnd>2026-07-24T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L4C: LEASIDE TS x CHARLES TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314137</OutageID>
<PlannedStart>2026-07-27T04:00:00</PlannedStart>
<PlannedEnd>2026-07-27T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314138</OutageID>
<PlannedStart>2026-07-24T12:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314149</OutageID>
<PlannedStart>2026-07-22T04:00:00</PlannedStart>
<PlannedEnd>2026-07-22T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L15: LEASIDE TS x BRIDGMAN TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314184</OutageID>
<PlannedStart>2026-07-27T09:00:00</PlannedStart>
<PlannedEnd>2026-07-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ZURICH JCT 364B23D-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314185</OutageID>
<PlannedStart>2026-07-27T09:00:00</PlannedStart>
<PlannedEnd>2026-07-27T10:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B23D.FJXSJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.MJXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.MJXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.MJXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.SEXZJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.STXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.STXSE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.STXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.WIXSE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.WIXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.ZJXFJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.ZJXZS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314216</OutageID>
<PlannedStart>2026-07-29T14:00:00</PlannedStart>
<PlannedEnd>2026-07-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B23D.FJXSJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.MJXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.MJXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.MJXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.SEXZJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.STXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.STXSE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.STXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.WIXSE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.WIXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.ZJXFJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B23D.ZJXZS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314218</OutageID>
<PlannedStart>2026-09-14T16:30:00</PlannedStart>
<PlannedEnd>2026-09-15T07:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS L7S-M18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314240</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>X522A.HAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X523A.HAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314272</OutageID>
<PlannedStart>2026-07-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLE RIVER JCT 53K6Z-K2Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TILBURY JCT 2316K2Z-53</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314273</OutageID>
<PlannedStart>2026-08-25T06:15:00</PlannedStart>
<PlannedEnd>2026-08-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLE RIVER JCT 53K6Z-K2Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.BEXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.BJXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.PJXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K6Z.TIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KINGSVILLE TS 3T6-K6Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TILBURY JCT 2316K2Z-53</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-K6Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314809</OutageID>
<PlannedStart>2026-05-15T11:30:00</PlannedStart>
<PlannedEnd>2026-12-31T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ANDREWS TS TMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314824</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T23C: CLARINGTON TS x CHERRYWOOD TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314943</OutageID>
<PlannedStart>2026-09-10T07:00:00</PlannedStart>
<PlannedEnd>2026-09-11T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S1H: OWEN SOUND TS x HANOVER TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314944</OutageID>
<PlannedStart>2026-09-17T06:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANOVER TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MEAFORD TS A1-OS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS C2-S2S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS T5L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S1H.HAXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2S.MEXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314945</OutageID>
<PlannedStart>2026-09-18T08:30:00</PlannedStart>
<PlannedEnd>2026-09-18T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANOVER TS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T3H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANOVER TS T4H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS L1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS T5L1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S1H.HAXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315006</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORLEANS TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315159</OutageID>
<PlannedStart>2026-06-09T16:00:00</PlannedStart>
<PlannedEnd>2026-09-01T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3-WT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315201</OutageID>
<PlannedStart>2026-05-26T07:00:00</PlannedStart>
<PlannedEnd>2027-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE GS T5-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315343</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>Q2AH: BECK 1 SS x BEACH TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315375</OutageID>
<PlannedStart>2026-05-20T15:03:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS DL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L26L31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS L31L32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS PL32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS R2H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS R3D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315398</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLISTON JCT 1807E8V-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS 9T3-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLISTON TS T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.ALXEV</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>E8V.EVXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS 18-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138E8V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>EVERETT TS 138T2-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS HL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS TL7L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315442</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-08-15T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>ENBRIDGE PIPELINES HILTON CTS TX-1-IS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315456</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X1P: CHENAUX TS x DOBBIN TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315467</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>B6M.BIXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.CAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.KAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.KAXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MOXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MUXMU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.MUXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SHXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.SQXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B6M.STXSH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315542</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-05T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T15-A43A44</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315623</OutageID>
<PlannedStart>2026-08-11T05:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T12-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315626</OutageID>
<PlannedStart>2026-08-18T05:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T11-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315701</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C7BM.ARXAR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CEXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CHXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CJXNQ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.FIXNQ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.LIXWO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.MAXMD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.NQXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.NQXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.WOXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315706</OutageID>
<PlannedStart>2026-08-27T05:30:00</PlannedStart>
<PlannedEnd>2026-09-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36H2JK-37</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H2JK.JOXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS H2JK-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315718</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-09-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS D3-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS D3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS D4_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315729</OutageID>
<PlannedStart>2026-07-20T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T25B: CLARINGTON TS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315730</OutageID>
<PlannedStart>2026-07-22T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>T25B: CLARINGTON TS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315736</OutageID>
<PlannedStart>2026-05-27T08:00:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B502M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315847</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS D1HT15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315895</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315906</OutageID>
<PlannedStart>2026-09-10T05:30:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L7L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C7E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315916</OutageID>
<PlannedStart>2026-07-20T07:00:00</PlannedStart>
<PlannedEnd>2026-07-21T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MILTON SS L61L71</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315936</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS H1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315938</OutageID>
<PlannedStart>2026-07-29T12:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS K1L2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315976</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>D6V.DEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.FEXOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D6V.GUXFE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316062</OutageID>
<PlannedStart>2026-08-23T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C550VP.CHXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C550VP.CLXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C550VP.PJXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS AL550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS W2L550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS HT4L550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316067</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICKERING A SS H_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS L7H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICKERING A SS T4H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316080</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C16L.SHXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C16L.SHXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316081</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X527B: LENNOX TS x BOWMANVILLE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316122</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-08-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C550VP.CHXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C550VP.CLXPJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C550VP.PJXPR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS 81-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-C550VP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316189</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS HT2L22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316240</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS L2Y-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P1-P3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P2-P3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T3-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T3A3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T3A4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS T4-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L2Y.GLXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-L2Y</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316263</OutageID>
<PlannedStart>2026-08-04T06:00:00</PlannedStart>
<PlannedEnd>2026-08-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS 296-T29C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS HT3L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS L29_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS P2L29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316320</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-27T11:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316322</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS T2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316324</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS 4-X1P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS 20-X1P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAZINAW DS AF2T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MOXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MOXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316326</OutageID>
<PlannedStart>2026-09-13T07:00:00</PlannedStart>
<PlannedEnd>2026-09-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS 4-X1P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS 20-X1P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAZINAW DS AF2T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MAXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MOXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1P.MOXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316365</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-08-21T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316374</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GAGE TS 24-K2G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K2G.KEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENILWORTH TS 27-K2G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316387</OutageID>
<PlannedStart>2026-07-20T09:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS 45T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316388</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316391</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H23B: HINCHINBROOKE SS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316392</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H23B: HINCHINBROOKE SS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316393</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-09-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>P15C.CHXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316396</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L21H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316397</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L20H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316398</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L21H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316399</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L20H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316435</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARLAW TS T1A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS H1L-34</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS JA1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS JA2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GERRARD TS QA14A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H1L.BLXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H1L.GEXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS 34-H1L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316439</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M570V.MIXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316464</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M34H.MIXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316465</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>B3.DUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3.GLXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3.HOXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3.MCXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3.MCXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B3.MOXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.DUXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.GLXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.HOXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.MCXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.MCXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.MOXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316466</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>B12BL.ALXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.BRXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.BUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.DUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.HOXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.HOXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.NEXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.BRXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.BRXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.BUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.DUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.HOXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.HOXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.NEXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.POXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B13BL.POXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316509</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-03T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS 3015H1-A93I</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS H1-A94N</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS H1L91</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS H1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS T2-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ANSONVILLE TS T2-LT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316512</OutageID>
<PlannedStart>2026-08-29T08:00:00</PlannedStart>
<PlannedEnd>2026-08-29T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS 86-C43H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS L28L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316513</OutageID>
<PlannedStart>2026-08-30T08:00:00</PlannedStart>
<PlannedEnd>2026-08-30T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS 86-C65H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS L44L65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316530</OutageID>
<PlannedStart>2026-07-21T06:00:00</PlannedStart>
<PlannedEnd>2026-07-31T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>S2N.KEXAD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2N.KEXEN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2N.SYXAD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2N.SYXST</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316538</OutageID>
<PlannedStart>2026-07-29T16:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FERGUS TS M3-M6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FERGUS TS UFLS2</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316540</OutageID>
<PlannedStart>2026-06-10T19:00:00</PlannedStart>
<PlannedEnd>2026-08-27T17:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS 6-H4Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS DT3-DT4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS DT3L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS DT4L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS H4Z-L5H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T3-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS T4-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316544</OutageID>
<PlannedStart>2026-06-05T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANTOINE TS 583L5A-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316545</OutageID>
<PlannedStart>2026-06-10T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANTOINE TS 583A4Z-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316607</OutageID>
<PlannedStart>2026-07-25T07:00:00</PlannedStart>
<PlannedEnd>2026-07-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC12SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316659</OutageID>
<PlannedStart>2026-08-17T07:00:00</PlannedStart>
<PlannedEnd>2026-09-04T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL29</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL47</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL87</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS KL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC21K</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316665</OutageID>
<PlannedStart>2026-08-01T11:30:00</PlannedStart>
<PlannedEnd>2026-08-01T12:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-V586M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS L552L586</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS PL586</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316695</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-09-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M80B: MINDEN TS x BROWN HILL TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316698</OutageID>
<PlannedStart>2026-09-16T08:00:00</PlannedStart>
<PlannedEnd>2026-09-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M81B: MINDEN TS x BROWN HILL TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316721</OutageID>
<PlannedStart>2026-08-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS HT16_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316722</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316815</OutageID>
<PlannedStart>2026-08-18T07:30:00</PlannedStart>
<PlannedEnd>2026-08-18T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T14</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T14-HT14</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T14-W2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316816</OutageID>
<PlannedStart>2026-08-16T07:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT14L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT14L79</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS HT14_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T14</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T14-HT14</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS T14-W2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS W2L511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS W2L550</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS W2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316825</OutageID>
<PlannedStart>2026-08-18T06:00:00</PlannedStart>
<PlannedEnd>2026-08-19T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>Kapuskasing CTS 5-230-ML</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Kapuskasing CTS 52T5M</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Kapuskasing CTS 9K38S-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Kapuskasing CTS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316828</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-08T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS 31-R17T</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K1K2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS KL37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TRAFALGAR TS T15L17</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316830</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316831</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316832</OutageID>
<PlannedStart>2026-07-30T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T28</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316835</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>A4K.BLXCY</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>A4K.HAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316866</OutageID>
<PlannedStart>2026-07-15T10:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-H35D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316874</OutageID>
<PlannedStart>2026-08-31T05:45:00</PlannedStart>
<PlannedEnd>2026-11-05T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS 92M7E-MTU05</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316884</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>L21H.CRXEA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21H.CRXHI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21H.EAXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316906</OutageID>
<PlannedStart>2026-07-15T10:00:00</PlannedStart>
<PlannedEnd>2026-07-29T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS A1H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS A3H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316908</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS A1H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS A3H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316909</OutageID>
<PlannedStart>2026-07-30T16:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS A1H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS A3H3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316936</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-08-07T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B1S: BARRETT CHUTE SS x SIDNEY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316940</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B1S: BARRETT CHUTE SS x SIDNEY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P3S: DOBBIN TS x SIDNEY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P4S: DOBBIN TS x SIDNEY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316944</OutageID>
<PlannedStart>2026-07-27T04:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H23B: HINCHINBROOKE SS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316948</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H23B: HINCHINBROOKE SS x BELLEVILLE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316964</OutageID>
<PlannedStart>2026-07-27T08:00:00</PlannedStart>
<PlannedEnd>2026-07-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316965</OutageID>
<PlannedStart>2026-07-29T08:00:00</PlannedStart>
<PlannedEnd>2026-07-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS TL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316967</OutageID>
<PlannedStart>2026-08-03T08:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS 78-T25B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316971</OutageID>
<PlannedStart>2026-08-04T08:00:00</PlannedStart>
<PlannedEnd>2026-08-04T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316975</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS TL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316976</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS 78-H23B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELLEVILLE TS H1H2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316979</OutageID>
<PlannedStart>2026-08-07T12:30:00</PlannedStart>
<PlannedEnd>2026-08-07T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS 12-B1S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIDNEY TS TL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316984</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T1-A4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316985</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316986</OutageID>
<PlannedStart>2026-08-10T08:00:00</PlannedStart>
<PlannedEnd>2026-08-21T12:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B1S: BARRETT CHUTE SS x SIDNEY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316996</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS TL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316997</OutageID>
<PlannedStart>2026-08-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>L20H.CRXEA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20H.CRXHI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L20H.EAXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316998</OutageID>
<PlannedStart>2026-08-17T08:00:00</PlannedStart>
<PlannedEnd>2026-08-18T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317001</OutageID>
<PlannedStart>2026-08-21T12:30:00</PlannedStart>
<PlannedEnd>2026-08-21T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS 12-B1S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIDNEY TS L1L4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIDNEY TS TL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317002</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT HOPE TS T2-A3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317003</OutageID>
<PlannedStart>2026-08-31T08:00:00</PlannedStart>
<PlannedEnd>2026-08-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SIDNEY TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SIDNEY TS T2-HT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317057</OutageID>
<PlannedStart>2026-08-05T08:00:00</PlannedStart>
<PlannedEnd>2026-08-06T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CONSTANCE DS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CONSTANCE DS TR1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317075</OutageID>
<PlannedStart>2026-08-08T08:00:00</PlannedStart>
<PlannedEnd>2026-08-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L4C: LEASIDE TS x CHARLES TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317119</OutageID>
<PlannedStart>2026-08-09T01:30:00</PlannedStart>
<PlannedEnd>2026-08-09T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B12BL.ALXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.BRXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.BUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.DUXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.HOXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.HOXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B12BL.NEXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS 12-B12BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS 12-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-B12BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUNDAS 2 TS 117T5-B12BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NEWTON TS 26-B12BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317170</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L1S.MAXSU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317187</OutageID>
<PlannedStart>2026-08-05T07:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-R1K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2L19</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2L24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2L73</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2L76</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS A2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS T8-A2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317192</OutageID>
<PlannedStart>2026-08-26T06:00:00</PlannedStart>
<PlannedEnd>2026-08-28T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B560V.BRXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B560V.BRXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B560V.BRXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B560V.MIXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317197</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-09-12T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS 48-L24A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L24A.C2XCR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L24A.LAXRR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L24A.RRXC2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-48</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L24A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317293</OutageID>
<PlannedStart>2026-07-28T08:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CONSTANCE DS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CONSTANCE DS TR2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317299</OutageID>
<PlannedStart>2026-06-18T15:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ANDREWS TS TMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317310</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-07-21T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTER RAPIDS GS T2-R21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317341</OutageID>
<PlannedStart>2026-09-17T20:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1-E2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS E1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS EL542</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317347</OutageID>
<PlannedStart>2026-07-13T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S39M: SUMMERHAVEN SS x MIDDLEPORT TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317358</OutageID>
<PlannedStart>2026-08-18T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317374</OutageID>
<PlannedStart>2026-07-23T08:00:00</PlannedStart>
<PlannedEnd>2026-07-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS 33-X29S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS 9-X29S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARTINDALE TS 9X29S-G</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X29S.HAXHB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X29S.HBXMB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X29S.MBXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317375</OutageID>
<PlannedStart>2026-07-21T08:00:00</PlannedStart>
<PlannedEnd>2026-08-07T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>H4Z.HOXIP</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317405</OutageID>
<PlannedStart>2026-08-13T04:00:00</PlannedStart>
<PlannedEnd>2026-08-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L5D: LEASIDE TS x DUPLEX TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317433</OutageID>
<PlannedStart>2026-07-22T04:00:00</PlannedStart>
<PlannedEnd>2026-07-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-Q30M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS D2HT3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS HT3L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS HT3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC11L37</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS T3-HT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317434</OutageID>
<PlannedStart>2026-08-19T08:00:00</PlannedStart>
<PlannedEnd>2026-08-19T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L20H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L21H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317435</OutageID>
<PlannedStart>2026-08-20T08:00:00</PlannedStart>
<PlannedEnd>2026-08-20T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>L22H: ST. LAWRENCE TS x HINCHINBROOKE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317441</OutageID>
<PlannedStart>2026-09-08T09:00:00</PlannedStart>
<PlannedEnd>2026-09-08T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317442</OutageID>
<PlannedStart>2026-09-09T09:00:00</PlannedStart>
<PlannedEnd>2026-09-09T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317452</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-09-09T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B88H: BROWN HILL TS x HOLLAND TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317453</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-09-11T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B89H: BROWN HILL TS x HOLLAND TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317473</OutageID>
<PlannedStart>2026-08-16T06:00:00</PlannedStart>
<PlannedEnd>2026-08-16T12:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRONTE TS 13M25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS 13M26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T2-B7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T2-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRONTE TS T2-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317479</OutageID>
<PlannedStart>2026-07-27T07:00:00</PlannedStart>
<PlannedEnd>2026-07-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORFOLK TS 22T1-C9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NORFOLK TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317495</OutageID>
<PlannedStart>2026-07-29T07:30:00</PlannedStart>
<PlannedEnd>2026-07-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GAGE TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
</DocBody>
</Document>