<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://reports-public.ieso.ca/docrefs/stylesheet/TxOutages_HTML_t1-1.xsl" ?>
<Document docID="TxOutagesTodayAll" xmlns="http://www.ieso.ca/schema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.ieso.ca/schema https://reports-public.ieso.ca/docrefs/schema/TxOutages_r1.xsd">
<DocHeader>
<DocTitle>All Transmission Outages Occurring Today</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-09-21T22:02:15</CreatedAt>
</DocHeader>
<DocBody>
<OutageRangeStart>2026-09-21T00:00:00</OutageRangeStart>
<OutageRangeEnd>2026-09-21T23:59:59</OutageRangeEnd>
<OutageRequest>
<OutageID>1-00018154</OutageID>
<PlannedStart>2017-02-07T11:05:00</PlannedStart>
<PlannedEnd>2026-12-31T22:59:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5D-B31L SS JCT 93B5D-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEAUHARNOIS GS L4B11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEAUHARNOIS GS L6B12</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PAUGAN TS L3B20</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00103070</OutageID>
<PlannedStart>2018-12-03T18:27:00</PlannedStart>
<PlannedEnd>2026-12-31T22:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MAJESTIC CTS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MAJESTIC CTS T2B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00117652</OutageID>
<PlannedStart>2019-05-29T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS SC1.2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FORT FRANCES TS SC1.2-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00119945</OutageID>
<PlannedStart>2019-06-24T17:25:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORFOLK TS VC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00123136</OutageID>
<PlannedStart>2025-12-29T16:01:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>U</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISO WAVE E0MCPH-110.BK8_BKR</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E0MCPH-110.BK9_BKR</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E0SHBK-110.JB14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E0STAFFD-110.B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E0STAFFD-110.B4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E0STAFFD-110.B7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E4CANIFF-120.LB</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E4STEPHENS-345.DF</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MISO WAVE E4STEPHENS-345.DM</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00168469</OutageID>
<PlannedStart>2021-03-27T18:20:00</PlannedStart>
<PlannedEnd>2026-12-31T15:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00176167</OutageID>
<PlannedStart>2021-07-09T10:50:00</PlannedStart>
<PlannedEnd>2026-11-18T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00225094</OutageID>
<PlannedStart>2019-11-08T08:00:00</PlannedStart>
<PlannedEnd>2026-12-03T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C20R: CHERRYWOOD TS x RICHVIEW TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00238542</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00249610</OutageID>
<PlannedStart>2024-03-15T08:00:00</PlannedStart>
<PlannedEnd>2027-12-31T23:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS C8A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00252399</OutageID>
<PlannedStart>2026-07-27T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T05:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS EL502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDAL562</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDA_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDEL569</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDE_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDHT4L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLDT4A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00254335</OutageID>
<PlannedStart>2024-05-14T15:54:00</PlannedStart>
<PlannedEnd>2027-12-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITESHELL TS PS7</EquipmentName>
<EquipmentType>PhaseShifter</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITESHELL TS R4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITESHELL TS R70</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00254393</OutageID>
<PlannedStart>2024-05-14T13:00:00</PlannedStart>
<PlannedEnd>2027-12-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K21W.WHXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K21W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00257104</OutageID>
<PlannedStart>2024-06-20T18:00:00</PlannedStart>
<PlannedEnd>2027-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS 205</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00258796</OutageID>
<PlannedStart>2024-07-15T12:15:00</PlannedStart>
<PlannedEnd>2026-12-31T23:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTTER RAPIDS GS T2-R21D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00259300</OutageID>
<PlannedStart>2026-09-13T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS D1D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00263077</OutageID>
<PlannedStart>2024-08-22T14:20:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00265966</OutageID>
<PlannedStart>2024-09-17T06:38:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RIVERDALE TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00266753</OutageID>
<PlannedStart>2025-12-04T07:00:00</PlannedStart>
<PlannedEnd>2026-12-31T17:30:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BORALEX TILBURY JCT 647K2Z-54</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENT TS 5-N5K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENT TS L2L5</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N5K.KEXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00267335</OutageID>
<PlannedStart>2025-12-18T17:30:00</PlannedStart>
<PlannedEnd>2026-12-31T17:30:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>N5K.KIXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N5K.WAXKI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS 40-N5K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WALLACEBURG TS 1N5K-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00268216</OutageID>
<PlannedStart>2026-03-17T10:30:00</PlannedStart>
<PlannedEnd>2026-11-11T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS T2-X22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00269060</OutageID>
<PlannedStart>2026-09-10T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GERRARD TS YA2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00269611</OutageID>
<PlannedStart>2024-10-27T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS T13</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NANTICOKE TS T13-WT13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00271382</OutageID>
<PlannedStart>2024-12-20T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00272677</OutageID>
<PlannedStart>2024-11-27T18:46:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LONGWOOD TS R3</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00273271</OutageID>
<PlannedStart>2024-12-02T09:11:00</PlannedStart>
<PlannedEnd>2027-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MOULTON MTS 8CS2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOULTON MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00283208</OutageID>
<PlannedStart>2025-12-17T14:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BASIN RVSC 52</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285434</OutageID>
<PlannedStart>2026-09-03T16:30:00</PlannedStart>
<PlannedEnd>2026-09-26T08:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A1-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A11_BUSSOUTH</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS AQ11S-A11</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS E8-E9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285554</OutageID>
<PlannedStart>2026-09-05T16:00:00</PlannedStart>
<PlannedEnd>2027-03-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285558</OutageID>
<PlannedStart>2026-03-31T08:00:00</PlannedStart>
<PlannedEnd>2026-10-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3L521</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS H3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285801</OutageID>
<PlannedStart>2026-09-05T15:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K1L43</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K2-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS K2L65</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC21K1-K1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D2-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00285887</OutageID>
<PlannedStart>2025-06-15T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286152</OutageID>
<PlannedStart>2025-06-06T09:00:00</PlannedStart>
<PlannedEnd>2026-10-09T20:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GLENGROVE TS P3_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00286541</OutageID>
<PlannedStart>2026-09-16T04:00:00</PlannedStart>
<PlannedEnd>2026-11-06T19:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2002</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2102</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2202</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2302</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2322</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288058</OutageID>
<PlannedStart>2025-06-26T13:30:00</PlannedStart>
<PlannedEnd>2027-03-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GERRARD TS JA2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288372</OutageID>
<PlannedStart>2025-07-02T11:53:00</PlannedStart>
<PlannedEnd>2026-10-14T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRAMALEA TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288469</OutageID>
<PlannedStart>2025-07-03T14:00:00</PlannedStart>
<PlannedEnd>2030-12-31T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS L33_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS L34_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288837</OutageID>
<PlannedStart>2025-07-08T16:57:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ISLAND FALLS CGS IS G3</EquipmentName>
<EquipmentType>GeneratingUnit</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00288970</OutageID>
<PlannedStart>2026-08-20T17:00:00</PlannedStart>
<PlannedEnd>2026-09-25T17:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00289718</OutageID>
<PlannedStart>2021-12-12T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T15:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NORFOLK TS VC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290612</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-29T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOBBIN TS 20-P4S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS DL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS KL4</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOBBIN TS T5-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00290683</OutageID>
<PlannedStart>2025-07-28T16:28:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMPBELL TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292309</OutageID>
<PlannedStart>2026-09-01T08:00:00</PlannedStart>
<PlannedEnd>2026-12-13T23:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1T3-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS H1T2-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HINCHINBROOKE SS 10-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.DEXWE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.HIXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X2H.WEXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00292322</OutageID>
<PlannedStart>2026-08-10T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00293516</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS 56-H53Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS A_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T11Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T12Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T5-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T8-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294323</OutageID>
<PlannedStart>2026-09-01T06:00:00</PlannedStart>
<PlannedEnd>2026-11-05T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS T2-M7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294328</OutageID>
<PlannedStart>2026-09-13T06:00:00</PlannedStart>
<PlannedEnd>2026-12-11T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS OLD_T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS T2-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294329</OutageID>
<PlannedStart>2026-09-09T18:00:00</PlannedStart>
<PlannedEnd>2026-10-20T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS A1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS B2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS H1-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS SS3-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-A1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS T2-H1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294340</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H24S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTO HOLDEN TS 6-H24S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WIDDIFIELD TS H24S-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00294347</OutageID>
<PlannedStart>2026-08-23T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MISSISSAGI TS 34-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P25W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS 14-P25W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295071</OutageID>
<PlannedStart>2026-08-25T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BIRCH TS 17-P7B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P7B.BIXPO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORT ARTHUR TS 1 2P7B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295098</OutageID>
<PlannedStart>2026-08-26T07:00:00</PlannedStart>
<PlannedEnd>2026-10-01T17:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>FORT WILLIAM TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295116</OutageID>
<PlannedStart>2026-08-03T06:15:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>D4M.OTXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D4M.OTXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DES JOACHIMS TS 5-D4M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MINDEN TS 87-D4M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTTER CREEK JCT B9D4M-B8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295123</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS R2</EquipmentName>
<EquipmentType>Reactor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS T2SC2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPT2-HT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295125</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS AT-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS ATPT-AT</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS T2-AT</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS T2B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS T3-AT</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS T3B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS TL2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS TL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOOSE LAKE TS TSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295129</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2L501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T6-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295130</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T14:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2L501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2L502</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS HT8D1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS HT8D2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS HT8_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SC22HT8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T6-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8-HT8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295134</OutageID>
<PlannedStart>2026-09-15T03:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS 6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX JCT 319E34M-6</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295205</OutageID>
<PlannedStart>2025-09-29T12:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKESHORE TS 530-H76</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295379</OutageID>
<PlannedStart>2025-10-30T15:00:00</PlannedStart>
<PlannedEnd>2026-11-13T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS MTU05-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS SC2-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORILLIA TS SC2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295508</OutageID>
<PlannedStart>2026-07-19T12:15:00</PlannedStart>
<PlannedEnd>2026-10-02T13:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE B SS P-P5</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295586</OutageID>
<PlannedStart>2026-09-20T06:15:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DETWEILER TS 26-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GALT JCT M20D-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295619</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS 278K7-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS L7L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295733</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-L17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00295798</OutageID>
<PlannedStart>2026-09-14T09:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OTONABEE TS 128T2-T22C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OTONABEE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296046</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-16T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX GS TSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>21 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296108</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS 19-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MODELAND TS T4-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.BOXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.BOXWO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.LUXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.LUXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.LUXSC</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.PLXCO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.WJXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>N22W.WJXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SCOTT TS 40-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WANSTEAD TS 41T2-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS SS5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS T5-N22W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WONDERLAND TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296172</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296278</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS EK</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS K_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T17-L17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296312</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT 61M18-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DL6</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL18</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T6-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. MARYS TS BY</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>14 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296672</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:01:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS 153-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS L82L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2-L82</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296683</OutageID>
<PlannedStart>2026-09-01T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BURLINGTON TS 39-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENORCHY JCT 7402T37B-MSO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PALERMO TS T4-T37B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296798</OutageID>
<PlannedStart>2025-11-27T08:00:00</PlannedStart>
<PlannedEnd>2027-04-04T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS 36T1-A6R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS A6R-TEMPNEWT1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00296803</OutageID>
<PlannedStart>2025-11-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-14T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RUSSELL TS 36T2-A5RK</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUSSELL TS A5RK-TEMPNEWT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297059</OutageID>
<PlannedStart>2025-10-16T16:00:00</PlannedStart>
<PlannedEnd>2027-02-01T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-S7M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D2L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS D2LT21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00297865</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRETT CHUTE SS H2L3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298188</OutageID>
<PlannedStart>2025-10-27T06:40:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-S7M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298837</OutageID>
<PlannedStart>2026-09-09T08:30:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STIRTON TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STIRTON TS T4-L3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>36 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298848</OutageID>
<PlannedStart>2026-09-13T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1L552</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D1_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS D2_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL511</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL551</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL560</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS DL570</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00298849</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B4.GLXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B4.MOXGL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HORNING MOUNTAIN JCT 76B4-1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS 20T1-B4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MOHAWK TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299153</OutageID>
<PlannedStart>2026-01-26T08:00:00</PlannedStart>
<PlannedEnd>2026-12-10T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H24S.GRXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H24S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00299527</OutageID>
<PlannedStart>2025-11-18T08:00:00</PlannedStart>
<PlannedEnd>2027-12-30T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K21W.WHXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KENORA TS 34-K21W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300160</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS T1-P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300614</OutageID>
<PlannedStart>2025-07-20T10:10:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BARRIE TS SC3E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300889</OutageID>
<PlannedStart>2025-11-30T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T5-L22</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300948</OutageID>
<PlannedStart>2025-11-19T17:00:00</PlannedStart>
<PlannedEnd>2035-12-31T18:01:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA301: BECK 2 TS x NY NIAGARA 345 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>STDY</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00300950</OutageID>
<PlannedStart>2025-11-19T17:00:00</PlannedStart>
<PlannedEnd>2035-12-31T18:01:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PA302: BECK 2 TS x NY NIAGARA 345 KV</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>345 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>SUB</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301379</OutageID>
<PlannedStart>2025-11-25T08:00:00</PlannedStart>
<PlannedEnd>2031-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. LAWRENCE TS 49-L5C</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301695</OutageID>
<PlannedStart>2025-11-30T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 115_TMP7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 230_TMP7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00301875</OutageID>
<PlannedStart>2026-01-27T09:00:00</PlannedStart>
<PlannedEnd>2026-11-23T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302313</OutageID>
<PlannedStart>2025-12-05T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T17:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS YZ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00302902</OutageID>
<PlannedStart>2025-12-06T08:52:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS HT3L32</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303611</OutageID>
<PlannedStart>2025-12-16T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARDIFF TS 135T1-V42H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CARDIFF TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303637</OutageID>
<PlannedStart>2025-12-17T08:00:00</PlannedStart>
<PlannedEnd>2026-12-17T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PLEASANT TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00303784</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M2W.MAXBL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2W.MAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304017</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WAWA TS TEMPSS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304817</OutageID>
<PlannedStart>2026-02-23T08:00:00</PlannedStart>
<PlannedEnd>2026-11-25T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00304973</OutageID>
<PlannedStart>2026-03-06T15:30:00</PlannedStart>
<PlannedEnd>2026-11-11T10:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PICTON TS OLD28T1-X21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS OLDT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305777</OutageID>
<PlannedStart>2026-01-20T03:00:00</PlannedStart>
<PlannedEnd>2026-10-30T23:59:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NAPANEE GENERATING STATION 8433-N535N (D2T3-T3)</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305822</OutageID>
<PlannedStart>2026-06-01T17:45:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8-HT8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS TEMPH2-BO1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>46 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00305846</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-26T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS Q2A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21-HL16</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS T21Y1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306332</OutageID>
<PlannedStart>2026-01-23T10:45:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306898</OutageID>
<PlannedStart>2026-09-01T04:00:00</PlannedStart>
<PlannedEnd>2026-10-02T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>REXDALE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>REXDALE TS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00306916</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS 31T1-A6R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OVERBROOK TS T1Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00307649</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>P15C.CHXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308080</OutageID>
<PlannedStart>2026-03-27T16:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS M9-B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINDSOR LAUZON TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308088</OutageID>
<PlannedStart>2026-02-11T12:30:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B562E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B569B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T28-HT28</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308162</OutageID>
<PlannedStart>2026-06-15T08:00:00</PlannedStart>
<PlannedEnd>2026-12-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS SS3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308330</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-11-17T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28R27-PA27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS R27-S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PA27.NIXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308682</OutageID>
<PlannedStart>2026-02-18T11:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T27-WT27</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00308831</OutageID>
<PlannedStart>2026-04-15T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKAY TS 668</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKAY TS PL3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309134</OutageID>
<PlannedStart>2026-03-12T16:30:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BFN JCT 653W4H-9989</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309422</OutageID>
<PlannedStart>2026-02-27T13:18:00</PlannedStart>
<PlannedEnd>2026-12-11T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANTFORD TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00309843</OutageID>
<PlannedStart>2026-03-05T08:47:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 169</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310224</OutageID>
<PlannedStart>2026-03-11T15:17:00</PlannedStart>
<PlannedEnd>2026-12-18T07:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 145</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310268</OutageID>
<PlannedStart>2026-03-12T11:30:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00310846</OutageID>
<PlannedStart>2026-05-23T09:00:00</PlannedStart>
<PlannedEnd>2026-10-17T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PRESTON TS JBUS-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311490</OutageID>
<PlannedStart>2026-09-15T05:00:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS 3103T1-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS AB</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JIM YARROW MTS T1Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00311865</OutageID>
<PlannedStart>2026-09-15T00:00:00</PlannedStart>
<PlannedEnd>2026-12-18T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3-C4R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312122</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M32W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312393</OutageID>
<PlannedStart>2026-08-05T04:00:00</PlannedStart>
<PlannedEnd>2026-12-11T08:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS T4-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>28 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312403</OutageID>
<PlannedStart>2026-04-27T07:00:00</PlannedStart>
<PlannedEnd>2027-12-16T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS SVC1</EquipmentName>
<EquipmentType>SVC</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T1-D1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312464</OutageID>
<PlannedStart>2026-08-10T06:00:00</PlannedStart>
<PlannedEnd>2026-10-14T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>JOHN TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JOHN TS T3-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312877</OutageID>
<PlannedStart>2026-04-20T15:00:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS T25-A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00312938</OutageID>
<PlannedStart>2026-09-14T06:15:00</PlannedStart>
<PlannedEnd>2026-10-02T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MEAFORD TS A1-OS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS C2-S2S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S2S.MEXOW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313043</OutageID>
<PlannedStart>2026-08-24T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T17:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS HL21</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>5 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313118</OutageID>
<PlannedStart>2026-08-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHENAUX TS A1A2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313129</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STAYNER TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313132</OutageID>
<PlannedStart>2026-04-22T18:46:00</PlannedStart>
<PlannedEnd>2026-12-18T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 147</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313374</OutageID>
<PlannedStart>2026-08-09T17:00:00</PlannedStart>
<PlannedEnd>2026-12-05T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2-T4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHARLES TS H2BUS-TEMP</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313396</OutageID>
<PlannedStart>2026-06-23T14:00:00</PlannedStart>
<PlannedEnd>2026-10-31T21:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BELL CREEK CTS TT_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS ENERCORP_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS LINDE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS ASHGROVE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS NORAMPTRENT_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS SANOFI_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS STEM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS UOFT_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHERRYWOOD TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COTE GOLD CTS LOAD-LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS 1X7DRA_SW</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS 1Y7DRA_SW</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO KENILWORTH CTS 7Y6DRA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO KENILWORTH CTS 8X6DRA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS GCPOWER_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESSA TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FLAKEBOARD TS TT_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS PLACERDOMECA_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>JBL CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS ENPOWINC_DRASW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX GS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MCMASTER CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS AESLNR1_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS EDGECOM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS ENPOWINC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS HCE_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS HHSC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS OPG_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS STELCO_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS STEM_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS UOG_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS VOLTUS_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PANABRASIVES CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PATRICK ST TS T6_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PICTON TS ESSROC_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RAINY RIVER GOLD CTS LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>U.S. STEEL NANTICOKE CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WEYERHAEUSER DRYDEN CTS T1_LF_DRA_SW</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313443</OutageID>
<PlannedStart>2026-09-04T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANT TS 12-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS DTL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2-TL13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS TL13_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313529</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS 5T6-R19TH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ERINDALE TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313533</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS 17-Q2AH</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEAMSVILLE TS 18Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.HAXSA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.SAXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q2AH.WI2XWI2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS 115Q2AH-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WINONA TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313634</OutageID>
<PlannedStart>2026-05-04T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:30:00</PlannedEnd>
<Priority>U</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T3-HT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T3-L580</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313758</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A16</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313771</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DUFFERIN TS T4-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313927</OutageID>
<PlannedStart>2026-09-06T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL28</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL31</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL42</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL44</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL64</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DL88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC22D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS SC23D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313928</OutageID>
<PlannedStart>2026-09-06T08:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313933</OutageID>
<PlannedStart>2026-09-17T07:00:00</PlannedStart>
<PlannedEnd>2026-10-08T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>H53Z: LAKESHORE TS x WINDSOR LAUZON TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00313945</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-10-02T15:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS 278K7-B2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>COMMERCE WAY TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS L7L12</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KARN TS T1L7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WOODSTOCK TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314058</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11CA-SS1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11H1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SC11SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HEARN SS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314063</OutageID>
<PlannedStart>2026-05-08T16:00:00</PlannedStart>
<PlannedEnd>2026-09-21T08:00:00</PlannedEnd>
<Priority>U</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PIPERVILLE JCT 644L24A-MSO3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314272</OutageID>
<PlannedStart>2026-07-01T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BELLE RIVER JCT 53K6Z-K2Z</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TILBURY JCT 2316K2Z-53</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00314809</OutageID>
<PlannedStart>2026-05-15T11:30:00</PlannedStart>
<PlannedEnd>2026-12-31T08:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ANDREWS TS TMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315158</OutageID>
<PlannedStart>2026-05-19T06:52:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS R2-T2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS T2-HT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS T2-LT2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315201</OutageID>
<PlannedStart>2026-05-26T07:00:00</PlannedStart>
<PlannedEnd>2027-09-30T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STEWARTVILLE GS T5-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315398</OutageID>
<PlannedStart>2026-09-12T06:00:00</PlannedStart>
<PlannedEnd>2026-09-27T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS 22-E8V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS E8V-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS HL8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS SC21SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ORANGEVILLE TS TL7L8</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315736</OutageID>
<PlannedStart>2026-05-27T08:00:00</PlannedStart>
<PlannedEnd>2028-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B502M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRUCE A TS OLD21-B560V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315906</OutageID>
<PlannedStart>2026-09-10T06:00:00</PlannedStart>
<PlannedEnd>2026-09-25T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C5E.CEXTE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CECIL TS 49-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C5E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS 36-C7E</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L5L10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS L7L9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C5E-49</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS 1C7E-36</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T3-D3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4-D4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A10</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERAULEY TS T4A9</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315931</OutageID>
<PlannedStart>2026-05-28T12:27:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS A8-D2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00315974</OutageID>
<PlannedStart>2026-05-29T07:59:00</PlannedStart>
<PlannedEnd>2027-05-29T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OAKVILLE TS 2 SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316167</OutageID>
<PlannedStart>2026-06-01T19:20:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS H2L501</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316393</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>P15C.CHXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316544</OutageID>
<PlannedStart>2026-06-05T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANTOINE TS 583L5A-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316545</OutageID>
<PlannedStart>2026-06-10T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ANTOINE TS 583A4Z-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00316874</OutageID>
<PlannedStart>2026-08-31T06:00:00</PlannedStart>
<PlannedEnd>2026-11-05T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ORILLIA TS 92M7E-MTU05</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317299</OutageID>
<PlannedStart>2026-06-18T15:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. ANDREWS TS TMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317697</OutageID>
<PlannedStart>2026-09-14T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LESLIE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LESLIE TS T2-C5R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317801</OutageID>
<PlannedStart>2026-06-24T12:00:00</PlannedStart>
<PlannedEnd>2026-10-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS AL25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS DL26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS L25L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317840</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2027-02-23T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>X526B: LENNOX TS x BOWMANVILLE SS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317843</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2027-02-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LENNOX TS KL526</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317920</OutageID>
<PlannedStart>2026-06-26T04:00:00</PlannedStart>
<PlannedEnd>2026-09-30T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-M30A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-M31A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS B6-M32S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-WT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24-HT24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T24-WT24</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT21-WT21</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00317960</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>NC</Recurrence>
<EquipmentRequested>
<EquipmentName>W21M.MAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W22M.MAXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318023</OutageID>
<PlannedStart>2026-06-26T22:35:00</PlannedStart>
<PlannedEnd>2026-09-30T23:59:00</PlannedEnd>
<Priority>U</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DRYDEN TS 25-D32A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKEHEAD TS 12-A30L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-A30L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-A31L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS 20-D32A</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS DL22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS NEW L21L25</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS R2H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS R3D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318078</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS HT23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318102</OutageID>
<PlannedStart>2026-09-15T04:00:00</PlannedStart>
<PlannedEnd>2026-11-17T23:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2114</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318104</OutageID>
<PlannedStart>2026-09-15T04:00:00</PlannedStart>
<PlannedEnd>2026-11-17T23:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NY NIAGARA 230 KV 2122</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318168</OutageID>
<PlannedStart>2026-05-27T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MEADOWVALE TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MEADOWVALE TS SC2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318402</OutageID>
<PlannedStart>2026-08-24T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS SC4</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>10 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318505</OutageID>
<PlannedStart>2026-07-03T10:23:00</PlannedStart>
<PlannedEnd>2026-10-15T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PLEASANT TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318775</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>W44LC.CHXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.COXED</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.COXLO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.DJXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W44LC.DJXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.COXBJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.DJXCJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.DJXDU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>W45LS.SPXDJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318844</OutageID>
<PlannedStart>2026-09-21T11:30:00</PlannedStart>
<PlannedEnd>2026-10-01T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ALEXANDER JCT 4C2A-BO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00318871</OutageID>
<PlannedStart>2026-07-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-09T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OWEN SOUND TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319022</OutageID>
<PlannedStart>2026-07-09T13:35:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ERINDALE TS SC6</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00319976</OutageID>
<PlannedStart>2026-07-27T06:00:00</PlannedStart>
<PlannedEnd>2026-10-13T05:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRUCE A TS R25S</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320181</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>S6F.FAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320213</OutageID>
<PlannedStart>2026-07-23T17:00:00</PlannedStart>
<PlannedEnd>2026-09-30T17:01:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS H2-H3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320325</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 1 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARKHAM MTS 1 T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320414</OutageID>
<PlannedStart>2026-09-21T04:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A4L: ALEXANDER SS x Longlac TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320539</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS A1HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS HT23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS KWT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L7HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS PWT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS SS23-T23R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-WT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT23-WT23GIS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT23GIS_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS WT23_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320552</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>T22C.CHXMJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.MJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>T22C.MJXOT</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320555</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>C27P.GAXCF</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C27P.GAXDO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320604</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>X1H.CAXHI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1H.DEXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1H.LAXDE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X1H.LAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320658</OutageID>
<PlannedStart>2026-09-07T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320659</OutageID>
<PlannedStart>2026-09-17T14:00:00</PlannedStart>
<PlannedEnd>2026-10-13T12:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>THIRD LINE TS T3-WT3</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320758</OutageID>
<PlannedStart>2026-07-29T14:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS SC2</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>OSHAWA GM TS SC3</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320783</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K7: KARN TS x COMMERCE WAY TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00320905</OutageID>
<PlannedStart>2026-09-01T10:00:00</PlannedStart>
<PlannedEnd>2026-12-15T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1A-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS 1T3-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS H1T2-X2H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GARDINER TS T3Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WESTBROOK JCT STRG27X2H-TEMP1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321109</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS 58-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T2-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T2X</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3-N7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IMPERIAL OIL SARNIA CTS T3T</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321137</OutageID>
<PlannedStart>2026-09-21T09:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>P26W.AUXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P26W.AUXWA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321360</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-10-02T06:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS A15_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS A16_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321387</OutageID>
<PlannedStart>2026-08-06T15:30:00</PlannedStart>
<PlannedEnd>2026-10-15T14:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLERGUE TS 148</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321415</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>S7M.15X34</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.73XME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.BRX73</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.MAXBR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>S7M.SSXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321444</OutageID>
<PlannedStart>2026-08-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>S6F.FAXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321461</OutageID>
<PlannedStart>2026-08-03T13:22:00</PlannedStart>
<PlannedEnd>2026-10-23T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321707</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNB1B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNQ2-L2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNQ2T2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNT1B1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNT2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIAN MTS CBNT2B2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321708</OutageID>
<PlannedStart>2026-09-14T06:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS T2-E34M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>TERRY FOX MTS T2Q</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321724</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ1-L1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ1T1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ2-L1</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLQ2T2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLT1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PIPERVILLE MTS PVLT2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321741</OutageID>
<PlannedStart>2026-08-31T06:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARTSHORE TS 1404</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOGG1.1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00321926</OutageID>
<PlannedStart>2026-08-13T06:40:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STIRTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322017</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>C3S.CFXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXAR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.ARXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CEXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CHXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.CJXNQ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.FIXNQ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.LIXWO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.MAXMD</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.NQXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.NQXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C7BM.WOXCE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322019</OutageID>
<PlannedStart>2026-08-20T17:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MACKENZIE TS TMP4</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322022</OutageID>
<PlannedStart>2026-09-21T02:00:00</PlannedStart>
<PlannedEnd>2026-09-23T17:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS DL43-D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ST. CLAIR POWER CGS DL43-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322070</OutageID>
<PlannedStart>2026-08-15T12:39:00</PlannedStart>
<PlannedEnd>2026-11-11T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NAPANEE TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NAPANEE TS SC1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322076</OutageID>
<PlannedStart>2026-08-15T16:00:00</PlannedStart>
<PlannedEnd>2026-09-22T17:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q26M-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322157</OutageID>
<PlannedStart>2026-09-20T07:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BATHURST TS 85T1-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BATHURST TS 85T3-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>FINCH TS 55T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>IBM MARKHAM CTS T2-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.BAXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.BAXLE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.FIXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.FIXFI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.IBXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.LEXIB</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>P22R.PKXM1</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PARKWAY TS 52-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RICHVIEW TS 88-P22R</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322173</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>R2LB.BIXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>R2LB.LAXPI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322188</OutageID>
<PlannedStart>2026-09-01T10:00:00</PlannedStart>
<PlannedEnd>2026-12-14T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GARDINER TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322215</OutageID>
<PlannedStart>2026-09-15T14:00:00</PlannedStart>
<PlannedEnd>2026-10-16T14:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DECEW FALLS SS WT2-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322228</OutageID>
<PlannedStart>2026-09-01T00:00:00</PlannedStart>
<PlannedEnd>2027-04-30T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELORA JCT 656D6V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322233</OutageID>
<PlannedStart>2026-09-01T00:00:00</PlannedStart>
<PlannedEnd>2027-04-30T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HEDLEY JCT S39M-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322279</OutageID>
<PlannedStart>2026-08-19T09:47:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>TOMKEN TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322291</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T08:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 5125T1-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 T1A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 TIE AB</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 TIE BA</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN MTS #4 VAUGHAN MTS #4-T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322303</OutageID>
<PlannedStart>2026-08-20T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T10-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T11-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T12-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T7-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T8-W45LS</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CENTENNIAL TS 599T9-W44LC</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322426</OutageID>
<PlannedStart>2026-08-26T08:00:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WAWA TS DL1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322558</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-12-15T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MALVERN TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322595</OutageID>
<PlannedStart>2026-09-12T08:00:00</PlannedStart>
<PlannedEnd>2026-10-08T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLAIREVILLE TS 51-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXV4</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.4JXWJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HJX4J</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.HOXHJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H82V.WJXCL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS 153-H82V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS L82L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2-L82</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS T2Y</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>VAUGHAN 4 JCT 426H82V-MSO</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322604</OutageID>
<PlannedStart>2026-09-08T08:30:00</PlannedStart>
<PlannedEnd>2026-10-02T10:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>RED ROCK CGS JCT 38T1B-17</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RED ROCK CGS JCT 38T1B-69</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322616</OutageID>
<PlannedStart>2026-08-27T08:00:00</PlannedStart>
<PlannedEnd>2026-09-27T09:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HAWTHORNE TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322651</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M32W.IJXKA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.NEXMI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M32W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.NEXCA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXBU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M33W.SAXNE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322678</OutageID>
<PlannedStart>2026-09-21T16:30:00</PlannedStart>
<PlannedEnd>2026-09-22T07:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>SEAFORTH LSO JCT 61M18-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS 61-L7S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DBUS-TEMP2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS DTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS KTL7</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11-TL7</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>SEAFORTH TS T11B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>12 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322687</OutageID>
<PlannedStart>2026-08-27T16:00:00</PlannedStart>
<PlannedEnd>2026-12-31T07:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STAYNER TS T1D</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322696</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WHITBY TS T1E</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322767</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>REW</Recurrence>
<EquipmentRequested>
<EquipmentName>D5A.CUXGA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.CUXIS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.CUXO2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.HAXO2</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D5A.O2XOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.GAXCU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.HAXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.O2XBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H9A.O2XOR</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322893</OutageID>
<PlannedStart>2026-08-27T13:14:00</PlannedStart>
<PlannedEnd>2026-09-24T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L1LT22</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00322959</OutageID>
<PlannedStart>2026-08-19T08:26:00</PlannedStart>
<PlannedEnd>2026-12-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC22</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC22H</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC22H-H</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUCHANAN TS SC22SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323061</OutageID>
<PlannedStart>2026-09-15T08:00:00</PlannedStart>
<PlannedEnd>2026-10-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323083</OutageID>
<PlannedStart>2026-09-08T07:00:00</PlannedStart>
<PlannedEnd>2026-09-24T07:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS SS1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS SS1-X</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323106</OutageID>
<PlannedStart>2026-09-03T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>29M1.IGXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D26A.DIXDI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D26A.DNXMK</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>D26A.DRXDN</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2D.DRXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M2D.MOXIG</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323149</OutageID>
<PlannedStart>2026-08-22T14:33:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CARLAW TS T2A11</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323225</OutageID>
<PlannedStart>2026-09-01T09:26:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14KSC14</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LEASIDE TS SC14SC</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323233</OutageID>
<PlannedStart>2026-09-05T15:45:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DR_D1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CHATHAM SS DR_K1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323255</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 4 72B82</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 4 T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323360</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>A3M.MAXMO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323361</OutageID>
<PlannedStart>2026-09-08T08:00:00</PlannedStart>
<PlannedEnd>2026-10-01T18:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>M1S.MIXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M1S.MOXVA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323477</OutageID>
<PlannedStart>2026-09-09T17:45:00</PlannedStart>
<PlannedEnd>2026-11-05T17:00:00</PlannedEnd>
<Priority>I</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ELLIOTT LAKE TS JQ</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>INFO</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323479</OutageID>
<PlannedStart>2026-09-02T08:00:00</PlannedStart>
<PlannedEnd>2026-10-15T08:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS 30T8-H2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>PORCUPINE TS T8-HT8</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Day(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323483</OutageID>
<PlannedStart>2026-09-02T21:38:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS 45T2-V43</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KLEINBURG TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323555</OutageID>
<PlannedStart>2026-09-16T06:00:00</PlannedStart>
<PlannedEnd>2026-09-24T17:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q10P-LLO26</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ABITIBI CONSOLIDATED NAN91 JCT Q26M-Q10P</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ALLANBURG TS 45-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 2 TS 28-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MIDDLEPORT TS 25-Q26M</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.MIXAW</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.QUXAL</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>Q26M.QUXBE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323683</OutageID>
<PlannedStart>2026-09-21T04:30:00</PlannedStart>
<PlannedEnd>2026-09-25T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A8-A9</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A9-A10</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BECK 1 SS A9_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>GLENDALE TS T1-Q11S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323703</OutageID>
<PlannedStart>2026-09-15T07:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN JCT 321L13W-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN JCT 321L18W-32</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L13W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2L18W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>30 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323732</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-09-21T18:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L33P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323733</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>H23S.PEXMA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.PEXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>H23S.WIXHO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>1 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323734</OutageID>
<PlannedStart>2026-09-21T06:00:00</PlannedStart>
<PlannedEnd>2026-09-21T19:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>L34P.ROXLA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323771</OutageID>
<PlannedStart>2026-09-20T00:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 JZ1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 T2Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>CAMBRIDGE NORTH DUMFRIES MTS 1 ZJ2</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323817</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>15 Min(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323826</OutageID>
<PlannedStart>2026-09-21T11:30:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CLARINGTON TS K1L26</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>BTCT</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323849</OutageID>
<PlannedStart>2026-09-14T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MANORDALE MTS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANORDALE MTS T1-L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323859</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MARCHWOOD MTS MWD-CST2</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MARCHWOOD MTS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323933</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T15:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>C88H: CHATHAM SS x LAKESHORE TS</EquipmentName>
<EquipmentType>Line</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00323945</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3-Q12S</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3J1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BUNTING TS T3Q1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>6 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324003</OutageID>
<PlannedStart>2026-09-10T13:42:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GERRARD TS YA1</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324006</OutageID>
<PlannedStart>2026-09-10T14:25:00</PlannedStart>
<PlannedEnd>2026-09-30T22:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>WHITESHELL TS R24</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324051</OutageID>
<PlannedStart>2026-09-11T10:30:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38W12-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>INGERSOLL TS 38W7-19</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324053</OutageID>
<PlannedStart>2026-09-14T16:00:00</PlannedStart>
<PlannedEnd>2026-09-23T08:30:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>K11W.MAXRU</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>K11W.RUXWI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MANBY EAST TS 38-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T1-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS 11T6-K11W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T1J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T6</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>RUNNYMEDE TS T6Z</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>WILTSHIRE TS H2K11W</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>8 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324066</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:30:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS A1HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS L7HT23</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>BF PROT OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324086</OutageID>
<PlannedStart>2026-09-12T13:24:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HOLLAND TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HOLLAND TS SC1B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324099</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C3S.CFXSO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324154</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>C29C.CCXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C29C.EJXES</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C29C.EJXNJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C29C.LYXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C29C.LYXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C29C.NJXLJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>C29C.NJXNK</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L28C.GJXGS</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L28C.LAXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L28C.LYXCH</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L28C.LYXGJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>L28C.LYXKE</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324158</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-23T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BERMONDSEY TS T4-C14L</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324182</OutageID>
<PlannedStart>2026-09-21T05:00:00</PlannedStart>
<PlannedEnd>2026-09-25T17:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS AA3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>DOFASCO BAYFRONT CTS HH3</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324197</OutageID>
<PlannedStart>2026-09-20T06:15:00</PlannedStart>
<PlannedEnd>2026-10-03T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 6 K6T12-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 6 T12</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 6 T121B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 6 T122B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 8 K8T16-M20D</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 8 T16</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>KITCHENER MTS 8 T16B</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324253</OutageID>
<PlannedStart>2026-09-15T09:00:00</PlannedStart>
<PlannedEnd>2026-09-22T15:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T11</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>ESPLANADE TS T11-K</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324274</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>HANMER TS DR_J</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>HANMER TS DR_P</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>IS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>3 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324289</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>NOVA CORUNNA CTS 52M-0101A</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NOVA CORUNNA CTS T3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>NOVA CORUNNA CTS T3-L27V</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>2 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324298</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BEACH TS SS3</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T4</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BEACH TS T4-TL18</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>4 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324315</OutageID>
<PlannedStart>2026-09-18T08:30:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>STRACHAN TS A15_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T12A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>STRACHAN TS T14A15</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>24 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>FA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324319</OutageID>
<PlannedStart>2026-09-21T08:00:00</PlannedStart>
<PlannedEnd>2026-09-21T16:00:00</PlannedEnd>
<Priority>P</Priority>
<Recurrence>RE</Recurrence>
<EquipmentRequested>
<EquipmentName>M30A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M30A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.AJXEJ</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.ALXME</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>M31A.EJXHA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324343</OutageID>
<PlannedStart>2026-09-18T08:00:00</PlannedStart>
<PlannedEnd>2026-12-11T16:00:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B1S.ARXBA</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B1S.ARXNO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B1S.LOXNO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>B1S.LOXSI</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>HOLDOFF</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324404</OutageID>
<PlannedStart>2026-09-17T08:00:00</PlannedStart>
<PlannedEnd>2026-09-30T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>GALT TS SC1</EquipmentName>
<EquipmentType>Capacitor</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324440</OutageID>
<PlannedStart>2026-09-20T06:30:00</PlannedStart>
<PlannedEnd>2026-12-31T23:59:00</PlannedEnd>
<Priority>O</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>MERIVALE TS T23-HT23</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>AA</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324512</OutageID>
<PlannedStart>2026-09-21T07:00:00</PlannedStart>
<PlannedEnd>2026-09-25T16:00:00</PlannedEnd>
<Priority>FE</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRANT TS 12-B13BL</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS DTL13</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS T2-TL13</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRANT TS TL13_BUS</EquipmentName>
<EquipmentType>Bus</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>48 Hour(s)</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324571</OutageID>
<PlannedStart>2026-09-19T12:02:00</PlannedStart>
<PlannedEnd>2026-10-31T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BOWMANVILLE SS R56-X527B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LENNOX TS 12-X527B</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>X527B.LEXBO</EquipmentName>
<EquipmentType>LineSection</EquipmentType>
<EquipmentVoltage>500 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324589</OutageID>
<PlannedStart>2026-09-20T08:00:00</PlannedStart>
<PlannedEnd>2026-09-28T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>B5D-B31L SS JCT 93B5D-Q</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324613</OutageID>
<PlannedStart>2026-09-21T08:56:00</PlannedStart>
<PlannedEnd>2026-09-30T08:56:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS 31T14-L14W</EquipmentName>
<EquipmentType>Disconnect</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>BRIDGMAN TS T14</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>115 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324640</OutageID>
<PlannedStart>2026-09-19T08:00:00</PlannedStart>
<PlannedEnd>2026-10-05T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>CHATHAM SS D2L88</EquipmentName>
<EquipmentType>Breaker</EquipmentType>
<EquipmentVoltage>230 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Non-recallable</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
<OutageRequest>
<OutageID>1-00324657</OutageID>
<PlannedStart>2026-09-21T13:10:00</PlannedStart>
<PlannedEnd>2026-09-22T16:00:00</PlannedEnd>
<Priority>F</Priority>
<Recurrence>C</Recurrence>
<EquipmentRequested>
<EquipmentName>LAKE TS SS2</EquipmentName>
<EquipmentType>PowerTransformer</EquipmentType>
<EquipmentVoltage>50 kV</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRequested>
<EquipmentName>LAKE TS UFLS1</EquipmentName>
<EquipmentType>UFLS</EquipmentType>
<EquipmentVoltage>NULL</EquipmentVoltage>
<ConstraintType>OOS</ConstraintType>
</EquipmentRequested>
<EquipmentRecallTime>Immediate</EquipmentRecallTime>
<OutageRequestStatus>IMPL</OutageRequestStatus>
</OutageRequest>
</DocBody>